FAC-003-2
To maintain a reliable electric transmission system by using a defense-in-depth strategy to manage vegetation located on transmission rights of way (ROW) and minimize encroachments from vegetation located adjacent to the ROW, thus preventing the risk of those vegetation-related outages that could lead to Cascading.
 
expand Category : Development History ‎(1)
expand Category : Filings and Orders ‎(4)
  
  
FAC-003-2_Imp_Plan_clean_092911.pdfImplementation Plan