Project 2006-07 ATC/TTC/AFC and CBM/TRM Revisions
Related Files

Status:
The drafting team is working on responding to the comments received from the VRF Analysis and Recommendations Report that was posted for a 21-day comment period ending on January 28, 2009.


The NERC Board of Trustees adopted the MOD-001, MOD-008, MOD-028, MOD-029, and MOD-030 standards during its August 26, 2008 conference call.  The standards have been approved by FERC (MOD-001-1, MOD-008-1, MOD-028-1, MOD-029-1, MOD030-2).  The Board has deferred action on the Violation Risk Factors for these standards, pending further analysis. 

Purpose/Industry Need:
The ATC/TTC/AFC Revision SAR proposes changing MOD-001-0 by adding a requirement for transmission providers to coordinate the calculation of ATC and requires that specific reliability practices be incorporated into the ATC calculation and coordination methodologies.  Such changes will enhance the reliable use of the transmission system without needlessly limiting commercial activity. This request adds a requirement for documentation of the methodologies used to coordinate ATC.  In addition, a requirement is added for the enhanced documentation of the calculation methodology.

The CBM/TRM Revisions SAR proposes changing existing standards on TRM to require crisp and clear documentation of the calculation of TRM and make various components of the methodology mandatory so there is more consistency across methodologies.

MOD-030-2 Status:
The recirculation ballot results are posted below.  The standard was approved and will be submitted to the NERC Board of Trustees for adoption

Purpose/Industry Need:
Requirements 2 and 11 of MOD-030-1 will be modified.

     

Proposed Standard

Supporting
Material

Comment
Period

Comments
Received

Response to Comments

 
Project 2006-07 - ATC/TTC and CMB/TRM
Posted for 10-day Recirculation Ballot Window
 
MOD-030-2
Clean | Redline to Last Posting
Implementation Plan
1/20/2009 – 1/29/2009
(closed)
 
 
 
 
ATC Violation Risk Factor Analysis and Recommendations Report for a 21-day comment period
VRF Analysis and Recommendations Report
1/7/2009 - 1/28/2009
(closed)
 
 
Comments Received
 

Consideration of Comments>>

Final Staff Recommendation>>

 
Project 2006-07 - ATC/TTC and CMB/TRM
Posted for 10-day Ballot Window
 
MOD-030-2
Clean | Redline to Last Posting
 
12/1/2008–12/10/2008
(closed)
 
10-day Ballot Window
 
 
 
 
Project 2006-07 - ATC/TTC and CMB/TRM
Posted for 30-day Pre-ballot Review and Join Ballot Pool
 
MOD-030-2
Clean | Redline to Last Posting
Implementation Plan
10/28/2008–11/26/2008
(closed)
 
30-day Pre-ballot Review and Join Ballot Pool
   
 
Project 2006-07 - ATC/TTC and CMB/TRM
Posted for 10-day Recirculation Ballot Window
 
MOD-004-1
Clean | Redline to Last Posting
Implementation Plan
Clean | Redline to Last Posting
10/28/2008–11/6/2008
(closed)
 
 
10-day Recirculation Ballot
 
 
 
Project 2006-07 - ATC/TTC and CMB/TRM
Posted for 10-day Ballot Window
 
 
MOD-004-1
Clean | Redline to Last Posting
Implementation Plan
Clean | Redline to Last Posting

 

 

9/11/2008 – 9/21/2008
(closed)
 
10-day Ballot Window

 

 

Announcement

Ballot Results

Ballot Comments

 

Response to Comments

Project 2006-07 - ATC/TTC and CBM/TRM
 
 
Posted for Board of Trustees Adoption August 22, 2008
 
 
MOD-001-1
Clean | Redline to last posting
 
MOD-008-1
Clean | Redline to last posting
 
MOD-028-1
Clean | Redline to last posting
 
MOD-029-1
Clean | Redline to last posting

 

 
 
MOD-030-1
Clean | Redline to last posting

 

 

MOD-001-1 Implementation Plan

 

 

MOD-008-1 Implementation Plan

 

 

MOD-028-1 Implementation Plan

 

MOD-029-1

 

Implementation Plan

 

 

MOD-030-1

 

Implementation Plan

 

     

 

 
Project 2006-07 - ATC/TTC and CMB/TRM
10-day Recirculation Ballot Window
 
MOD-001-1
Clean | Redline to last posting
 
MOD-008-1
Clean | Redline to last posting
 
MOD-028 1
Clean | Redline to last posting
 
MOD-029-1
Clean | Redline to last posting
 
MOD-030-1

 

Clean | Redline to last posting

 

MOD-001-1 Implementation Plan
Clean | Redline
Process Steps

MOD-008-1 Implementation Plan
Clean | Redline
Process Steps

MOD-028-1 Implementation Plan
Clean | Redline
Process Steps

MOD-029-1

Implementation Plan
Clean | Redline
Process Steps

 

MOD-030-1

Implementation Plan
Clean | Redline
Process Steps

8/12/2008 – 8/21/2008
(closed)

Recirculation Ballot

 
 
Recirculation Ballot Results
 
 
 
 
 
Project 2006-07 - ATC/TTC and CBM/TRM
Posted for 30-day Pre-ballot Window and Ballot Pool
 
MOD-004-1
Clean | Redline to Last Posting
Implementation Plan
Clean | Redline to Last Posting

8/12/2008 – 9/11/2008
(closed)

Pre-Ballot Window and Ballot Pool

   
Project 2006-07 - ATC/TTC and CBM/TRM
Posted for 45-day Comment Period
 
MOD-030-2
Clean | Redline to recirculation version
 
 
Implementation Plan
8/12/2008 – 9/24/2008
(closed)
 
 
Comments



Response to Comments

  
ATC/TTC and CBM/TRM - Project 2006-07
10-day Ballot Window

  

July 21–July 30, 2008
(closed)

Announcement

ATC/TTC and CBM/TRM - Project 2006-07
30-day Pre-ballot Review

  

June 20–July 21, 2008
(closed)

 

MOD-001-1

 

Clean | Redline to last posting

 

 

Implementation Plan
 

 

 

 

 

 
 

 

 

MOD-008-1
Clean | Redline to last posting

 

 

Implementation Plan
 

 

 

 

 

 
 

 

 

MOD-028-1
Clean | Redline to last posting

 

 

Implementation Plan
 

 

 

 

 

 
 

 

 

MOD-029-1
Clean | Redline to last posting

 

 

Implementation Plan
 

 

 

 

 

 
 

 

 

MOD-030-1
Clean | Redline to last posting

 

 

Implementation Plan
 

 

 

 

 

 
 

 

 
Project 2006-07 - ATC/TTC and CBM/TRM Posted for 30-day Comment Period
 
MOD-004-1
Clean | Redline to Last Posting
 
NOTE: NAESB is in the process of developing the ATC business practices related to transparency and other commercial issues, including postbacks.  To view NAESB's current work, please go to http://naesb.org/weq/weq_atc_afc.asp
Implementation Plan
Clean | Redline to Last Posting
5/23/2008 – 6/23/2008
(closed)
 
 
Comments

 

  Consideration of Comments

Announcement

 

30-day Comment Period for Project 2006-07
ATC/TTC and CBM/TRM

 

 

April 16-May 15, 2008
(closed)

 

NOTE: NAESB is in the process of developing the ATC business practices related to transparency and other commercial issues, including postbacks.  To view NAESB's current work, please go to http://naesb.org/weq/weq_atc_afc.asp.

 

MOD-001-1
Clean | Redline to last posting

 

NOTE: NAESB is in the process of developing the ATC business practices related to transparency and other commercial issues, including postbacks.  To view NAESB's current work, please go to http://naesb.org/weq/weq_atc_afc.asp .

 

Implementation Plan
Clean | Redline to Last Posting

 

 

 

 

Comments

Consideration of Comments

 

MOD-008-1
Clean | Redline to last posting

 

NOTE: NAESB is in the process of developing the ATC business practices related to transparency and other commercial issues, including postbacks.  To view NAESB's current work, please go to http://naesb.org/weq/weq_atc_afc.asp .

 

Implementation Plan
Clean | Redline to Last Posting

 

 

 

 

Comments

Consideration of Comments

 

MOD-028-1
Clean | Redline to last posting

 

NOTE: NAESB is in the process of developing the ATC business practices related to transparency and other commercial issues, including postbacks.  To view NAESB's current work, please go to http://naesb.org/weq/weq_atc_afc.asp .

Implementation Plan
Clean | Redline to Last Posting

 

 

 

Comments

Consideration of Comments

 

MOD-029-1
Clean | Redline to last posting

 

NOTE: NAESB is in the process of developing the ATC business practices related to transparency and other commercial issues, including postbacks.  To view NAESB's current work, please go to http://naesb.org/weq/weq_atc_afc.asp .

 

Implementation Plan
Clean | Redline to Last Posting

 

 

 

 

Comments

Consideration of Comments

 

MOD-030-1
Clean | Redline to last posting

 

NOTE: NAESB is in the process of developing the ATC business practices related to transparency and other commercial issues, including postbacks.  To view NAESB's current work, please go to http://naesb.org/weq/weq_atc_afc.asp .

 

Implementation Plan
Clean | Redline to Last Posting

 

 

 

 

Comments

Consideration of Comments

Announcement

Ballot Windows Project 2006-07 - ATC/TTC and CBM/TRM

 

March 3-12, 2008
(closed)

 

 

 

 

Announcement

Initial Ballot Results

Link to Ballot Summary and Comments

 

MOD-001-1
Clean | Redline to last posting

 

Implementation Plan

 

 

  Consideration of Comments

 

MOD-004-1
Clean | Redline to last posting

 

Implementation Plan

 

 

  Consideration of Comments

 

MOD-008-1
Clean | Redline to last posting

 

Implementation Plan

 

 

  Consideration of Comments

 

MOD-028-1
Clean | Redline to last posting

 

Implementation Plan

 

 

  Consideration of Comments

 

MOD-029-1
Clean | Redline to last posting

 

Implementation Plan

 

 

Consideration of Comments

 

MOD-030-1
Clean | Redline to last posting

 

Implementation Plan

 

 

  Consideration of Comments

Announcement

Pre-ballot Windows and Ballot Pools Open for Project 2006-07

 

ATC/TTC and CBM/TRM

 

 

February 1-March 3, 2008
(closed)

 

 

MOD-001-1
Clean | Redline to last posting

 

Implementation Plan

 

 

 

 

MOD-004-1
Clean | Redline to last posting

 

Implementation Plan

 

 

 

 

MOD-008-1
Clean | Redline to last posting

 

Implementation Plan

 

 

 

 

MOD-028-1
Clean | Redline to last posting

 

Implementation Plan

 

 

 

 

MOD-029-1
Clean | Redline to last posting

 

Implementation Plan

 

 

 

 

MOD-030-1
Clean | Redline to last posting

 

Implementation Plan

 

 

 

Announcement

 

Draft 
Available Transfer Capability Standards
Posted for 45-day Comment Period

 

 

 

10/31/2007 - 12/14/2007
(closed)

 

Comment Form

Comments

Consideration of Comments

MOD-001-1

Implementation Plan

Summary of FERC Directives in FERC Orders 693 and 890 and Corresponding NERC Standards and Requirements

 

 

 

MOD-004-1

 

 

 

MOD-008-1

 

 

 

MOD-028-1

 

 

 

MOD-029-1 (revised)

 

 

 

MOD-030-1

 

 

 

Announcement

 

Draft 
Available Transfer Capability Standards
Posted for 30-day Comment Period
May 25 through June 25, 2007 (closed)

 

 

 

 

 

MOD-001-1

 

Summary of Changes to the Structure of the Standards for ATC

 

Comment Form

Comments

Consideration of Comments

MOD-004-1

Comment Form

Attachment 1

Comments

Consideration of Comments
(revised)

MOD-008-1

Comment Form

Attachment 1

Comments

Consideration of Comments

MOD-028-1

Comment Form

Comments

Consideration of Comments

MOD-029-1

Comment Form

Comments

Consideration of Comments

MOD-030-1

Comment Form

Comments

Consideration of Comments

Final Supplemental ATC SAR

 

 

 

 

 

 

 

Announcement

Supplemental ATC SAR

Comment Form

Nomination Form
5/25/2007 - 6/8/2007

 (closed)

Comments

Consideration of Comments 

Announcement

 

Draft 1
Standard MOD-001-1
Posted for 30-day Comment Period
February 15 through March 16, 2007

 

 

MOD-001-1

 

Clean | Redline to Version 0

 

 

2/15/2007 - 3/16/2007

(closed)

 

Comment Form

Comments

Consideration of Comments

Final SAR: ATC/TTC/AFC

Final SAR: CBM/TRM

CBM Minority Opinion

 

 

 

Draft SAR Version 1: ATC/TTC/AFC Revision

Draft SAR Version 1: CBM/TRM Revision

 

7/8/2005 - 8/8/2005

(closed)

Comments

Responses

To download a file click on the file using your right mouse button, then save it to your computer in a directory of your choice.


All comments should be forwarded to sarcomm@nerc.net.