IRO-006-EAST-1

To provide an Interconnection-wide transmission loading relief procedure (TLR) for the Eastern Interconnection that can be used to prevent and/or mitigate potential or actual System Operating Limit (SOL) and Interconnection Reliability Operating Limit (IROL) exceedances to maintain reliability of the Bulk Electric System (BES).

 

 
expand Grouping : Development History ‎(1)
  
  
4b_TLR_Levels_reference_document.pdfReference: TLR Levels
IRO-006-5_IMP_PLAN_clean_20100820.pdfImplementation Plan