Project 2007-01 Underfrequency Load Shedding

Related Files

Status
Board Adopted: November 4, 2010

Filed with FERC: March 31, 2011

Order Effective

Enforcement Date

Purpose/Industry Need:
PRC-006 — Development and Documentation of Regional Reliability Organizations’ Underfrequency Load Shedding Programs
PRC-007 — Assuring Consistency with Regional UFLS Programs
PRC-009 — UFLS Performance Following an Underfrequency Event
The purpose of revising the above standards is to:

  1. Provide an adequate level of reliability for the North American bulk power systems – ensure each of the standards are complete and the requirements are set at an appropriate level to ensure reliability.
  2. Ensure they are enforceable as mandatory reliability standards with financial penalties - the applicability to bulk power system owners, operators, and users, and as appropriate particular classes of facilities, is clearly defined; the purpose, requirements, and measures are results-focused and unambiguous; the consequences of violating the requirements are clear.
  3. Incorporate other general improvements described in NERC’s Reliability Standards Development Plan: 2007-2009 (summarized and outlined in the Reliability Standard Review Guidelines attached as Appendix A).
  4. Consider the items mentioned in the Standard Review Forms (excerpted from NERC’s Reliability Standards Development  Plan: 2007-2009) attached as Appendix B, prepared by the NERC staff, which attempt to capture comments from the:
    • FERC NOPR (Docket # RM06-16-00 dated October 20, 2006),
    • FERC staff report dated May 11, 2006 concerning NERC standards submitted with ERO application,
    • Version 0 standards development (see note 1), and
    • Regional Fill-in-the-Blank Team (RRSWG ? a NERC working group involved with regional standards development).
    • The standard drafting team should also consider any other issues that were not completely captured but were stated or referenced in the above materials.
  5. Consider issues raised by the industry during the posting of the SAR for Project 2007-01 during the first comment period from November 29, 2006 through January 12, 2007, attached as Appendix C
  6. Satisfy the standards procedure requirement for five-year review of the standards.
Draft Action Dates Results Consideration of Comments
Draft 6
PRC-006-1
Clean | Redline to Last Ballot  

EOP-003-2
Clean | Redline to Last Approval

Implementation Plan
Clean

Supporting Materials

Last approved version of standards absorbed into PRC-006-1:

PRC-006-0 — Development and Documentation of Regional UFLS Programs

PRC-007-0 — Assuring Consistency with Regional UFLS Program Requirements

PRC-009-0 — UFLS Performance Following an Underfrequency Event
Recirculation Ballot

Info>> Vote>>
October 18-28, 2010
(closed)
Summary>>

Full Record>>
 
Draft 5
PRC-006-1
Clean | Redline to Last Ballot

EOP-003-2
Clean | Redline to Last Ballot

Implementation Plan
Clean | Redline to Last Ballot

Supporting Materials:
VRF/VSL Justification
Justification for Quebec Variance
Justification for WECC Variance
Successive  Ballot and Non-binding VRF/VSL Poll

Vote>>

Info>>

Info_Extension>>
9/24/2010 - 10/4/2010
(closed)
Summary>>

Full Record>>

Non-binding Poll Results>>
Consideration of Comments >>

Consideration of Poll Opinions>>
Draft 4
Underfrequency Load Shedding Program Requirements and Proposed Continent-wide Standard

PRC-006-1
Clean | Redline to Initial Ballot

EOP-003-1
Clean | Redline to Initial Ballot

Implementation Plan
Clean | Redline to Initial Ballot
Second Ballot

Vote>> | Info>>
7/24/2010 - 8/3/2010
(closed)
Summary>>

Full Record>>
Consideration of Comments>>
 
Draft 3
Underfrequency Load Shedding Program Requirements and Proposed Continent-wide Standard

PRC-006-1
Clean | Redline to last posting

EOP-003-1
Clean | Redline

Implementation Plan
Clean | Redline

Supporting Materials:
Comment Form(Word)

Review of FERC Issues from Database

Supplemental SAR
Initial Ballot and Non-binding VRF/VSL Poll

Vote>> | Info>>
7/8/2010 - 7/17/2010
(closed)
Full Record>>

Non-binding Poll Results>>

Summary>>
Consideration of Comments>>

Consideration of Poll Opinions>>
Pre-ballot Review

Join>> | Info>>
6/11/2010 - 7/2/2010
(closed)
 
Comment Period

Submit Comments>>

Info>>
6/11/2010 - 7/16/2010
(closed)
Comments Received>> Consideration of Comments>>
 
Draft 2
Underfrequency Load Shedding Program Requirements and Proposed Continent-wide Standard

PRC-006-1

Supporting Materials:
Comment Form (Word)
Mapping Document
Comment Period

Info>>

Submit Comments>>
4/21/2009 - 5/21/2009
(closed)
Comments Received>> Consideration of Comments>>
 
Draft 1

Underfrequency Load Shedding Regional Reliability Standards Characteristics

Draft 1
UFLS Characteristics

Supporting Materials:
Comment Form (Word)
Implementation Plan
Comment Period

Info>>

Submit Comments>>
7/2/2008 – 8/15/2008
(closed)
Comments Received>> Consideration of Comments>>
 
Draft 3

Draft SAR Version 3
Clean | Redline from last posting
Standard Drafting Team Nominations

Info>>

Submit Nomination>>
  3/15/2007 -3/29/2007
(closed)
 
 
Draft 2
Underfrequency Load Shedding

Draft SAR Version 2 (Revised)
Clean | Redline from 1st posting
Comment Period

Info>>

Submit Comments>>
2/8/2007 – 3/9/2007
(closed)
Comments Received>> Consideration of Comments>>
 
Draft 1
Underfrequency Load Shedding
Posted for 30-day Comment Period

Draft SAR Version 1
Comment Period
SAR Drafting Team Nominations

Info>>

Submit Comments>>

Submit Nominations>>
11/29/2006 – 1/12/2007
(closed)

Comment Period
  11/29/2006 – 12/12/2006
(closed)
Nomination Period
Comments Received>> Consideration of Comments>>