Status:
All but four standards in this set have been approved by the NERC BOT. Field testing of the generator capability verification (2) and protection and control (2) standards is expected to continue into 2007.
Purpose/Industry Need:
Certain planning standards that were part of the Phase III-IV NERC compliance program were not included in the Version 0 reliability standards. The Version 0 drafting team, supported by industry comments, realized it could not achieve industry consensus on these specific standards in the timeframe or within the scope of the Version 0 standards project. These standards are important, nonetheless, as they contain critical reliability requirements in support of recommendations from the NERC and U.S./Canada Power System Outage Task Force reports on the August 14, 2003 blackout. Recognizing the importance of these standards, the NERC board resolved on October 15, 2004, that: "A satisfactory resolution of the issues regarding Phases III and IV of the planning standards would be to: (1) develop reliability standards covering the Phase III and Phase IV issues separate from the Version 0 effort, using the NERC standards development process; (2) have the Planning Committee expeditiously complete the drafting of the proposed standards needed to address the Phase III and Phase IV issues, and move those standards through the NERC standards development process as promptly as possible, but not later than the May 2005 board meeting." This SAR proposes the development of reliability standards that address the disturbance monitoring and reporting requirements of those Phase III-IV planning standards.
Proposed Standard |
Supporting Materials |
Comment Period |
Comments Received |
Response to Comments |
Draft 6 Set 1 PRC-002-1 and PRC-018-1 Posted for Board of Trustees Adoption - August 2, 2006
|
Implementation Plan |
|
|
|
Draft 5 Set 2 VAR-001 and VAR-002 Posted for Board of Trustees Adoption - August 2, 2006
|
Implementation Plan |
|
|
|
Draft 6 Set 1 PRC-002-1 and PRC-018-1 Posted for Initial Ballot July 6 through July 15, 2006
|
Implementation Plan |
Re-circulation Ballot Ended 7/6/2006 - 7/15/2006 |
|
Ballot Results |
Draft 5 Set 2 VAR-001 and VAR-002 Posted for Initial Ballot July 6 through July 15, 2006
|
|
Re-circulation Ballot Ended 7/6/2006 - 7/15/2006 |
|
Ballot Results |
Draft 6 Set 1 PRC-002-1 and PRC-018-1 Posted for Initial Ballot June 14 through June 26, 2006
|
|
Initial Ballot Ended
6/14/2006 - 6/26/2006 |
|
Ballot Results |
Draft 5 Set 2 VAR-001 and VAR-002 Posted for Initial Ballot June 15 through June 26, 2006
|
|
Initial Ballot Ended 6/15/2006 - 6/26/2006 |
|
Ballot Results |
Draft 4 Set 2 Posted for 30-day Pre-ballot Review May 15 through June 14, 2006
|
|
30-day Pre-ballot Review 5/15/06 - 6/14/2006 |
|
|
Draft 5 Set 1 Posted for 30-day Pre-ballot Review May 15 through June 14, 2006
|
|
30-day Pre-ballot Review 5/15/2006 - 6/14/2006 |
|
|
Draft 4 Set 1 Posted for 30-day Comment Period April 4 through May 3, 2006
|
|
4/4/2006 - 5/3/2006 (Comment Period Ended) |
|
|
Draft 3 Set 2 Posted for 45-day Comment Period March 1, 2006 - April 15, 2006
|
|
3/1/2006 - 4/15/2006 (Comment Period Ended) |
|
|
Draft 3 Set 1
|
|
12/1/2005 - 1/17/2006 |
|
|
Draft 3 Set 1
|
|
|
|
|
Draft 2 Set 2
|
|
10/19/2005 - 12/3/2005 |
|
|
Draft 2 Set 1
|
|
9/1/2005 - 10/15/2005 |
|
|
|
|
4/22/2005 - 6/13/2005 |
|
|
|
|
|
|
|