Performance Analysis Subcommittee (PAS)
 
Reports and References
Size Date Description
< 1 MB 12/5/2012 Draft Condition Driven Index Whitepaper
5 MB 10/7/2011 2011 Risk Assessment of Reliability Performance Report
Templates and Letters
Size Date Description
< 1 MB 3/30/2012 ALR1-5 System Voltage Performance Reporting Submittal Form
2 MB 3/31/2011 Protection System Misoperation Reporting Template
< 1 MB 2/28/2011 Q&A on Consistent Misoperation Reporting
< 1 MB 9/18/2012 Proposed Protection System Misoperation Reporting Template (To become effective for 2012Q4 reporting)
< 1 MB 9/10/2010 ALR3-5 IROL/SOL Excursion Reporting Template
Metrics Team
Size Date Description
< 1 MB 11/13/2012 Proposed ALR3-6
< 1 MB 11/13/2012 Proposed ALR3-7
< 1 MB 7/16/2012 Proposed ALR5-1
< 1 MB 7/16/2012 Proposed ALR6-4
< 1 MB 1/6/2012 Metrics Team Call #2 Notes
< 1 MB 1/6/2012 Metrics Team Call #1 Notes (Aggregated set of requested metric review topics from RMWG)
Index Team
Size Date Description
< 1 MB 7/3/2012  Standards Driven Index Whitepaper
< 1 MB 3/14/2012 Event Driven Index Whitepaper
< 1 MB 3/19/2012 Sandia National Labs Statistical Reliability Measure Recommendations
< 1 MB 8/23/2011 Integrated Reliability Index Draft
< 1 MB 8/23/2011 Integrated Reliability Index Draft Comments
419 KB 5/6/2011 Severity Risk Index Document - May 6, 2011
595 KB 8/30/2010 Integrated Bulk Power System Risk Assessment Concepts
Related Files
Size Date Description
< 1 MB 12/14/2011 PAS Scope (Approved by the Operating Committee and Planning Committee on 12/13/2011)