TIS Archives
 
Related Files - 2010
Acrobat 3,283 KB 03/01/10

Fault Induced Delayed Voltage Recovery (FIDVR) Workshop

Related Files - 2009
Acrobat 101 KB 06/24/09 Transmission Issues Subcommittee (TIS) Scope
Acrobat 392 KB 06/12/09 Technical Reference Paper - Fault-Induced Delayed Voltage Recovery (FIDVR)(Version1.2)
Zipped 3,311 KB 06/30/09 Reactive Support and Control Whitepaper and SAR
Acrobat 2 89 KB 0 5/11/09

Fault-Induced Delayed Voltage Recovery (FIDVR) Technical Reference Paper (Version 1.1) - Approved by the NERC Planning Committee on March 18, 2009

Related Files - 2006
File Type Size Date Description
Acrobat 54 KB 09/13/06 Guidelines for Developing an Under Voltage Load Shedding (U VLS) Evaluation Program
Approved by the NERC Planning Committee on September 13, 2006
Related Files - 2005
Acrobat 1,697 KB 11/28/05 Appendix C - Regional Summary Reports on Planning Practices and Procedures  --  Evaluation of Criteria, Methods, and Practices Used in System Design, Planning, and Analysis Response to NERC Blackout Recommendation 13c
Acrobat 123 KB 05/20/05 "Evaluation of Reactive Power Planning and Voltage Control Practices in Response to NERC Blackout Recommendation 7a" report (approved by NERC Board of Trustees May 3, 2005)
Zipped 11,867 KB 04/13/05 Blackout Recommendation 13c Regional Presentations to TIS