Projects - Closed |
2006-01 Project 2006-01 System Personnel Training |
2006-02 Project 2006-02: Assess Transmission Future Needs and Develop Transmission Plans |
2006-03 System Restoration and Blackstart - EOP-001, EOP-005 EOP-006 |
2006-04 Back-up Facilities - EOP-008 |
2006-06 Reliability Coordination - COM-001, COM-002, IRO-001 |
2006-07 ATC/TTC/AFC and CBM/TRM Revisions |
2006-08 Reliability Coordination – Transmission Loading Relief |
2007-01
Underfrequency Load Shedding - EOP-003, PRC-006 |
2007-02
Operating Personnel Communications Protocols - COM-002 |
2007-03
Real-time Transmission Operations - TOP-001, TOP-002, TOP-003, TOP-004, TOP-005, TOP-006, TOP-007, TOP-008, PER-001 |
2007-04 Project 2007-04 Certifying System Operators |
2007-05 Project 2007-05 Balancing Authority Controls |
2007-06
System Protection Coordination - PRC-027, Retirement of PRC-001 |
|
2007-07 Vegetation Management |
2007-09
Generator Verification - MOD-025, MOD-026, MOD-027, PRC-024 |
2007-11
Disturbance Monitoring - PRC-002 |
2007-12
Frequency Response - BAL-003 |
|
2007-17
Protection System Maintenance and Testing - PRC-005 |
2007-17.2
Protection System Maintenance and Testing - Phase 2 (Reclosing Relays) - PRC-005 |
2007-17.3
(PRC-005-X) Protection System Maintenance and Testing - Phase 3 (Sudden Pressure Relays) - PRC-005 |
2007-17.4
PRC-005 FERC Order No. 803 Directive
- PRC-005 (Maintenance of supervisory devices associated with automatic reclosing) |
2007-18
Reliability-based Control - Various BAL standards, EOP-002, IRO-005 |
2008-01 Voltage and Reactive Control |
2008-02
Undervoltage Load Shedding (UVLS) & Underfrequency Load Shedding (UFLS) - PRC-006, PRC-010 |
2008-02.2
Phase 2 of Undervoltage Load Shedding (UVLS): Misoperations
- PRC-004, PRC-010 |
2008-04 Facility
Ratings |
2008-06
Cyber Security Order 706 Version 5 CIP Standards - CIP-002, CIP-003, CIP-004, CIP-005, CIP-006, CIP-007, CIP-008, CIP-009, CIP-010, CIP-011 |
2008-10 Interpretation
- CIP-006 - Cyber Security ― Physical Security of Cyber Security Assets |
2008-11 Interpretation ― VAR-002-1 ― Voltage and Reactive ― Generator Operations for Maintaining Network Voltage Schedules |
2008-12
Coordinate Interchange Standards - INT-004, INT-006, INT-009, INT-010, INT-011 |
2008-18 Interpretation
−TOP-005-1 and IRO-005-1 − Manitoba Hydro |
2009-01
Disturbance Sabotage Reporting - EOP-004 |
2009-02
Real-time Reliability Monitoring and Analysis Capabilities - IRO-018-1, TOP-010-1 |
2009-03
Emergency Operations - EOP-011 |
2009-05 Resource
Adequacy Assessments |
2009-06
Facility Ratings - FAC-008 |
2009-07 Reliability
of Protection Systems |
2009-08
Nuclear Plant Interface Coordination - NUC-001 |
2009-09 Interpretation
of CIP-001-1 − Cyber Security — Sabotage Reporting for Covanta Energy |
2009-10
Interpretation − PRC-005-1, R1 – CMPWG - PRC-005 |
2009-11 Interpretation
IRO-010-1 WECC RCS |
2009-12 Interpretation
− CIP-005-1 − Cyber Security − Electronic Security Perimeters by PacifiCorp |
2009-14 Interpretation − TPL-002-0 − PacifiCorp |
2009-15 Interpretation
− MOD-001-1 − Available Transmission System Capability and MOD-029-1 − Rated
System Path Methodology by NYISO |
2009-17 Interpretation of PRC-004-1 and PRC-005-1 for Y-W Electric and Tri-State - PRC-004 |
2009-18 Withdraw
Three Midwest ISO Waivers |
2009-19 Interpretation
of BAL-002-0 R4 and R5 by NWPP Reserve Sharing Group |
2009-20 Interpretation of BAL-003-0.1b for Energy Mark, Inc. |
2009-21
Cyber Security Ninety-Day Response - CIP-003, CIP-007 |
2009-22 Interpretation
of COM-002-2 — Communications and Coordination R2 for the ISO/RTO Council |
2009-26 Interpretation
of CIP-004-1 |
2009-27 Interpretation
of TOP-002-2a R10 |
2009-28 Interpretation
of EOP-001-1 and EOP-001-2 R2.2 |
2009-31 Interpretation
of TOP-001-1 R8 |
2010-01
Training - PER-005 |
2010-02
Connecting New Facilities to the Grid - FAC-001, FAC-002 |
2010-03
Modeling Data (MOD B) - MOD-032, MOD-033 |
2010-04
Demand Data (MOD C) - MOD-031 |
2010-04.1
MOD-031 FERC Order No. 804 Directives - MOD-031 (Clarification of demand reporting obligations) |
2010-05.1
Protection System (Misoperations) - PRC-004 |
2010-05.2
Phase 2 of Protection Systems - EOP-004, FAC-010, FAC-011, MOD-029, MOD-030, PRC-001, PRC-005, PRC-012, PRC-013, PRC-014, PRC-015, PRC-016, PRC-017, PRC-023, TPL-001, TPL-002, TPL-003, TPL-004 |
2010-05.3
Phase 3 of Protection Systems: Remedial Action Schemes (RAS) - PRC-012, PRC-013, PRC-014, PRC-015, PRC-016 |
2010-07
Generator Requirements at the Transmission Interface - FAC-001, FAC-003 |
2010-07.1
Vegetation Management - FAC-003 |
2010-08 Functional
Model Glossary Revisions |
2010-09
Cyber Security Order 706B Nuclear Plant Implementation Plan - CIP-003, CIP-007 |
2010-10
FAC Order 729 - FAC-013 |
2010-11
TPL Table 1 Order - TPL-001 |
2010-12
Order 693 Directives - PRC-004 |
2010-13.1 Phase 1 of Relay Loadability: Transmission |
2010-13.2
Phase 2 Relay Loadability: Generation - PRC-023, PRC-025 |
2010-13.3
Phase 3 of Relay Loadability: Stable Power Swings - PRC-026 |
2010-14.1
Phase 1 of Balancing Authority Reliability-based Controls: Reserves - BAL-001 |
2010-14.1
Phase 1 of Balancing Authority Reliability-based Controls
- BAL-002 |
2010-14.2
Periodic Review of BAL Standards - BAL-005, BAL-006 |
2010-14.2.1
Phase 2 of Balancing Authority Reliability-based Controls - BAL-005, BAL-006, FAC-001 |
2010-14.2.2
Phase 2 of Balancing Authority Reliability-based Controls - BAL-004 |
2010-16 Definition
of System Operator |
2010-17 Proposed Definition
of Bulk Electric System
|
2011-INT-01
Revision of MOD-028-1 to address FPL Request for Interpretation - MOD-028 |
2011-INT-02 Rapid
Revision of VAR-002 to address Constellation Request for Interpretation |
2012-05
ATC Revisions (MOD A) - MOD-001 |
2012-09
IRO Five-Year Review |
2012-13 NUC -
Nuclear Plant Interface Coordination - NUC-001 |
2012-INT-02
Interpretation − TPL-003-0a and TPL-004-0 for SPCS |
2013-01 Cold
Weather |
2013-02 Paragraph 81 |
2013-03
Geomagnetic Disturbance Mitigation - EOP-010, TPL-007 |
2013-04
Voltage & Reactive Control - VAR-001, VAR-002 |
2014-01
Standards Applicability for Dispersed Generation Resources - PRC-001, PRC-004, PRC-005, PRC-019, PRC-024, VAR-002 |
2014-02 Critical Infrastructure Protection Standards Version 5 Revisions - CIP-003, CIP-004 |
2014-03 Revisions to TOP and IRO Standards - TOP-003 |
2014-04
Physical Security - CIP-014 |
2015-02
Periodic Review of Emergency Operations
- EOP-004, EOP-005, EOP-006, EOP-008 |
2015-03 Periodic Review of System Operating Limit Standards- FAC-010, FAC-011, FAC-014 |
2015-04 Alignment of Terms |
2015-06 Interconnection Reliability Operations and Coordination - IRO-006-EAST, IRO-009 |
2015-07
Internal Communications Capabilities - COM-001 |
2015-08
Emergency Operations - EOP-004, EOP-005, EOP-006, EOP-008 |
2015-09 Establish and Communicate System Operating Limits - FAC-010, FAC-011, FAC-014
|
2015-10 Single Points of Failure - TPL-001 |
2015-INT-01
Interpretation of CIP-002-5.1 for Energy Sector Security (EnergySec) |
2015-INT-02
Interpretation of CIP-007-5 for Foxguard Solutions |
2015-INT-03
Interpretation of TOP-002-2.1b for FMPP |
2016-EPR-01 Enhanced
Periodic Review of Personnel Performance, Training, and Qualifications
Standards - PER-001, PER-003, PER-004 |
2016-EPR-02 Enhanced Periodic Review of Voltage and Reactive Standards - VAR-001, VAR-002 |
2016-01
Modifications to TOP and IRO Standards |
2016-03
Cyber Security Supply Chain Risk Management
- CIP-005-6, CIP-010-3, CIP-013-1 |
2016-04 Modifications to PRC-025-1 |
2017-02 Modifications to to Personnel Performance, Training, and Qualifications Standards - PER-003, PER-004 |
2017-03 FAC-008-3 Periodic Review |
2017-04 Periodic Review of Interchange Scheduling and Coordination Standards - INT-004, INT-006, INT-009, INT-010 |
2017-05 NUC-001-3 Periodic Review |
2017-06 Modifications to BAL-002-2 |
2017-07 Standards Alignment with Registration |
2018-01 Canadian-specific Revisions to TPL-007-2 |
2018-02 Modifications to CIP-008 Cyber Security Incident Reporting |
2018-03 FAC-008-3 Standards Efficiency Review Retirements
|
2018-04 Modifications to PRC-024-2 |
2019-01 Modifications to
TPL-007-3 |
2019-02 BES Cyber System Information Access Management
|
2019-03 Cyber Security Supply Chain Risks
|
2019-05 Modifications to PER-003-2
|
2019-06 Cold Weather
|
2020-01 Modifications to MOD-032-1 |
2016 Enhanced Periodic Review Standing Review Team - Standards Grading |
2017 Periodic Review Standing Review Team - Standards Grading |
2018 Periodic Review Standing Review Team - Standards Grading |
2020 Periodic Review Standing Review Team - Standards Grading
|
2021 Periodic Review Standing Review Team - Standards Grading
|
2018 Bulk Electric System Definition Reference |
Consensus Building Options |
Cost Effectiveness Pilot - TPL-001 |
Cost Effective Analysis Process (CEAP) for NERC ERO Standards |
Order 754 |
Operate Within Interconnection Reliability Operating Limits |
Revisions to the NERC Standards Processes Manual |
|
Standards Processes Manual Revisions to Implement SPIG Recommendations 2013 |