RM05-17-000, RM05-25-000 and RM06-16-000
​Informational Filing of NERC of Reliability Standards Development Plan 2015-2017

NERC submits its 2015-2017 Reliability Standards Development Plan.

12/31/2014
RM15-8-000
​Petition for Approval of Proposed Reliability Standard PRC-026-1

NERC submits a petition for approval of proposed Reliability Standard PRC-026-1 (Relay Performance During Stable Power Swings).

12/31/2014
RM15-7-000
​Petition for Approval of Proposed Reliability Standard EOP-011-1

NERC submits a petition for approval of proposed Reliability Standard EOP-011-1 (Emergency Operations) and the revised definition of "Energy Emergency".

12/29/2014
RM13-7-000
​NERC Informational Filing Regarding Commissioning Testing of Protection Systems

NERC submits an informational filing on its progress on a variety of projects to examine the issue of commissioning testing of Protection Systems.

12/19/2014
RM15-9-000
Petition for Approval of Proposed Reliability Standard PRC-005-4

NERC submits a petition for approval of proposed Reliability Standard PRC-005-4 (Protection System, Automatic  Reclosing, and Sudden Pressure Relaying Maintenance), one new (Sudden Pressure Relaying) and four revised definitions (Protection System Maintenance Program, Component Type, Component, and Countable Event), the implementation plan, and the Violation Risk Factors ("VRFs") and the revised Severity Levels (VSLs").

12/18/2014
RD15-1-000
​Joint Petition of NERC and WECC for Approval of Proposed Regional Reliability Standards VAR-002-WECC-2 and VAR-501-WECC-2

NERC submits a joint petition for approval of proposed regional Reliability Standards VAR-002-WECC-2 and VAR-501-WECC-2.

12/15/2014
RM15-4-000
Petition for Approval of Proposed Reliability Standard PRC-002-2

NERC submits a petition for approval of proposed Reliability Standard PRC-002-2 (Disturbance Monitoring and Reporting Requirements).

12/15/2014
RD15-2-000
Petition for Approval of Proposed Reliability Standard PRC-006-2

NERC submits a petition for approval of proposed Reliability Standard PRC-006-2 (Automatic Underfrequency Load Shedding).

12/15/2014
RR15-4-000
Petition for Approval of Risk-Based Registration Initiative Rules of Procedure Revisions

NERC submits a petition for approval of Rules of Procedure revisions to implement the Risk-Based Registration initiative. Proposed revisions include: Section 302, Section 501, Appendix 2 - Definitions Used in the Rules of Procedure, Appendix 5A - Organization Registration and Certification Manual, and Appendix 5B - Statement of Compliance Registry Criteria.

12/11/2014
RM14-13-000
Comments of NERC in Response to NOPR COM-001-2 (Communications) and COM-002-4 (Operating Personnel Communications Protocols)

NERC submits comments in response to the Notice of Proposed Rulemaking (NOPR) proposing to approve Reliability Standards COM-001-2 (Communications) and COM-002-4 (Operating Personnel Communications Protcols).

12/1/2014
RM14-12-000
​Comments of NERC in Response to NOPR MOD-031-1 (Demand and Energy Data)

NERC submits comments in response to the Notice of Proposed Rulemaking (NOPR) proposing to approve Reliability Standard MOD-031-1 (Demand and Energy Data).

12/1/2014
RR14-8-000
Errata to the Petition of NERC for Approval of the Bylaws and RSDP of WECC

NERC submits an errata to the petition for approval of amendments to the Delegation Agreement with Western Electricity Coordinating Council (WECC) - amendments to the WECC Bylaws and Reliability Standards Development Procedures (RSDP).

11/21/2014
RR15-3-000
 
NERC submits a petition for approval of amendments to the Delegation Agreement with Florida Reliability Coordinating Council, Inc. (FRCC) – amendments to Exhibit B - the FRCC Bylaws.
 
11/19/2014
FA11-21-000
Compliance Filling in Response to January 16 Order

NERC submits an unaudited report of NERC’s budget-to-actual variance information for the third quarter of 2014. This compliance filing is in accordance with the January 16, 2013 Order, which approved a Settlement Agreement between the FERC Office of Enforcement and NERC, related to findings and recommendations arising out of its 2012 performance audit of NERC.

11/14/2014
RR15-2-000
​Informational Filing of NERC Regarding Implementation of the Reliability Assurance Initiative

NERC submits an informational filing describing the various processes and programs developed and deployed through the ERO Enterprise's Reliability Assurance Initiative (RAI).

11/3/2014
RR14-7-000
​Errata to the Petition of NERC for Approval of Amendments to Regional RSPM of NPCC

NERC submits an errata to the petition for approval of the proposed Northeast Power Coordinating Council, Inc. (NPCC) Regional Standard Processes Manual (RSPM).

10/28/2014
RR14-6-000
​Status Report to the 2015 Business Plan and Budget Filing - Update on Crisp Implementation

NERC submits a status report regarding CRISP implementation to the 2015 Business Plan and Budget Filing.

10/28/2014
RR15-1-000
​Petition to Approve the WECC Data Request Process

NERC submits this petition to approve the Western Electricity Coordinating Council (WECC) Data Request Process, in accordance with the NERC Rules of Procedure Section 1604.2.

10/23/2014
RR14-6-001
 
NERC submits certain revisions to the 2015 Business Plan and Budget of Peak Reliability, Inc. to reflect additional revenues from the British Columbia Hydro and Power Authority.
 
10/14/2014
EL14-104-000
​Answer of NERC to the Complaint filed by the MPSC

NERC submits an answer to the complaint filed by the Michigan Public Service Commission (MPSC).

10/9/2014
EL14-103-000
Motion of NERC to Intervene and Comment on the Complaint filed by the Mines

NERC submits a motion to intervene and comment on the complaint filed by Tilden Mining Company L.C. and Empire Iron Mining Partnership (the Mines).

10/9/2014
AD14-19-000
Informational Filing of NERC Regarding Commissioner Philip D. Moeller’s Inquiry into the Trading of Natural Gas, and the Proposal to Establish an Electronic Information and Trading Platform

NERC submits an informational filing regarding a report which  analyzed the weather conditions that occurred in early January of 2014 known as a polar vortex, where frigid arctic condition dipped down to much lower latitudes than normal, resulting in extreme cold weather.

10/1/2014
RM13-12-000, RM13-14-000 and RM13-15-000
​NERC TOP/IRO Third Quarterly Status Report

NERC submits its third quarterly report regarding the status of revisions to the Transmission Operations (TOP) and Interconnection Reliability Operations and Coordination (IRO) Reliability Standards.

10/1/2014
RR10-1-000 and RR13-3-000

NERC submits the 2014 Annual Report on Wide-Area Analysis of Technical Feasibility Exceptions (TFEs) in compliance with Paragraphs 220 and 221 of FERC Order No. 706, FERC’s January 21, 2010 Order Approving TFE Procedures and Ordering Compliance Filing, September 3, 2013 Order Approving Revisions, and Appendix 4D of the NERC Rules of Procedure.

9/30/2014
RM14-8-000
Comments of NERC in Response to NOPR PRC-005-3 (Protection System and Automatic Maintenance)

NERC submits comments in response to the Notice of Proposed Rulemaking (NOPR) proposing to approve Reliability Standard PRC-005-3 (Protection System and Automatic Reclosing Maintenance).

9/29/2014
RR14-8-000
​Petition of NERC for Approval of the Bylaws and RSDP of WECC

NERC submits a petition for approval of amendments to the Delegation Agreement of the Western Electricity Coordinating Council (WECC).

9/16/2014
RR14-7-000
​Petition of NERC for Approval of Amendments to Regional RSPM of NPCC

NERC submits a petition for approval of the proposed Northeast Power Coordinating Council, Inc. (NPCC) Regional Standard Processes Manual (RSPM).

9/15/2014
RD14-13-000
​Petition of NERC for Approval of Proposed Reliability Standard NUC-001-3

NERC submits a petition for approval of proposed Reliability Standard NUC-001-3 (Nuclear Plant Interface Coordination).

9/15/2014
RD14-14-000
Petition of NERC for Approval of Proposed Reliability Standard PRC-004-3

NERC submits a petition for approval of proposed Reliability Standard PRC-004-3 (Protection System Misoperation Identification and Correction).

9/15/2014
RM14-15-000
​Comments of NERC in Response to NOPR CIP-014-1 (Physical Security)

NERC submits comments in response to Notice of Proposed Rulemaking (NOPR) proposing to approve Reliability Standard CIP-014-1 (Physical Security).

9/8/2014
RM12-1-000, RM13-9-000, RM13-11-000 and RM13-16-000
​NERC Revisions to the VRFs and VSLs to Certain Reliability Standards

NERC submits proposed revisions to various violation risk factors (VRFs) and violation severity levels (VSLs) associated with certain Transmission Planning (TPL) Reliability Standards, Generator Verification (MOD) Reliability Standards, and Frequency Response and Frequency Bias Setting (BAL) Reliability Standards.

8/29/2014
RR14-5-000
​NERC Reply Comments in Five-Year Assessment

NERC submits reply comments in Docket No. RR14-5-000.

8/27/2014
RM14-7-000
​Comments of NERC in Response to NOPR MOD-001-2 (Available Transmission System Capability)

NERC submits comments in response to the Notice of Proposed Rulemaking (NOPR) proposing to approve Reliability Standard MOD-001-2 (Available Transmission System Capability).

8/25/2014
RR14-5-000
​Request for Change in Official Service List
 
NERC submits a request to change the official service list in Docket No. RR14-5-000.
 
8/25/2014
RD14-4-000
​​Petition of NERC for Approval of Errata to Interchange Scheduling and Coordination Reliability Standards

NERC submits a petition for approval of errata to four Reliability Standards, INT-004-3 (Dynamic Transfers), INT-009-2 (Implementation of Interchange), INT-010-2 (Interchange Initiation and Modification for Reliability, and INT-011-1 (Intra Balancing Authority Transaction Identification).

8/22/2014
RD14-12-000
​Petition of NERC for Approval of Proposed Reliability Standards for Facility Connection Requirements FAC-001-2 and FAC-002-2

NERC submits a petition for approval of proposed Reliability Standards FAC-001-2 and FAC-002-2.

8/22/2014
RR14-6-000
​Request for Acceptance of NERC's 2015 Business Plan and Budget Filing and the 2015 Business Plans and Budgets of the Regional Entities

NERC submits its request for acceptance of NERC's 2015 Business Plan and Budget Filing and the 2015 Business Plans and Budgets of the Regional Entities and for the approval of proposed assessments to fund budgets.

8/22/2014
FA11-21-000
​Compliance Filling in Response to January 16 Order

NERC submits an unaudited report of NERC’s budget-to-actual variance information for the second quarter of 2014. This compliance filing is in accordance with the January 16, 2013 Order, which approved a Settlement Agreement between the FERC Office of Enforcement and NERC, related to findings and recommendations arising out of its 2012 performance audit of NERC.

8/14/2014
RM12-4-000 and RM12-4-001
​Informational Filing in Response to Order No. 777

NERC submits an informational filing to provide an interim status update on NERC's testing to develop empirical data regarding the flashover between conductors and vegetation ("Project").

7/31/2014
RM14-10-000
​​Informational Filing of NERC Interim Report on Balancing Authority ACE Limit Field Trial

NERC submits for informational purposes a preliminary field report evaluating the effect of revisions to proposed Reliability Standard BAL-001-2 (Real Power Balancing Control Performance).

7/31/2014
RD14-4-000
Informational Filing of NERC Regarding Petition for Approval of Proposed Reliability Standards for Interchange Scheduling and Coordination

NERC submits an informational filing regarding an inconsistency in the implementation plan and effective date language in Reliability Standards INT-004-3 (Dynamic Transfers), INT-009-2 (Implementation of Interchange), INT-010-2 (Interchange Initiation and Modification for Reliability), and INT-011-1 (Intra Balancing Authority Transaction Identification).

7/30/2014
RR13-9-003
​Petition for Approval of a Special Assessment to Fund 2014 Budget of Peak Reliability, Inc.

NERC submits a request for a special assessment to be collected from load-serving entities in the U.S. portion of the Western Electricity Coordinating Council (WECC) region to fund the approved budget of Peak Reliability, Inc.

7/23/2014
RR14-5-000
Five-Year ERO Performance Assessment Report

NERC hereby submits its Five-Year Electric Reliability Organization (ERO) Performance Assessment Report, in accordance with the requirements of the Commission’s regulations at 18 C.F.R. §39.3(c).

7/21/2014
RM13-12-000, RM13-14-000 and RM13-15-000
​NERC TOP/IRO Second Quarterly Status Report 

NERC submits its second quarterly report regarding the status of revisions to the Transmission Operations (TOP) and Interconnection Reliability Operations and Coordination (IRO) Reliability Standards.

7/1/2014
RC11-6-004
 
NERC submits a compliance filing and twelve-month report on the Find, Fix, Track and Report (FFT) program, in response to FERC's June 20, 2013 order, and proposes an enhancement to the FFT program.
 
6/20/2014
RD14-11-000
​Petition of NERC for Approval of Proposed Reliability Standards VAR-001-4 and VAR-002-3 and the Retirement of Reliability Standards VAR-001-3 and VAR-002-2b

NERC submits a petition for approval of proposed Reliability Standards VAR-001-4 (Voltage and Reactive Control) and VAR-002-3 (Generator Operation for Maintaining Network Voltage Schedules) as well as the retirement of currently effective Reliability Standards VAR-001-3 and VAR-002-2b.

6/9/2014
RR14-3-000
Petition for Approval of Amendments to the Delegation Agreement with SERC – Amendments to Exhibit B (the SERC Bylaws)

NERC submits a petition for approval of amendments to the Delegation Agreement with SERC Reliability Corporation (SERC) – amendments to Exhibit B - the SERC Bylaws. The primary purpose of these amendments is to: (i) support SERC’s application for tax-exempt status under § 501(c)(6) of the Internal Revenue Code and (ii) clarify and modify certain SERC-specific corporate governance matters.

6/6/2014
RM14-8-000
Errata to Petition of NERC for Approval of Proposed Reliability Standard PRC-005-3

NERC submits an errata to properly capitalize definitions "Automatic Reclosing" and "Component" used in Reliability Standard PRC-005-3.

6/4/2014
RM13-7-000 and RM14-8-000
NERC Revisions to a Violation Severity Level Assigned to Protection System Maintenance Reliability Standards

NERC submits a proposed revision to a violation severity level assigned to Requirement R1 in Protection System Maintenance Reliability Standard PRC-005-2. The same change was proposed for Reliability Standard PRC-005-3.

6/4/2014
RM06-16-000
First Quarter 2014 Compliance Filing of NERC in Response to Paragraph 629 of Order No. 693

NERC submits the First Quarter 2014 compliance filing in response to Paragraph 629 of Order No. 693. Order No. 693 requires that NERC provide a quarterly informational filing regarding the timeframe to restore power to the auxiliary power systems of U.S. nuclear power plants following a blackout as determined during simulations and drills of system restoration plans. This filing contains the referenced material pertaining to the first quarter of 2014.​

5/30/2014
RR14-4-000
​NERC 2013 True-Up - Report of Comparisons of Budgeted to Actual Costs for 2013 for NERC and the Regional Entities

NERC submits a filing to provide comparisons of actual to budgeted costs for the year 2013 for NERC and the eight Regional Entities.​

5/30/2014
RD14-10-000

NERC submits a motion requesting to discontinue obligations to: (i) collect data and (ii) provide quarterly informational filings, pursuant to the Commission's directive in Paragraph 629 of Order No. 693.

5/30/2014
RM14-15-000
Petition of NERC for Approval of Proposed Reliability Standard CIP-014-1

NERC submits a petition for approval of proposed Reliability Standard CIP-014-1 (Physical Security).

5/23/2014
FA11-21-000
 
NERC submits an unaudited report of NERC’s budget-to-actual variance information for the first quarter of 2014. This compliance filing is in accordance with the January 16, 2013 Order, which approved a Settlement Agreement between the FERC Office of Enforcement and NERC, related to findings and recommendations arising out of its 2012 performance audit of NERC.
 
5/15/2014
RM14-13-000
​Errata to Petition of NERC for Approval of Proposed Reliability Standards COM-001-2 and COM-002-4

NERC submits an errata to the petition of NERC for approval of proposed Reliability Standards COM-001-2 and COM-002-4. The petition incorrectly noted that Requirement R1 of Reliability Standard EOP-008-1 is proposed for retirement. The implementation plans referenced in the petition list the correct proposed retirements for approval.

5/15/2014
RM13-5-000
NERC Revisions to the VRFs and VSLs Assigned to Certain CIP Reliability Standards

NERC submits proposed revisions to certain violation risk factors (VRFs) and violation severity levels (VSLs) assigned to certain Critical Infrastructure Protection (CIP) Reliability Standards for FERC approval.

5/15/2014
RM14-13-000
Petition of NERC for Approval of Proposed Reliability Standards COM-001-2 and COM-002-4

NERC submits a petition for approval of proposed Reliability Standards COM-001-2 (Communications) and COM-002-4 (Operating Personnel Communications Protocols).

5/14/2014
RM14-12-000
​Petition of NERC for Approval of Proposed Reliability Standard MOD-031-1 and Retirement of Reliability Standards MOD-016-1.1, MOD-017-0.1, MOD-018-0, MOD-019-0.1, and MOD-021-1

NERC submits a petition for approval of proposed Reliability Standard MOD-031-1 (Demand and Energy Data) and the retirement of currently effective Reliability Standards MOD-016-1.1, MOD-017-0.1, MOD-018-0, MOD-019-0.1, and MOD-021-1.

5/13/2014
RM14-10-000

NERC submits supplemental information to its April 2, 2014 petition for approval of proposed Reliability Standard BAL-001-2 (Real Power Balancing Control Performance).

5/9/2014
RM13-19-000 and RM14-3-000
​Comments of NERC in Response to Notice of Proposed Rulemaking PRC-025-1 (Generator Relay Loadability) and PRC-023-3 (Transmission Relay Loadab​ility)

NERC submits comments in response to the Notice of Proposed Rulemaking (NOPR) proposing to approve Reliability Standards PRC-025-1 (Generator Relay Loadability) and PRC-023-3 (Transmission Relay Loadab​ility).

4/21/2014
RM14-10-000
​Petition of NERC for Approval of Reliability Standard BAL-001-2 (Real Power Balancing Control Performance)

NERC submits a petition for approval of proposed Reliability Standard BAL-001-2 (Real Power Balancing Control Performance).

4/2/2014
RM13-12-000, RM13-14-000 and RM13-15-000
​NERC TOP/IRO Quarterly Status Report

NERC submits its quarterly report regarding the status of revisions to the Transmission Operations (TOP) and Interconnection Reliability Operations and Coordination (IRO) Reliability Standards.

4/1/2014
RR14-2-000
Revised Bulk Electric System Definition in the NERC Rules of Procedure

NERC submits this filing to update the revised Phase 2 definition of Bulk Electric System, approved in FERC's March 20, 2014 order, in the NERC Rules of Procedure: Appendix 2 Definitions Used in the Rules of Procedure and Appendix 5B Statement of Compliance Registry Criteria.

4/1/2014
EL13-22-000
 
NERC submits this quarterly report on the status of an investigation into PacifiCorp's allegations in a November 16, 2012 complaint against the Western Electricity Coordinating Council and the Los Angeles Department of Water and Power. FERC directed NERC to file quarterly status reports until the investigation is completed, in its March 4, 2013 order on the complaint.
 
4/1/2014
RR09-6-003
NERC Standards Report, Status and Timetable for Processing Regulatory Directives

NERC submits the Standards Report, Status and Timetable for Addressing Regulatory Directives. This annual report summaries the progress made, and plans for addressing the Reliability Standards-related directives issued by applicable governmental authorities. Additionally, NERC submits its periodic review of Reliability Standards FAC-003-3, FAC-008-3, FAC-013-2, and IRO-006-5.

3/31/2014
RM14-1-000
​Comments of NERC in Response to Notice of Proposed Rulemaking EOP-010-1 (Geomagnetic Disturbance Operations)

NERC submits comments in response to the Notice of Proposed Rulemaking (NOPR) proposing to approve Reliability Standard EOP-010-1 (Geomagnetic Disturbance Operations).

3/24/2014
RM13-5-000
Request of NERC for Extension of Time to File Revisions to the Violation Risk Factors Assigned to Reliability Standards CIP-006-5, Requirement R3 and CIP-004-5, Requirement R4

NERC submits a request for a 10-day extension of time to file revisions to the Violation Risk Factors (VRFs) assigned to Reliability Standards CIP-006-5, Requirement R3 and CIP-004-5, Requirement R4.

3/18/2014
RM09-14-000 and RD14-8-000
Petition of NERC for Approval of Interpretation of Regional Reliability Standard TOP-007-WECC-1​​

NERC submits a petition for approval of proposed interpretation of Requirement R1 of regional Reliability Standard TOP-007-WECC-1 and proposed regional Reliability Standard TOP-007-WECC-1a.​

3/12/2014
RD14-6-000
​Doc-Less Motion to Intervene in Docket No. RD14-6-000​​

NERC submits a doc-less motion to intervene in the proceeding regarding direction to develop reliability standards requiring owners and operations of the Bulk-Power System to address risks due to physical security threats and vulnerabilities.​

3/10/2014
RD14-7-000
Petition of NERC for Approval of Proposed Reliability Standard PER-005-2 and Retirement of Reliability Standard PER-005-1​​

NERC submits a petition for approval of proposed Reliability Standard PER-005-2 (Operations Personnel Training) and the retirement of the currently effective Reliability Standard PER-005-1. ​

3/7/2014
RR13-10-001
​​NERC Informational Filing Regarding Executed NERC-WECC Delegation Agreement

NERC submits an informational filing in accordance with the February 12, 2014 Order on Compliance of the FERC.

3/4/2014
RD14-4-000
​Petition of NERC for Approval of Proposed Reliability Standards for Interchange Scheduling and Coordination

NERC submits a petition for approval of five proposed Reliability Standards INT-004-3 (Dynamic Transfers), INT-006-4 (Evaluation of Interchange Transactions), INT-009-2 (Implementation of Interchange), INT-010-2 (Interchange Initiation and Modification for Reliability), and INT-011-1 (Intra-Balancing Authority Transaction Identification).​​​

2/27/2014
RM06-16-000
Fourth Quarter 2013 Compliance Filing of NERC in Response to Paragraph 629 of Order No. 693​

NERC submits the Fourth Quarter 2013 compliance filing in response to Paragraph 629 of Order No. 693. Order No. 693 requires that NERC provide a quarterly informational filing regarding the timeframe to restore power to the auxiliary power systems of U.S. nuclear power plants following a blackout as determined during simulations and drills of system restoration plans. This filing contains the referenced material pertaining to the fourth quarter of 2013.​

2/26/2014
RD14-5-000
​Petition of NERC for Approval of Proposed Reliability Standards MOD-032-1 and MOD-033-1​​

NERC submits a petition for approval of proposed Reliability Standards MOD-032-1 (Data for Power System Modeling and Analysis) and MOD-033-1 (Steady-State and Dynamic System Model Validation).​

2/25/2014
RM14-8-000
​Petition of NERC for Approval of Proposed Reliability Standard PRC-005-3 (Protection System Maintenance)​

NERC submits a petition for approval of proposed Reliability Standard PRC-005-3 (Protection System Maintenance). NERC also submits one new definition (Automatic Reclosing); five revised definitions (Unsolved Maintenance Issue, Segment, Component Type, Component, and Countable Event); the implementation plan for PRC-005-3; the violation risk factors (VRFs); and the revised violation severity levels (VSLs).​​​

2/14/2014
FA11-21-000
​Compliance Filling in Response to January 16 Order

NERC submits an unaudited report of NERC’s budget-to-actual variance information for the fourth quarter of 2013. This compliance filing is in accordance with the January 16, 2013 Order, which approved a Settlement Agreement between the FERC Office of Enforcement and NERC, related to findings and recommendations arising out of its 2012 performance audit of NERC.

2/11/2014
RM14-7-000
​Petition of NERC for Approval of Reliability Standard MOD-001-2 and Retirement of Reliability Standards MOD-001-1a, MOD-004-1, MOD-008-1, MOD-028-2, MOD-029-1a, and MOD-030-2​

NERC submits a petition for approval of proposed Reliability Standard MOD-001-2. NERC also requests approval of (1) the associated implementation plan; (2) the associated violation risk factors (VRFs) and violation severity levels (VSLs); and (3) the proposed retirement of Reliability Standards MOD-001-1a, MOD-004-1, MOD-008-1, MOD-028-2, MOD-029-1a, and MOD-030-2.​

2/10/2014
RD14-2-000
Reply Comments of NERC on BES Phase 2 Proceeding​

NERC submits reply comments in response to comments submitted by the Electricity Consumers Resource Council, American Forest & Paper Association, Council of Industrial Boiler Owners and American Fuel & Petrochemical Manufacturers (collectively, ELCON), First Wind Holdings, LLC Wind Holdings, LLC (First Wind), and the American Wind Energy Association (AWEA).
2/3/2014
RR06-1-000 and RR09-7-000
Analysis of NERC Standards Process Results, Fourth Quarter 2013​

NERC submits its fourth quarter 2013 ballot results​ in response to the FERC January 18, 2007 Order requiring NERC to closely monitor and report the voting results for NERC Reliability Standards each quarter for three years.

1/29/2014
EL13-52-001, RR13-10-001, RR13-12-001
​NERC Answer to EEI Protest and Comments

NERC submits a motion for leave to answer and answer to the protest and comments of the Edison Electric Institute (EEI).

1/24/2014
EL13-22-000
Status Report Informational Filing in Response to FERC's March 4, 2013 Order

NERC submits this quarterly report on the status of an investigation into PacifiCorp's allegations in a November 16, 2012 complaint against the Western Electricity Coordinating Council and the Los Angeles Department of Water and Power. FERC directed NERC to file quarterly status reports until the investigation is completed, in its March 4, 2013 order on the complaint.​

1/2/2014