The final ballot for PRC-024-3 – Generator Frequency and Voltage Protection Settings concluded 8 p.m. Eastern, Friday, December 13, 2019. The voting results can be accessed via the link below. The standard will be submitted to the Board of Trustees for adoption and then filed with the appropriate regulatory authorities.
Background
On November 27, 2018, the NERC Operating Committee (OC) and Planning Committee (PC) submitted a Standard Authorization Request (SAR) prepared by the Inverter-Based Resource Performance Task Force (IRPTF), which reports to the OC and PC.
Based off the analyses of the Blue Cut Fire and Canyon 2 Fire disturbances in southern California along with the development of the PRC-024-2 Gaps Whitepaper, the IRPTF identified potential modifications to PRC-024-2 to ensure that inverter-based generator owners, operators, developers, and equipment manufacturers understand the intent of the standard in order for their plants to respond to grid disturbances in a manner that contributes to the reliable operation of the BPS.
The standard drafting team developed the proposed modifications in PRC-024-3 to address the issues in the SAR.
Standard(s) Affected – PRC-024-2