Archived Reliability Standards Under Development
​From this page you can keep track of and link to closed Reliability Standards and miscellaneous projects.

 

Projects - Closed
2006-01 Project 2006-01 System Personnel Training    
2006-02 Project 2006-02: Assess Transmission Future Needs and Develop Transmission Plans
​2006-03 System Restoration and Blackstart - EOP-001, EOP-005 EOP-006       
​2006-04 Back-up Facilities - EOP-008
​2006-06 Reliability Coordination - COM-001, COM-002, IRO-001
​2006-07 ATC/TTC/AFC and CBM/TRM Revisions
​2006-08 Reliability Coordination – Transmission Loading Relief
​2007-01 Underfrequency Load Shedding - EOP-003, PRC-006
​2007-02 Operating Personnel Communications Protocols - COM-002
​2007-03 Real-time Transmission Operations - TOP-001, TOP-002, TOP-003, TOP-004, TOP-005, TOP-006, TOP-007, TOP-008, PER-001
​2007-04 Project 2007-04 Certifying System Operators
​2007-05 Project 2007-05 Balancing Authority Controls  
​2007-06 System Protection Coordination - PRC-027​, Retirement of PRC-001
2007-06.2 Phase 2 of System Protection Coordination - PER-006-1, Retirement of PRC-001
​2007-07 Vegetation Management
​2007-09 Generator Verification - MOD-025, MOD-026, MOD-027, PRC-024
​2007-11 Disturbance Monitoring - PRC-002
​2007-12 Frequency Response - BAL-003
​2007-17 Protection System Maintenance and Testing - PRC-005
​2007-17.2 Protection System Maintenance and Testing - Phase 2 (Reclosing Relays) - PRC-005
​​2007-17.3 (PRC-005-X) Protection System Maintenance and Testing - Phase 3 (Sudden Pressure Relays) - PRC-005
​2007-17.4 PRC-005 FERC Order No. 803 Directive - PRC-005 (Maintenance of supervisory devices associated with automatic reclosing)
​2007-18 Reliability-based Control - Various BAL standards, EOP-002, IRO-005
​2008-01 Voltage and Reactive Control
2008-02 Undervoltage Load Shedding (UVLS) & Underfrequency Load Shedding (UFLS) - PRC-006, PRC-010
2008-02.2 Phase 2 of Undervoltage Load Shedding (UVLS): Misoperations - PRC-004, PRC-010
2008-04 Facility Ratings
​2008-06 Cyber Security Order 706 Version 5 CIP Standards - CIP-002, CIP-003, CIP-004, CIP-005, CIP-006, CIP-007, CIP-008, CIP-009, CIP-010, CIP-011
2008-10 Interpretation - CIP-006 - Cyber Security ― Physical Security of Cyber Security Assets
​2008-11 Interpretation ― VAR-002-1 ― Voltage and Reactive ― Generator Operations for Maintaining Network Voltage Schedules
​2008-12 Coordinate Interchange Standards - INT-004, INT-006, INT-009, INT-010, INT-011
2008-18 Interpretation −TOP-005-1 and IRO-005-1 − Manitoba Hydro
​2009-01 Disturbance Sabotage Reporting - EOP-004
​2009-02 Real-time Reliability Monitoring and Analysis Capabilities - IRO-018-1, TOP-010-1
​2009-03 Emergency Operations - EOP-011
2009-05 Resource Adequacy Assessments
​2009-06 Facility Ratings - FAC-008
2009-07 Reliability of Protection Systems
​2009-08 Nuclear Plant Interface Coordination - NUC-001
2009-09 Interpretation of CIP-001-1 − Cyber Security — Sabotage Reporting for Covanta Energy
​2009-10 Interpretation − PRC-005-1, R1 – CMPWG - PRC-005
2009-11 Interpretation IRO-010-1 WECC RCS
2009-12 Interpretation − CIP-005-1 − Cyber Security − Electronic Security Perimeters by PacifiCorp
​2009-14 Interpretation − TPL-002-0 − PacifiCorp
2009-15 Interpretation − MOD-001-1 − Available Transmission System Capability and MOD-029-1 − Rated System Path Methodology by NYISO
​2009-17 Interpretation of PRC-004-1 and PRC-005-1 for Y-W Electric and Tri-State - PRC-004
2009-18 Withdraw Three Midwest ISO Waivers
2009-19 Interpretation of BAL-002-0 R4 and R5 by NWPP Reserve Sharing Group
​2009-20 Interpretation of BAL-003-0.1b for Energy Mark, Inc.
​2009-21 Cyber Security Ninety-Day Response - CIP-003, ​CIP-007
2009-22 Interpretation of COM-002-2 — Communications and Coordination R2 for the ISO/RTO Council
2009-26 Interpretation of CIP-004-1
2009-27 Interpretation of TOP-002-2a R10
2009-28 Interpretation of EOP-001-1 and EOP-001-2 R2.2
2009-31 Interpretation of TOP-001-1 R8
​2010-01 Training - PER-005
​2010-02 Connecting New Facilities to the Grid - FAC-001, FAC-002
​2010-03 Modeling Data (MOD B) - MOD-032, MOD-033
​2010-04 Demand Data (MOD C) - MOD-031
​2010-04.1 MOD-031 FERC Order No. 804 Directives - MOD-031 (Clarification of demand reporting obligations)
​2010-05.1 Protection System (Misoperations) - PRC-004
​​2010-05.2 Phase 2 of Protection Systems - EOP-004, FAC-010, FAC-011, MOD-029, MOD-030, PRC-001, PRC-005, PRC-012, PRC-013, PRC-014, PRC-015, PRC-016, PRC-017, PRC-023, TPL-001, TPL-002, TPL-003, TPL-004
​2010-05.3 Phase 3 of Protection Systems: Remedial Action Schemes (RAS) - PRC-012, PRC-013, PRC-014, PRC-015, PRC-016
​​2010-07 Generator Requirements at the Transmission Interface - FAC-001, FAC-003
​2010-07.1 Vegetation Management - FAC-003
2010-08 Functional Model Glossary Revisions
2010-09 Cyber Security Order 706B Nuclear Plant Implementation Plan - CIP-003, ​CIP-007
​2010-10 FAC Order 729 - FAC-013
​2010-11 TPL Table 1 Order - TPL-001
​2010-12 Order 693 Directives - PRC-004
​2010-13.1 Phase 1 of Relay Loadability: Transmission
​2010-13.2 Phase 2 Relay Loadability: Generation - PRC-023, PRC-025
​2010-13.3 Phase 3 of Relay Loadability: Stable Power Swings​ - PRC-026
2010-14.1 Phase 1 of Balancing Authority Reliability-based Controls: Reserves - BAL-001
​2010-14.1 Phase 1 of Balancing Authority Reliability-based Controls - BAL-002
2010-14.2 Periodic Review of BAL StandardsBAL-005, BAL-006
​2010-14.2.1 Phase 2 of Balancing Authority Reliability-based Controls - BAL-005, BAL-006, FAC-001
​2010-14.2.2 Phase 2 of Balancing Authority Reliability-based Controls - BAL-004
2010-16 Definition of System Operator
2010-17 Proposed Definition of Bulk Electric System
​2011-INT-01 Revision of MOD-028-1 to address FPL Request for Interpretation - MOD-028
2011-INT-02 Rapid Revision of VAR-002 to address Constellation Request for Interpretation
​2012-05 ATC Revisions (MOD A) - MOD-001
2012-09 IRO Five-Year Review
​2012-13 NUC - Nuclear Plant Interface Coordination - NUC-001
​2012-INT-02 Interpretation − TPL-003-0a and TPL-004-0 for SPCS
2013-01 Cold Weather
​​2013-02 Paragraph 81
​2013-03 Geomagnetic Disturbance Mitigation - EOP-010, TPL-007
​2013-04 Voltage & Reactive Control - VAR-001, VAR-002
​2014-01 Standards Applicability for Dispersed Generation Resources - PRC-001, PRC-004, PRC-005, PRC-019, PRC-024, VAR-002
​2014-02 Critical Infrastructure Protection Standards Version 5 Revisions - CIP-003, CIP-004
​2014-03 Revisions to TOP and IRO Standards - TOP-003
​2014-04 Physical Security - ​CIP-014
2015-02 Periodic Review of Emergency Operations - EOP-004, EOP-005, EOP-006, EOP-008
​2015-03 Periodic Review of System Operating Limit Standards- FAC-010, FAC-011, FAC-014
​2015-04 Alignment of Terms
2015-06 Interconnection Reliability Operations and Coordination - IRO-006-EAST, IRO-009
2015-07 Internal Communications Capabilities - COM-001
​2015-08 Emergency Operations - EOP-004, EOP-005, EOP-006, EOP-008
2015-09 Establish and Communicate System Operating Limits - FAC-010, FAC-011, FAC-014
​2015-10 Single Points of Failure - TPL-001
​​2015-INT-01 Interpretation of CIP-002-5.1 for Energy Sector Security (EnergySec)
​​2015-INT-02 Interpretation of CIP-007-5 for Foxguard Solutions
​2015-INT-03 Interpretation of TOP-002-2.1b for FMPP
2016-EPR-01 Enhanced Periodic Review of Personnel Performance, Training, and Qualifications Standards - PER-001, PER-003, PER-004
​2016-EPR-02 Enhanced Periodic Review of Voltage and Reactive Standards - VAR-001, VAR-002
​​2016-01 Modifications to TOP and IRO Standards
​2016-03 Cyber Security Supply Chain Risk Management - CIP-005-6, CIP-010-3, CIP-013-1
​2016-04 Modifications to PRC-025-1
​2017-02 Modifications to to Personnel Performance, Training, and Qualifications Standards - PER-003, PER-004 
​​2017-03 FAC-008-3 Periodic Review
​​2017-04 Periodic Review of Interchange Scheduling and Coordination Standards - INT-004, INT-006, INT-009, INT-010
​​2017-05 NUC-001-3 Periodic Review
​2017-06 Modifications to BAL-002-2
​2017-07 Standards Alignment with Registration
​2018-01 Canadian-specific Revisions to TPL-007-2
​2018-02 Modifications to CIP-008 Cyber Security Incident Reporting
2018-03 FAC-008-3 Standards Efficiency Review Retirements
​2018-04 Modifications to PRC-024-2
2019-01 Modifications to TPL-007-3
2019-02 BES Cyber System Information Access Management
2019-03 Cyber Security Supply Chain Risks
​2019-05 Modifications to PER-003-2
2019-06 Cold Weather
​2020-01 Modifications to MOD-032-1
2016 Enhanced Periodic Review Standing Review Team - Standards Grading
2017 Periodic Review Standing Review Team - Standards Grading
2018 Periodic Review Standing Review Team - Standards Grading
2020 Periodic Review Standing Review Team - Standards Grading
2021 Periodic Review Standing Review Team - Standards Grading​
2018 Bulk Electric System Definition Reference
Consensus Building Options
Cost Effectiveness Pilot - TPL-001
Cost Effective Analysis Process (CEAP) for NERC ERO Standards
Order 754
Operate Within Interconnection Reliability Operating Limits
Revisions to the NERC Standards Processes Manual
Standards Processes Manual Revisions to Implement SPIG Recommendations 2013
 

​ ​