NERC Filings to FERC Archive
 
  
Title/Summary
  
RM13-11-000
​Informational Filing of NERC Regarding Frequency Response Annual Analysis

NERC submits its Annual Analysis of Frequency Response report for the administration and support of proposed Reliability Standard BAL-003-1 (Frequency Response and Frequency Bias Setting).

12/30/2013
RR13-10-001
 
NERC submits a compliance filing to restore and add text to Section 1 of Exhibit E of the NERC-WECC Delegation Agreement, in response to Paragraphs 2 and 50 of FERC's December 6, 2013 order. NERC also responds to Paragraphs 41 and 52 of the order.
 
12/20/2013
RD14-9-00012/20/2013
RM13-12-000, RM13-14-000, RM13-15-000
​NERC Motion to Defer Action​​

NERC submits a motion to defer action on NERC's request to approve revisions to the Transmission (TOP) and Interconnection Reliability Operations and Coordination (IRO) Reliability Standards until January 31, 2015.​

12/20/2013
RR14-1-000
​Petition for Approval of Proposed Revisions to the Southwest Power Pool Regional Entity Standards Development Process Manual​

NERC submits proposed revisions to the Southwest Power Pool Regional Entity Standards Development Process Manual, which is contained in Exhibit C to the amended and restated Delegation Agreement between NERC and SPP.

12/20/2013
RM14-3-000
​Supplemental  Informational Filing (PRC-023-3) to the Petition of NERC for Approval of Proposed Reliability Standard PRC-025-1 (Generator Relay Loadability)​

NERC submits Reliability Standard PRC-023-3 as a Supplement to the Petition of NERC for Approval of Proposed Reliability Standard PRC-025-1 (Generator Relay Loadability).​

12/17/2013
RD14-2-000
​Petition of NERC for Approval of Revisions to the Definition of "Bulk Electric System" and Request for Expedited Action​

NERC submits proposed revisions completed in Phase 2 of Project 2010-17 to the definition of the term “Bulk Electric System” in the NERC Glossary of Terms used in Reliability Standards for Commission approval.

12/13/2013
RD13-9-000

NERC submits a Notice of Withdrawal of the Joint Petition for Approval of Proposed Regional Reliability Standard PRC-006-SPP-01 (Underfrequency Load Shedding).
12/11/2013
RR13-9-002
​NERC's 2014 Business Plan and Budget Corrected Appendix 2

NERC submits its corrected version of Appendix 2, "2012 NEL Calculations and Allocations to Load Serving Entities (or Designee) for the 2014 NERC and RE [Regional Entity] Assessments," to NERC's 2014 Business Plan and Budget filing, originally submitted on August 23, 2013.

12/3/2013
RR13-3-001
​Compliance Filing on Revisions to NERC Rules of Procedure Appendix 4D

NERC submits a compliance filing in response to FERC's September 3, 2013 order approving revisions to the NERC Rules of Procedure Appendix 4D -Procedure for Requesting and Receiving Technical Feasibility Exceptions to NERC Critical Infrastructure Protection Standards.

12/2/2013
RM06-16-000
​Third Quarter 2013 Compliance Filing of NERC in Response to Paragraph 629 of Order No. 693​

NERC submits the Third Quarter 2013 compliance filing in response to Paragraph 629 of Order No. 693. Order No. 693 requires that NERC provide a quarterly informational filing regarding the timeframe to restore power to the auxiliary power systems of U.S. nuclear power plants following a blackout as determined during simulations and drills of system restoration plans. This filing contains the referenced material pertaining to the third quarter of 2013.​

11/26/2013
RM13-16-000
​NERC Comments in Response to Notice of Proposed Rulemaking for Generator Verification Reliability Standards​​

NERC submits comments in response to the Notice of Proposed Rulemaking (NOPR) proposing to approve the following Reliability Standards: MOD-025-2 (Verification and Data Reporting of Generator Real and Reactive Power Capability and Synchronous Condenser Reactive Power Capability), MOD-026-1 (Verification of Models and Data for Generator Excitation Control System or Plant Volt/Var Control Functions), MOD-027-1 (Verification of Models and Data for Turbine/Governor and Load Control or Active Power/Frequency Control Functions), PRC-019-1 (Coordination of Generating Unit or Plant Capabilities, Voltage Regulating Controls, and Protection), and PRC-024-1 (Generator Frequency and Voltage Protective Relay Settings).

11/25/2013
RR13-9-001
 
NERC submits a compliance filing in response to Paragraph 23 of the November 1, 2013 2014 Business Plan and Budget Order of NERC and the Regional Entities. Paragraph 23 cited to a $3.8 million amount referred to in NERC’s Business Plan and Budget as “restricted” working capital to offset future liabilities regarding lease agreements, and directed NERC to submit a compliance filing indicating how NERC will allocate the $3.8 million consistent with NERC’s Working Capital and Operating Reserve Policy.
 
11/22/2013
FA11-21-000
​Compliance Filling in Response to January 16 Order

NERC submits an unaudited report of NERC’s budget-to-actual variance information for the third quarter of 2013. This compliance filing is in accordance with the January 16, 2013 Order, which approved a Settlement Agreement between the FERC Office of Enforcement and NERC, related to findings and recommendations arising out of its 2012 performance audit of NERC.

11/14/2013
RM14-1-000
​Petition of NERC for Approval of Proposed Reliability Standard EOP-010-1 (Geomagnetic Disturbance Operations)​​

NERC submits a petition for approval of proposed Reliability Standard EOP-010-1 (Geomagnetic Disturbance Operations). ​

11/14/2013
RM05-17-000, RM05-25-000, RM06-16-000

NERC submits its Reliability Standards Development Plan: 2014-2016 (2014 Development Plan) in accordance with Section 210 of the NERC Rules of Procedure.​

11/8/2013
RR06-1-000 and RR09-7-000
​Analysis of NERC Standards Process Results, Third Quarter 2013​ 

NERC submits its third quarter 2013 ballot results​ in response to the FERC January 18, 2007 Order requiring NERC to closely monitor and report the voting results for NERC Reliability Standards each quarter for three years.
10/30/2013
RM13-7-000
Errata to Petition for Approval of Proposed Reliability Standard PRC-005-2 (Protection System Maintenance)​

NERC submits an Errata​ to Petition of NERC for approval of proposed Reliability Standard PRC-005-2 (Protection System Maintenance)​.

10/30/2013
AD13-8-000

NERC submits a doc-less motion to intervene in the proceeding in regards to certain requirements of NERC's proposed Reliability Standard BAL-003-1 (Frequency Response and Frequency Bias Setting).
10/18/2013
RM13-11-000
NERC Reply Comments in Response to Notice of Proposed Rulemaking to Approve BAL-003-1​​

NERC submits reply comments in response to the Notice of Proposed Rulemaking (NOPR) proposing to approve Reliability Standard BAL-003-1 (Frequency Response and Frequency Bias Setting).
​​
10/15/2013
RM13-5-000
Informational Filing Regarding CIP 5 Reliability Standard Implementation Study​​

NERC submits an informational filing regarding the Critical Infrastructure Protection Reliability Standards (CIP Version 5) Implementation Study.​​

10/11/2013
RR13-12-000
Doc-less Motion to Intervene in Docket No. RR13-12-000

NERC submits a doc-less motion to intervene in the proceeding regarding the WECC formation of Peak Reliability.

10/4/2013
RM13-5-000
​Errata to Petition for Approval of CIP Version 5​​

On September 30, 2013, NERC submitted an errata to the proposed defined terms and violation severity levels associated with version 5 of the Critical Infrastructure Protection Reliability Standards (CIP Version 5) pending before the Commission. NERC submits a replacement, Attachment 2 that contains corrected clean and redline version of proposed Reliability Standard CIP-002-5.1.

10/1/2013
EL13-22-000
Status Report Informational Filing in Response to FERC's March 4, 2013 Order

NERC submits this quarterly report on the status of an investigation into PacifiCorp's allegations in a November 16, 2012 complaint against the Western Electricity Coordinating Council and the Los Angeles Department of Water and Power. FERC directed NERC to file quarterly status reports until the investigation is completed, in its March 4, 2013 order on the complaint.​

10/1/2013
RR10-1-001
2013 Annual Report of NERC on Wide-Area Analysis of Technical Feasibility Exceptions

NERC submits the 2013 Annual Report on Wide-Area Analysis of Technical Feasibility Exceptions (TFEs) in compliance with Paragraphs 220 and 221 of FERC Order No. 706, FERC’s January 21, 2010 Order Approving TFE Procedures and Ordering Compliance Filing, and Appendix 4D of the NERC Rules of Procedure.

9/30/2013
RM13-5-000
​Errata to Petition for Approval of CIP Version 5​

NERC submits an Errata to the Petition of NERC for Approval of Critical Infrastructure Protection Reliability Standards (CIP Version 5).​

9/30/2013
RM13-19-000
​Petition of NERC for Approval of Proposed Reliability Standard PRC-025-1​​

NERC submits proposed Reliability Standard PRC-025-1 (Generator Relay Loadability) for approval. ​

9/30/2013
RM13-11-000
​NERC Comments on Notice of Proposed Rulemaking on Frequency Response​

NERC submits comments in response to the Notice of Proposed Rulemaking (NOPR) regarding proposed Reliability Standard BAL-003-1 (Frequency Response and Frequency Bias Setting).

9/27/2013
RM13-7-000
​Comments of NERC in Response to Notice of Proposed Rulemaking on PRC-005-2 (Protection System Maintenance)​​

NERC submits comments on the Notice of Proposed Rulemaking (NOPR) regarding proposed Reliability Standard PRC-005-2 (Protection System Maintenance).​​

9/23/2013
RM13-13-000
​Joint Comments of NERC and WECC in Response to Notice of Proposed Rulemaking for BAL-002-WECC-2 (Contingency Reserve)​​

NERC and WECC submit comments in response to the Notice of Proposed Rulemaking (NOPR) proposing to approve regional Reliability Standard BAL-002-WECC-2 (Contingency Reserve).​​

9/23/2013
RC13-4-000 and RC13-4-001
Motion for Leave to Answer and Answer regarding SLECA

NERC submits a motion for leave to answer and answer on the South Louisiana Electric Cooperative Association registration appeal rehearing.​

9/23/2013
RD13-12-0009/18/2013
RD11-13-000
Informational Filing of NERC Regarding Definition of Protection System

NERC submits an informational filing regarding the implementation of the modification to the definition of "Protection System" in the NERC Glossary of Terms.​

9/9/2013
RR13-9-000
NERC Response to EEI's Request for Extension of Time

NERC submits this response to Edison Electric Institute's motion requesting an extension of time to September 20, 2013 to file comments on the proposed 2014 Business Plans and Budgets of NERC and the Regional Entities.​

9/9/2013
RR13-11-000
Request to Change Address in the NERC ROP

NERC requests to update its address in the NERC Rules of Procedure to reference the Atlanta, GA office now that the Princeton, NJ office is closed.​

8/30/2013
RM06-16-000
Second Quarter 2013 Nuclear Compliance Filing of NERC in Response to Paragraph 629 of Order No. 693

NERC submits the Second Quarter 2013 compliance filing in response to Paragraph 629 of Order No. 693. Order No. 693 requires that NERC provide a quarterly informational filing regarding the timeframe to restore power to the auxiliary power systems of U.S. nuclear power plants following a blackout as determined during simulations and drills of system restoration plans. This filing contains the referenced material pertaining to the second quarter of 2013.​

8/28/2013
RM13-8-000
NERC Comments on the P81 Notice of Proposed Rulemaking

NERC submits comments in response to the FERC June 20, 2013 Notice of Proposed Rulemaking (NOPR) proposing to approve NERC's petition to retire 34 Requirements within 19 Reliability Standards and proposing to withdraw 41 outstanding directives.

8/27/2013
RM13-17-000

NERC submits comments on the Notice of Proposed Rulemaking (NOPR) regarding Communication of Operational Information Between Natural Gas Pipelines and Electric Transmission Operators.​
 
8/26/2013
RR13-10-000
 
NERC submits a petition for approval of amendments to the Delegation Agreement with Western Electricity Coordinating Council (WECC) – amendments to Exhibit A (Regional Boundaries of WECC), B (WECC Bylaws), and E (Funding). The principal purpose of these amendments is to revise various sections and exhibits in the Delegation Agreement to implement a decision by WECC to completely separate its compliance monitoring and enforcement function from the Reliability Coordinator and Interchange Authority functions for the Western Interconnection. That proposed separation was the subject of a declaratory order issued by the FERC on June 20, 2013.
8/26/2013
FA11-21-000
Compliance Filling in Response to January 16, 2013 Order​

NERC submits its Board of Trustees compensation study and decision. This compliance filing is in accordance with the January 16, 2013 Order, which approved a Settlement Agreement between the FERC Office of Enforcement and NERC, related to findings and recommendations arising out of its 2012 performance audit of NERC.​

8/23/2013
RR13-9-000
Request for Acceptance of NERC's 2014 Business Plan and Budget Filing and the 2014 Business Plans and Budgets of the Regional Entities

NERC submits its request for acceptance of NERC's 2014 Business Plan and Budget Filing and the 2014 Business Plans and Budgets of the Regional Entities and for the approval of proposed assessments to fund budgets. ​

8/23/2013
RD13-11-000
Joint Petition of NERC and WECC for Approval of BAL-004-WECC-02 and BAL-001-1

Attachment to Filing Exhibit G Pt. 2 

NERC submits a joint petition for approval of proposed regional Reliability Standard BAL-004-WECC-02 and proposed Reliability Standard BAL-001-1.

8/20/2013
RC13-4-001
 
NERC submits a request for rehearing on the South Louisiana Electric Cooperative Association registration appeal.
8/19/2013
FA11-21-000
Compliance Filling in Response to January 16 Order

NERC submits an unaudited report of NERC’s budget-to-actual variance information for the second quarter of 2013. This compliance filing is in accordance with the January 16, 2013 Order, which approved a Settlement Agreement between the FERC Office of Enforcement and NERC, related to findings and recommendations arising out of its 2012 performance audit of NERC.​ 

8/14/2013
RR13-8-000
Petition for Approval of Amendments to the Delegation Agreement with SPP - Amendments to Exhibit B - SPP's Bylaws

NERC submits a Petition for Approval of Amendments to the Delegation Agreement with Southwest Power Pool, Inc. (SPP) – Amendments to Exhibit B - SPP's Bylaws. The proposed SPP bylaw amendments are to Sections 1.0, 3.0, 6.0, and 8.0.

8/9/2013
RR06-1-000 and RR09-7-000
Analysis of NERC Standards Process Results, Second Quarter 2013

NERC submits its second quarter 2013 ballot results​ in response to the FERC January 18, 2007 Order requiring NERC to closely monitor and report the voting results for NERC Reliability Standards each quarter for three years.

7/30/2013
NP13-41-000
Spreadsheet Notice of Penalty Filing - Supplemental Information - NP13-41

NERC submits a supplemental filing to the June 2013 Spreadsheet Notice of Penalty.  Docket No. NP13-41-000

7/24/2013
RR13-7-000
Petition for Approval of Amendments to the Delegation Agreement with Texas RE - Amendments to Exhibit D - Texas RE's CMEP

NERC submits a Petition for Approval of Amendments to the Delegation Agreement with Texas Reliability Entity, Inc. (Texas RE) – Amendments to Exhibit D - Texas RE's Compliance Monitoring and Enforcement Program.

7/17/2013
RM12-4-001
Compliance Filing of Reliability Standard FAC-003-2

NERC submits a compliance filing to the transmission Vegetation Management Reliability Standard, pursuant to Order No. 777: (1) to provide a detailed description of NERC's plan to conduct testing to develop empirical data regarding the flashover distances between conductors and vegetation; (2) to modify the Violation Risk Factor (VRF) for Requirement R2; and (3) to confirm NERC has posted guidance materials for NERC Reliability Standard FAC-003-2.​

7/12/2013
RM12-16-000
Reply Comments of NERC in Response to GOTO NOPR Comments

NERC submits reply comments in response to the comments submitted on June 24, 2013 on the FERC April 18, 2013, Notice of Proposed Rulemaking (NOPR) regarding modifications to four existing Reliability Standards.​

7/9/2013
RM13-6-000
 
NERC submits comments in response to the May 16, 2013 Notice of Proposed Rulemaking (NOPR) proposing to remand the proposed interpretation of Reliability Standard BAL-002-1.
 
7/8/2013
EL13-22-000
Status Report Informational Filing in Response to FERC's March 4, 2013 Order

NERC submits this quarterly report on the status of an investigation into PacifiCorp's allegations in a November 16, 2012 complaint against the Western Electricity Coordinating Council and the Los Angeles Department of Water and Power. FERC directed NERC to file quarterly status reports until the investigation is completed, in its March 4, 2013 order on the complaint.

7/1/2013
RM12-1-000 and RM13-9-000
Comments of NERC in Response to Supplemental Notice of Proposed Rulemaking TPL-001-4

NERC submits comments in response to the FERC May 16, 2013 Supplemental Notice of Proposed Rulemaking (NOPR) regarding Reliability Standard TPL-001-4. The proposed modifications improve reliability and resolve issues and concerns with previous standards. The supplemental NOPR proposes to approve Reliability Standard TPL-001-4.​

6/24/2013
RM12-16-000
Comments of NERC on Generator Requirements at the Transmission Interface NOPR

NERC submits comments in response to the FERC April 18, 2013 Notice of Proposed Rulemaking (NOPR) regarding modifications to four existing Reliability Standards, FAC-001-1 (Facility Connection Requirements), FAC-003-3 (Transmission Vegetation Management), PRC-004-2.1a (Analysis and Mitigation of Transmission and Generation Protection System Misoperations), and PRC-005-1.1b (Transmission and Generation Protection System Maintenance and Testing). ​

6/24/2013
RM13-5-000
Comments of NERC on the Notice of Proposed Rulemaking for Version 5 Critical Infrastructure Protection Reliability Standards

NERC submits comments on the Notice of Proposed Rulemaking (NOPR) regarding NERC's proposed Version 5 Critical Infrastructure Protection (CIP Version5) Reliability Standards issued by FERC on April 18, 2013.​

6/24/2013
NP13-34-000

NERC submits an errata filing to the May 30, 2013 Notice of Penalty regarding an Unidentified Registered Entity.
 
6/7/2013
RM12-6-000 and RM12-7-000
Reply Comments of NERC

NERC submits reply comments to extend the effective date of the Definition of BES from July 1, 2013 to July 1, 2014.​

6/4/2013
RM12-6-000 and RM12-7-000
Informational Filing on Bulk Electric System Definition Exceptions

NERC submits this informational filing regarding how a list of facilities and Elements for which Exceptions have been granted and those for which an entity has made a self-determined exclusion, will be maintained. The filing also identifies how information will be made available to the Commission, Regional Entities, and to other interested persons.​

6/3/2013
RM06-16-000
First Quarter 2013 Compliance Filing on Paragraph 629 of Order 693 - Nuclear Data

NERC submits the First Quarter 2013 Compliance Filing of the North American Electric Reliability Corporation in Response to Paragraph 629 of Order No. 693. Order No. 693 requires that NERC provide a quarterly informational filing regarding the timeframe to restore power to the auxiliary power systems of U.S. nuclear power plants following a blackout as determined during simulations and drills of system restoration plans. This filing contains the referenced material pertaining to the first quarter of 2013.​

5/31/2013
RR13-6-000
NERC 2012 True-Up - Report of Comparisons of Budgeted to Actual Costs for 2012 for NERC and the Regional Entities

NERC submits a filing to provide comparisons of actual to budgeted costs for the year 2012 for NERC and the eight Regional Entities.​

5/30/2013
RM13-16-000
Petition of NERC for Approval of Five Proposed Reliability Standards MOD-025-2, MOD-026-1, MOD-027-1, PRC-019-1, and PRC-024-1

Attachments to the Filing

NERC submits a petition for five new Generator Verification Standards and their accompanying VRFs and VSLs.​

5/30/2013
FA11-21-000
Compliance Filling in Response to January 16, 2013 Order​​

NERC submits its Employee Rewards and Recognition Policy. This compliance filing is in accordance with the January 16, 2013 Order, which approved a Settlement Agreement between the FERC Office of Enforcement and NERC, related to findings and recommendations arising out of its 2012 performance audit of NERC.

5/28/2013
RM12-6-000 and RM12-7-000
Motion of the NERC for an Extension of Time of the Effective Date of the Definition of Bulk Electric System and Request for Shortened Comment Period and Expedited Action

This motion requests that the Commission: (1) grant an extension of time of the effective date of the definition of “Bulk Electric System” from July 1, 2013 to July 1, 2014, in the interest of regulatory certainty; (2) shorten the period to respond to this motion to May 30, 2013; and (3) issue an order granting the extension prior to June 30, 2013.

5/23/2013
FA11-21-000 and FA11-21-001
 
NERC submits an unaudited report of NERC’s budget-to-actual variance information for the first quarter of 2013. This compliance filing is in accordance with the January 16, 2013 Order, which approved a Settlement Agreement between the FERC Office of Enforcement and NERC, related to findings and recommendations arising out of its 2012 performance audit of NERC.​ 
5/15/2013
RM12-19-000
Comments in Response to NOPR Proposing to Approve MOD-028-2

NERC submits comments in response to FERC's March 21, 2013 Notice of Proposed Rulemaking proposing to approve MOD-028-2.

5/13/2013
RR06-1-000
Informational Filing on the Definition of "Adequate Level of Reliability"

NERC submits an informational filing on the definition of "Adequate Level of Reliability" and a supporting technical report. 

5/10/2013
RD13-10-000
Petition for Approval of the NERC Glossary Terms "Bulk-Power System," "Reliable Operation," and "Reliability Standard"

NERC submits a petition for approval of the NERC Glossary Terms "Bulk-Power System," "Reliable Operation," and "Reliability Standard." ​

5/10/2013
RC13-4-000
Motion for Leave to Answer and Answer on the South Louisiana Electric Cooperative Association Appeal Answer
 
NERC submits a motion for leave to answer and answer on the South Louisiana Electric Cooperative Association registration appeal answer.
 
4/30/2013
RD13-9-000
Joint Petition of NERC and SPP RE for Approval of Proposed Regional Reliability Standard PRC-006-SPP-01 (Automatic Underfrequency Load Shedding)

NERC and SPP RE jointly submit a petition for approval of PRC-006-SPP-01 (Automatic Underfrequency Load Shedding).​

4/26/2013
RR13-5-000
Petition for Approval of Amendments to Delegation Agreement with MRO - Amendments to the Regional Reliability Standards Process Manual

NERC submits a petition for approval of revisions to the Midwest Reliability Organization (MRO) Regional Reliability Standards Process Manual.​

4/26/2013
RR06-1-000 and RR09-7-000
 
NERC submits an informational report on the analysis of NERC Standards Process Results for the First Quarter 2013 in compliance with an order issued by FERC on January 18, 2007 and a subsequent order on September 16, 2010.
4/25/2013
RD12-5-001
Request for Clarification of NERC on Order Remanding Interpretation to CIP-002-4

NERC asks for clarification on two issues in FERC’s March 21, 2013 Order remanding NERC's proposed interpretation of CIP-002-4, Requirement R2.

4/22/2013
RM13-14-000
 
NERC submits a petition for approval of three Transmission Operation Standards (TOP-001-2—Transmission Operations, TOP-002-3—Operations Planning, TOP-003-2—Operational Reliability Data) one Protection and Control Reliability Standard (PRC-001-2—System Protection Coordination), and retirement of nine existing Reliability Standards and one Requirement from an existing Reliability Standard.
4/16/2013
RM13-15-000
 
NERC submits a petition for approval of proposed Reliability Standards IRO-001-3, IRO-002-3, IRO-005-4, and IRO-014-2.
4/16/2013
EL13-52-000
Motion to Intervene and Comments - EL13-52

NERC submits a Motion to Intervene and Comments on WECC's Petition for Declaratory Order.​

4/15/2013
RM13-13-000
Joint Petition of NERC and WECC for Approval of BAL-002-WECC-2

NERC submits a Joint Petition of NERC and Western Electricity Coordinating Council for approval of WECC Regional Reliability Standard BAL-002-WECC-2 (Contingency Reserve).

Exhibit G

4/12/2013
RD13-8-000

NERC submits a petition for approval of an interpretation to Reliability Standards TPL-003-0a and TPL-004-0.
4/12/2013
RR13-4-000
Petition for Approval of Amendments to the Delegation Agreement with Texas RE - Bylaws 

NERC submits a petition for approval of amendments to the Delegation Agreement with Texas Reliability Entity, Inc. (Texas RE) – Amendments to Texas RE’s Bylaws.​

4/9/2013
RR13-3-000
Petition for Approval of Revisions to NERC Rules of Procedure Appendix 4D and Appendix 2

NERC submits a Petition for Approval of Revisions to Appendix 4D and Appendix 2 of the NERC Rules of Procedure.​

4/8/2013
RM13-12-000
Petition for Approval of Proposed Reliability Standard TOP-006-3 (Monitoring System Conditions) (Rapid Revision)

NERC submits a petition for approval of proposed Reliability Standard TOP-006-3 (Monitoring System Conditions). This standard revision was made through NERC’s Rapid Revision process to clarify that Transmission Operators are responsible for monitoring and reporting available transmission resources; that Balancing Authorities are responsible for monitoring and reporting available generation resources; and to confirm that Reliability Coordinators, Transmission Operators, and Balancing Authorities are required to supply their operating personnel with appropriate technical information concerning protective relays located within their respective areas.

4/5/2013
RR13-2-000
Reply Comments of NERC in Response to Comment on NERC Revisions to the Standard Processes Manual 

NERC submits comments in response to the comments of the City of Santa Clara made on NERC's Filing for Approval of Revisions to the NERC Standard Processes Manual.​

4/5/2013
RM12-6-000 and RM12-7-000
Compliance Filing in Response to Order No. 773 - Approving Revisions to the ERO Definition of BES and Rules of Procedure

NERC submits a filing in response to Order No. 773 Approving Revisions to the Electric Reliability Organization Definition of Bulk Electric System and Rules of Procedure. By this filing, NERC submits a schedule outlining how and when it will modify Exclusion E3 of the Bulk-Electric System definition to remove the 100 kV minimum operating voltage in the local network definition.

4/4/2013
RR09-6-003
NERC 2013 Informational Report on the Status and Timetable for Addressing Regulatory Directives

NERC submits an informational report summarizing the progress made and plans for addressing the standards-related directives received from FERC.​

4/1/2013
RM13-11-000
Petition for Approval of Proposed Reliability Standard BAL-003-1 (Frequency Response and Frequency Bias Setting)

NERC submits a petition for approval of a proposed Reliability Standard BAL-003-1 (Frequency Response and Frequency Bias Setting). The proposed Reliability Standard ensures that each of the Interconnections have sufficient Frequency Response to guard against underfrequency load shedding (UFLS) due to an event in that Interconnection.

Exhibit K-Part 1

Exhibit K-Part 2

Exhibit L

3/29/2013
RC13-4-000
 
NERC submits a motion to intervene, protest and comment on the South Louisiana Electric Cooperative Association registration appeal.
3/18/2013
RC11-6-004
Compliance Filing and Report on CEI and Proposed Enhancements to the FFT Program

NERC submits a compliance filing and report on the Compliance Enforcement Initiative and proposed enhancements to the Find, Fix, Track and Report. The compliance filing was submitted in response to FERC's March 15, 2012 Order. 

3/15/2013
RM12-9-001
Compliance Filing in Response to Order No. 772 on Regional Reliability Standard PRC-006-SERC-01

NERC submits a compliance filing in response to Order No. 772 approving Regional Reliability Standard PRC-006-SERC-01. By this filing, NERC submits a modification to the rationale statement and VRF for Requirement R6.

3/11/2013
FA11-21-000
Response of NERC to EEI Motion to Intervene, Motion to Consolidate, and Comments

NERC submits a response to Edison Electric Institute's February 22, 2012 Motion to Intervene, Motion to Consolidate, and Comments on NERC's Compliance Filing in Response to Paragraph 30 of November 2, 2012 Commission Order, filed February 1, 2012, in which NERC submitted the “NERC Written Criteria for Determining Whether an Activity is Eligible to Be Funded Under Section 215 of the Federal Power Act.”

3/6/2013
RM12-1-000 and RM13-9-000
Petition for Approval of Modified Transmission Planning Reliability Standards in the Case of System Performance Following Loss of a Single Bulk Electric System Element

NERC submits a petition for approval of modified Transmission Planning (TPL) Reliability Standards that include changes to the Requirements and processes for planned load shed in the event of a single Contingency that are identified in a revised footnote. NERC is also requesting Commission approval of revisions to the Standards that correspond to the Footnote revisions included in this petition and other related documents.​

2/28/2013
RM13-8-000
Petition of NERC for Approval of Retirement of Requirements in Reliability Standards

NERC submits a petition requesting approval of the retirement of 34 Requirements within 19 currently effective Reliability Standards that are redundant or otherwise unnecessary, and for which violations of these Requirements (currently included in Reliability Standards) pose a lesser risk to the reliability of the Bulk-Power System. ​

2/28/2013
RR13-2-000
Petition of NERC for Approval of Revisions to the NERC Standard Processes Manual

NERC files a petition for approval of revisions to the NERC Standard Processes Manual (SPM). The SPM contains all of the procedures governing the Reliability Standards development process. The proposed revisions to the SPM enhance the Reliability Standards development process by providing additional clarity and streamlining the drafting, commenting and balloting processes.

2/28/2013
RM06-16-000
Fourth Quarter 2012 Nuclear Compliance Filing of NERC in Response to Paragraph 629 of Order No. 693

NERC submits the Fourth Quarter 2012 compliance filing in response to Paragraph 629 of Order No. 693. Order No. 693 requires that NERC provide a quarterly informational filing regarding the timeframe to restore power to the auxiliary power systems of U.S. nuclear power plants following a blackout as determined during simulations and drills of system restoration plans. This filing contains the referenced material pertaining to the fourth quarter of 2012.  

2/26/2013
RM13-7-000
Petition for Approval of Proposed Reliability Standard PRC-005-2 (Protection System Maintenance)

NERC submits proposed Reliability Standard PRC-005-2 which consolidates Reliability Standards PRC-005-1.1b, PRC-008-0, PRC-011-0, and PRC-017-0 into a single proposed Reliability Standard. Proposed PRC-005-2 also addresses the directives related to those Reliability Standards issued by the Commission in Order No. 693.

2/26/2013
RD13-6-000
Petition for Approval of Proposed Reliability Standard VAR-001-3 (Voltage and Reactive Control) (WECC Regional Variance)

NERC submits a petition for approval of proposed Reliability Standard VAR-001-3 (Voltage and Reactive Control) developed by NERC and WECC that adds a regional variance developed by WECC as Section E of proposed VAR-001-3.

2/25/2013
RM12-6-000 and RM12-7-000
 
NERC submits a request for leave to respond and submits a response to the response of Exelon Corporation to the Request for Clarification of NERC of the Commission’s December 20, 2012 Order No. 773 on Revisions to the Electric Reliability Organization Definition of Bulk Electric System (BES) and Rules of Procedure.
2/21/2013
RR12-8-001
Compliance Filing in Response to December 20, 2012 Order

NERC submits a compliance filing in response to FERC's December 20, 2012 Order. The December 20, 2012 Order generally approved revisions to the NERC Rules of Procedure filed with FERC on May 7, 2012, but rejected certain proposed revisions which this filing addresses.

2/19/2013
RM08-13-000 and RM08-13-001
 
NERC submits a compliance filing in response to Order Nos. 733 and 759, directing NERC to file with the Commission a test for Planning Coordinators to identify sub-200 kV critical facilities, and the results of that test on a representative sample of utilities in three Interconnections.
2/19/2013
RR12-8-000
Informational Filing in Response to December 20, 2012 Order

NERC submits an informational filing in response to Paragraph 31 of FERC's December 20, 2012 Order. The December 20, 2012 Order generally approved revisions to the NERC Rules of Procedure (ROP) filed with FERC on May 7, 2012, but rejected certain proposed revisions.  Paragraph 31 directs NERC to explain the assessment of Penalties with respect to Regional Entities and to address the issue identified in ROP Sections 402.6 and 404.1.

2/19/2013
RD13-5-000
 
NERC submits a follow-up filing to its December 1, 2010 compliance filing (VSL Filing 2) providing further changes to proposed VRFs and VSLs for NERC Reliability Standards.  Docket Nos. RR08-4-000, RR08-4-001, RR08-4-002, RM08-19-002, RM09-9-000, RM09-14-000, RM09-19-000, RM09-25-000, RM10-10-000, RM10-15-000, RM10-16-000, RD11-2-000, RD11-4-000, and RM11-14-000.
 
2/15/2013
RM13-6-000
Petition for Approval of Interpretation to BAL-002-1 (Disturbance Control Performance)

NERC submits a petition for approval of proposed interpretation BAL-002-1a, which includes an interpretation to Requirements R4 and R5 of BAL-002-1.​

2/12/2013
RM12-4-000
Reply Comments of NERC in Response to Comments Submitted on NOPR on Transmission Vegetation Management Standard FAC-003-2

NERC submits reply comments to comments submitted on the Notice of Proposed Rulemaking (NOPR) on Revisions to Reliability Standards for Transmission Vegetation Management.

2/5/2013
FA11-21-000
 
NERC submits a compliance filing in response to Paragraph 30 of the November 2, 2012 Commission Order in Docket Nos. FA11-21-000 and RR12-13-000. This filing provides NERC's written criteria for determining whether a reliability activity is eligible to be funded under Federal Power Act Section 215.  
 
2/1/2013
RR06-1-000 and RR09-7-000
 
NERC submits an informational report on the analysis of NERC Standards Process Results for the Fourth Quarter 2012 in compliance with an order issued by FERC on January 18, 2007 and a subsequent order on September 16, 2010.
1/31/2013
RM13-5-000
Petition of NERC for Approval of CIP Version 5 Reliability Standards

NERC submits a petition for approval of Critical Infrastructure Protection Reliability Standards Version 5

Exhibit F - Part 1 of 2

Exhibit F - Part 2 of 2

Exhibits G-H

1/31/2013
RM06-16-010 and RM06-16-011
Quarterly Report of NERC on Status of Development of BAL-003 (Frequency Response and Bias) 4Q2012

NERC submits its 4th Quarter 2012 Quarterly Report of NERC on Status of Development of BAL-003 (Frequency Response and Bias).​

1/23/2013
RD13-2-000
Reply Comments of NERC on Petition for Approval of VAR-002-2b

NERC submits Reply Comments in response to comments submitted on NERC’s Petition for Approval of Proposed Reliability Standard VAR-002-2b concerning the Violation Severity Level for Requirement R2.

1/23/2013
RM12-6-001 and RM12-7-001
Request of NERC for Clarification on Order No. 773 - Revision to ERO Definition of Bulk Electric System and Rules of Procedure

NERC submits a request for clarification on Revisions to the Electric Reliability Organization Definition of Bulk Electric System and Rules of Procedure in Order No. 773 issued by FERC on December 20, 2012.​

1/22/2013
RD13-1-000 and EL13-11-000
Comments in Support of WECC's Motion for Designation of Certain Commission Staff as Non-Decisional

NERC submits comments in support of WECC’s January 14, 2013 Motion for Designation of Certain Commission Staff as Non-Decisional.​

1/17/2013
RM12-22-000
Reply Comments of NERC in Response to Notice of Proposed Rulemaking on Reliability Standards for Geomagnetic Disturbances

NERC submits comments in response to comments submitted in response to the Notice of Proposed Rulemaking on Reliability Standards for Geomagnetic Disturbances (GMD).​

1/10/2013
AD12-12-000
Comments of NERC in Response to Request for Comments and Notice of Technical Conference on Coordination Between Natural Gas and Electricity Markets

NERC submits comments in response to FERC’s Notice of Request for Comments and Technical Conference on the Coordination between Natural Gas and Electricity Markets.​

1/7/2013
RD13-3-000
Errata to Petition for Approval of Proposed Reliability Standard EOP-004-2 (Event Reporting)

NERC submits an errata to its December 31, 2012 petition making a minor correction to Exhibit B - Reliability Standard EOP-004-2.

1/4/2013
RM05-17-000, RM05-25-000, RM06-16-000
 
NERC submits the Reliability Standards Development Plan: 2013-2015 (RSDP). The RSDP will: 1. Serve as a management tool to guide and coordinate the development of Reliability Standards and provide benchmarks for assessing progress; 2. Serve as a communications tool for coordinating standards development work with applicable governmental agencies in the United States and Canada and for engaging stakeholders in Reliability Standards development activities; and 3. Provide a basis for developing annual plans and budgets for the NERC Reliability Standards program. Docket Nos. RM05-17-000, RM05-25-000 and RM06-16-000
 
12/31/2012
RD13-3-000
Petition for Approval of Proposed Reliability Standard EOP-004-2 (Event Reporting)

NERC submits a petition for approval of standard EOP-004-2 (Event Reporting). The proposed Reliability Standard provides a comprehensive approach to reporting disturbances and events that have the potential to impact the reliability of the Bulk Electric System in accordance with several Commission directives. Docket No. RD13-3-000​

12/31/2012
RR13-1-000
Petition of NERC for Approval of Amendments to Delegation Agreement with ReliabilityFirst Corporation - Amendments to ReliabilityFirst's Bylaws

NERC submits a petition for approval of Amendments to the Delegation Agreement with ReliabilityFirst Corporation – Amendments to ReliabilityFirst’s Bylaws. Docket No. RR13-1-000

12/28/2012
RM12-22-000
Comments of NERC in Response to NOPR Proposing NERC Develop Geomagnetic Disturbance Standards

NERC submits comments in response to the October 18, 2012 Notice of Proposed Rulemaking (NOPR) proposing to direct NERC to file for approval with the Commission Reliability Standards that address the risks posed by geomagnetic disturbances (GMDs) to the reliable operation of the Bulk-Power System, in two stages. Docket No. RM12-22-000

12/26/2012
RM12-4-000
Comments of NERC in Response to NOPR on Transmission Vegetation Management Standard FAC-003-2

NERC submits comments in response to the October 18, 2012 Notice of Proposed Rulemaking proposing to approve Reliability Standard FAC-003-2. Docket No. RM12-4-000​

12/21/2012
RC11-6-000, RC12-6-000, RC12-7-000​
Follow-up Actions in Response to March 15 Order

NERC submits a response to the November 26, 2012 Data Request regarding FERC’s plans to conduct a yearly survey to collect data on the effectiveness and efficiency of the Find, Fix, Track and Report (FFT) program pursuant to the March 15 Order. Docket Nos. RC11-6-000, RC12-6-000 and RC12-7-000​

12/11/2012
RM12-12-000
Reply Comments of NERC in response to NOPR on Regional Reliability Standard PRC-006-NPCC-1

NERC provides reply comments in response to the comments submitted on November 26, 2012, on FERC's September 20, 2012, Notice of Proposed Rulemaking (“NOPR”) regarding the proposed regional Reliability Standard PRC-006-NPCC-1 (Automatic Underfrequency Load Shedding). Docket No. RM12-12-000​

12/11/2012
RC08-5-002 and RC08-5-003
Compliance Filing regarding DOE-PPPO Registration Appeal

NERC submits a compliance filing in response to the Order on Rehearing and Clarification and Compliance Filing regarding the registration appeal for the United States Department of Energy, Portsmouth/Paducah Project Office. Docket Nos. RC08-5-002 and RC08-5-003​

12/7/2012
EL13-11-000 and RD13-1-000
Motion for Leave to Answer and Answer of WECC and NERC as related to Tri-State

Western Electricity Coordinating Council and NERC submit an answer to the November 21, 2012 answer filed in the proceeding related to Tri-State Generation and Transmission Association, Inc. Docket Nos. EL13-11-000 and RD13-1-000​

12/6/2012
RM06-16-000
Third Quarter 2012 Nuclear Compliance Filing of NERC in Response to Paragraph 629 of Order No. 693

NERC submits the Third Quarter 2012 compliance filing in response to Paragraph 629 of Order No. 693. Order No. 693 requires that NERC provide a quarterly informational filing regarding the timeframe to restore power to the auxiliary power systems of U.S. nuclear power plants following a blackout as determined during simulations and drills of system restoration plans. This filing contains the referenced material pertaining to the third quarter of 2012. Docket No. RM06-16-000​

11/29/2012
RM12-12-000
Comments of NERC in Response to NOPR on PRC-006-NPCC-01

NERC submits comments in response to FERC's September 20, 2012 Notice of Proposed Rulemaking regarding the proposed regional Reliability Standard PRC-006-NPCC-1 (Automatic Underfrequency Load Shedding). Docket No. RM12-12-000​

11/26/2012
RD13-2-000
Petition for Approval of Proposed Reliability Standard VAR-002-2b

NERC submits a petition for approval of proposed Reliability Standard VAR-002-2b (Generator Operation for Maintaining Network Voltage Schedules), the associated implementation plan, Violation Risk Factors (VRFs) and Violation Severity Levels (VSLs), and retirement of the currently effective Reliability Standard VAR-002-1.1b. Docket No. RD13-2-000​

11/21/2012
EL13-11-000 and RD13-1-000
Answer of NERC and WECC to the complaint of Tri-State Generation and Transmission Association 
 
NERC and Western Electricity Coordinating Council submit an answer to the complaint of Tri-State Generation and Transmission Association, Inc. Docket Nos. EL13-11-000 and RD13-1-000
 
11/8/2012
RR06-1-000 and RR09-7-000
Informational Report of NERC on Standards Process Results for Third Quarter 2012

NERC submits an informational report on the analysis of NERC Standards Process Results for the Third Quarter 2012 in compliance with an order issued by FERC on January 18, 2007 and a subsequent order on September 16, 2010. Docket Nos. RR06-1-000 and RR09-7-000​

10/31/2012
RM06-16-010 and RM06-16-011​
Quarterly Report of NERC on Status of Development of BAL-003 - Frequency Response and Bias

NERC submits its Third Quarter 2012 report on the status of development of BAL-003 - Frequency Response and Bias in compliance with FERC's May, 4, 2012 Order and Order No. 693. Docket Nos. RM06-16-010 and RM06-16-011​

10/31/2012
RM11-11-000
Quarterly Report of NERC on Status of Development of Version 5 CIP Reliability Standards

NERC submits a Third Quarter 2012 report on the status of development of CIP Version 5 Reliability Standards. Docket No. RM11-11-000​

10/31/2012
RM09-13-000
Notice of Withdrawal of BAL-004-1 - Time Error Correction

NERC submits a Notice of Withdrawal of its March 11, 2009 Petition for Approval of the BAL-004-1 Time Error Correction Reliability Standard.  BAL-004-0 is currently effective and is unaltered by the submission of this Notice. Docket No. RM09-13-000​

10/24/2012
RC11-6-003
NERC Compliance Filing - Compliance Enforcement Initiative

NERC submits this filing in compliance with the September 20, 2012 Order requiring NERC to file training materials.  FERC's March 15 Order accepted NERC's petition requesting approval of its proposal to make informational filings in a Find, Fix, Track and Report (FFT) spreadsheet format in connection with the Compliance Enforcement Initiative (CEI).  These training materials are associated with the FFT initiative. Docket No. RC11-6-003  

10/12/2012
RR10-1-001
2012 Annual Report of NERC on Wide-Area Analysis of Technical Feasibility Exceptions

NERC submits the 2012 Annual Report on Wide-Area Analysis of Technical Feasibility Exceptions (TFE) in compliance with Paragraphs 220 and 221 of FERC Order No. 706, FERC’s January 21, 2010 Order Approving TFE Procedures and Ordering Compliance Filing, and Appendix 4D of the NERC Rules of Procedure. Docket No. RR10-1-001

9/28/2012
RM12-9-000​
Filing of NERC in Support of the SERC Reliability Corporation Response to the Notice of Proposed Rulemaking on Regional Reliability Standard PRC-006-SERC-01

NERC files comments in support of SERC Reliability Corporation's response to the Notice of Proposed Rulemaking issued on July 19, 2012, proposing to approve Regional Reliability Standard PRC-006-SERC-01 - Automatic Underfrequency Load Shedding Requirements. Docket No. RM12-9-000​

9/24/2012
RM12-6-000 and RM12-7-000
Reply Comments to BES Definition NOPR

NERC submits reply comments in response to comments submitted on September 4, 2012 on the June 22, 2012 Notice of Proposed Rulemaking (NOPR) regarding revisions to the ERO Definition of Bulk Electric System and Rules of Procedure.​

9/20/2012
RR12-13-000​
Update to NERC's Request for Acceptance of the 2013 Business Plan and Budgets of NERC and the Regional Entities and for Approval of Proposed Assessments to Fund Budgets

NERC submits an update to NERC’s request for acceptance of the 2013 Business Plans and Budgets of NERC, the eight Regional Entities and the Western Interconnection Regional Advisory Body, and approval of the proposed assessments to fund the 2013 budgets, which was originally filed in this docket on August 24, 2012. Docket No. RR12-13-000

9/10/2012
RR12-13-000

NERC submits a response to the motion of EEI to extend the period for filing comments to September 28, 2012 and to shorten the time to respond to the 2013 Business Plans and Budgets of NERC and the eight Regional Entities. Docket No. RR12-13-000​

9/5/2012
RM12-6-000 and RM12-7-000
Comments in Response to NOPR on Revisions to the ERO Definition of Bulk Electric System and Rules of Procedure

NERC submits comments in response to the Notice of Proposed Rulemaking (NOPR) proposing to approve NERC's modifications to the definition of the "Bulk Electric System." Docket Nos. RM12-6-000 and RM12-7-000​

9/4/2012
RM06-16-000
Second Quarter 2012 Nuclear Compliance Filing of NERC in Response to Paragraph 629 of Order No. 693

NERC submits the Second Quarter 2012 compliance filing in response to Paragraph 629 of Order No. 693. Order No. 693 requires that NERC provide a quarterly informational filing regarding the timeframe to restore power to the auxiliary power systems of U.S. nuclear power plants following a blackout as determined during simulations and drills of system restoration plans. This filing contains the referenced material pertaining to the second quarter of 2012. Docket No. RM06-16-000​

8/31/2012
RM12-19-000
Petition for Approval of MOD-028-2 (Area Interchange Methodology)

NERC submits a petition for approval of proposed Reliability Standard MOD-028-2 (Area Interchange Methodology). Docket No. RM12-19-000

8/24/2012
RR12-13-000
Request for acceptance of NERC's 2013 Business Plan and Budget Filing and the 2013 Business Plans and Budgets of the Regional Entities

NERC submits its request for acceptance of NERC's 2013 Business Plan and Budget Filing and the 2013 Business Plans and Budgets of the Regional Entities and for the approval of proposed assessments to fund budgets. Docket No. RR12-13-000

8/24/2012
RD12-5-000
Errata to Petition for Approval of Interpretation to Reliability Standard CIP-002-4 (Critical Cyber Asset Identification)

NERC submits an errata to correct the record regarding the petition for approval of an interpretation to CIP-002-4. Docket No. RD12-5-000​

8/20/2012
RM11-20-002
Compliance Filing In Response to Order No. 763 on Automatic Underfrequency Load Shedding Reliability Standards

NERC submits a compliance filing in response to Order No. 763 on Automatic Underfrequency Load Shedding and Load Shedding Plans Reliability Standards (PRC-006-1 and EOP-003-2). Docket No. RM11-20-002​

8/9/2012
RM12-12-000​
Errata to Petition for Approval of Regional Reliability Standard PRC-006-NPCC-1

NERC submits an errata to the petition for approval of Regional Reliability Standard PRC-006-NPCC-1 in which it includes the implementation plan in Exhibit A. Docket No. RM12-12-000

8/3/2012
RD12-5-000
Petition for Approval of an Interpretation to Reliability Standard CIP-002-4 (Critical Cyber Asset Identification)

NERC submits a petition for approval of an interpretation of Reliability Standard CIP-002-4 (Critical Cyber Asset Identification), Requirement R3. Docket No. RD12-5-000

8/1/2012
RD12-6-000
Petition of NERC for Approval of Interpretation to Reliability Standard CIP-004-4 (Personnel and Training)

NERC submits a petition for approval of an interpretation of Reliability Standard CIP-004-4 (Personnel and Training), Requirements R2, R3, and R4, CIP-004-4a. Docket No. RD12-6-000​

8/1/2012
RR06-1-000 and RR09-7-000
Informational Report of NERC on Standard Process Results for the Second Quarter 2012

NERC submits an informational report on the analysis of NERC Standards Process Results for the Second Quarter 2012 in compliance with an order issued by FERC on January 18, 2007 and a subsequent order on September 16, 2010. Docket Nos. RR06-1-000 and RR09-7-000​

7/31/2012
RM06-16-010 and RM06-16-011
Quarterly Report of NERC on Status of Development of BAL-003 (Frequency Response and Bias)

NERC submits its first quarterly report on the status of development of BAL-003 (Frequency Response and Bias) in compliance with FERC's May, 4, 2012 Order and Order No. 693. Docket Nos. RM06-16-010 and RM06-16-011​

7/31/2012
RM10-5-000
Informational Filing of NERC in Compliance with Order No. 758 - Interpretation of Protection System Reliability Standard

NERC files an informational filing containing the development schedule addressing issues in FERC-approved Reliability Standard PRC-005-1 (Transmission and Generation Protection System Maintenance and Testing). Docket No. RM10-5-000​

7/30/2012
RR12-12-000
Petition for Approval of Amendments to RFC's Delegation Agreement

NERC submits a petition for approval of Amendments to ReliabilityFirst Corporation's Delegation Agreement, including amendments to the Bylaws and Reliability Standards Development Procedure. Docket No. RR12-12-000​

7/30/2012
RM12-16-000
Petition for Approval of FAC-001-1, FAC-003-3, PRC-004-2.1a, and PRC-005-1.1b

NERC submits a petition for approval of proposed Reliability Standards FAC-001-1 (Facility Connection Requirements), FAC-003-3 (Transmission Vegetation Management), PRC-004-2.1a (Analysis and Mitigation of Transmission and Generation Protection System Misoperations), and PRC-005-1.1b (Transmission and Generation Protection System Maintenance and Testing). Docket No. RM12-16-000 ​

7/30/2012
RM12-1-000
Comments of NERC in Response to NOPR Proposing to Remand TPL-001-2

NERC submits comments in response to FERC's April 19, 2012 Notice of Proposed Rulemaking regarding a proposed remand of TPL-001-2  Transmission System Planning Performance Requirements. Docket No. RM12-1-000​

7/20/2012
RC08-5-003
Compliance Filing in response to April 19, 2012 Order

NERC submits a compliance filing in response to the April 19, 2012 Order which directed NERC to either register Ohio Valley Electric Corporation (OVEC) as a load-serving entity or submit a filing explaining why OVEC should not be registered for the load-serving entity function.  Docket No. RC08-5-003​

7/18/2012
AD11-9-000
NERC Response to FERC OER Letter Regarding Winterization and Related Issues

NERC submits a response to FERC OER's letter regarding NERC’s initiative to modify the Reliability Standards to address winterization and related issues. Docket No. AD11-9-000​

7/5/2012
RM11-11-000
Compliance Filing - Quarterly Report on Status of Development of Version 5 CIP Reliability Standards

NERC submits its first quarterly filing on the status of the development of the CIP Version 5 Reliability Standards.  Docket No. RM11-11-000​

7/2/2012
NP12-31-000
Withdrawal of Full Notice of Penalty

NERC submits a Withdrawal of Full Notice of Penalty in connection with the May 30, 2012 submitted Full Notice of Penalty regarding San Diego Gas & Electric.  Docket No. NP12-31-000.​

6/14/2012
NP12-28-000
Withdrawal of Notice of Penalty

NERC submits a Withdrawal of Full Notice of Penalty in connection with the May 30, 2012 submitted Full Notice of Penalty regarding Southern California Edison - Transmission & Distribution Business Unit.  Docket No. NP12-28-000.​

6/14/2012
RR12-8-000
Motion of NERC to Submit Answer to Comments on the Petition for Approval of Revision to the NERC Rules of Procedure

NERC requests leave to submit this answer to the comments filed in response to NERC’s Petition for Approval of Revisions to its Rules of Procedure filed on May 7, 2012.  Docket No. RR12-8-000​

6/7/2012
RM11-20-000
Motion of NERC to Correct the Record regarding Order No. 763

NERC submits a limited motion to correct the record in regard to the Commission’s Final Rule in this proceeding issued on May 7, 2012.  Docket No. RM11-20-000​

6/6/2012
RD12-4-000
Petition of NERC for Approval of Errata Changes to Seven Reliability Standards

NERC proposes errata changes and asks for approval of those changes going forward as BAL-005-0.2b (Automatic Generation Control); EOP-001-0.1b (Emergency Operations Planning); EOP-001-2.1b (Emergency Operations Planning); EOP-002-3.1 (Capacity and Energy Emergencies); IRO-005-3.1a (Reliability Coordination – Current Day Operations); PER-001-0.2 (Operating Personnel Responsibility and Authority); and TOP-002-2b (Normal Operations Planning). Docket No. RD12-4-000​

6/5/2012
RM06-16-000
First Quarter 2012 Nuclear Compliance Filing of NERC in Response to Paragraph 629 of Order No. 693

NERC submits the First Quarter 2012 compliance filing in response to Paragraph 629 of Order No. 693. Order No. 693 requires that NERC provide a quarterly informational filing regarding the timeframe to restore power to the auxiliary power systems of U.S. nuclear power plants following a blackout as determined during simulations and drills of system restoration plans. This filing contains the referenced material pertaining to the first quarter of 2012. Docket No. RM06-16-000​

5/31/2012
RR12-11-000
NERC 2011 True-Up - Report of Comparisons of Budgeted to Actual Costs for 2011 for NERC and the Regional Entities

NERC submits a filing to provide comparisons of actual to budgeted costs for the year 2011 for NERC and the eight Regional Entities.  Docket No. RR12-11-000​

5/30/2012
RM12-4-000
Response of NERC to FERC Office of Reliability's May 4, 2012 Data Request regarding FAC-003-2

NERC files its response to the FERC Office of Electric Reliability’s May 4, 2012 Data Request regarding FAC-003-2.  Docket No. RM12-4-000​

5/25/2012
RR12-10-000
 
NERC submits renewed CMEP Agreements between SERC and FRCC and SERC and SPP RE, and amendments to "Exhibit A to the Amended and Restated Delegation Agreement" of both agreements to reflect the effective date of the agreement. Docket No. RR12-10-000
 
5/24/2012
RM12-4-000
Comments of NERC in Response to PNNL Report on the Use of the Gallet Equation in FAC-003-2

NERC files comments in response to the report prepared by the Pacific Northwest National Laboratory (PNNL) on “Applicability of the ‘Gallet Equation’ to the Vegetation Clearances of NERC Reliability Standard FAC-003-2."  Docket No. RM12-4-000​

5/23/2012
RD12-3-000
Petition for Approval of Interpretation to CIP-006 (Physical Security of Critical Cyber Assets)

NERC submits a petition for approval of interpretation to Reliability Standard CIP-006 (Cyber Security — Physical Security of Critical Cyber Assets). This interpretation will be known as either CIP-006-3d or CIP-006-4d, whichever version of the standard is in effect at the time of FERC approval. Docket No. RD12-3-000​

5/23/2012
RC08-5-002
NERC's Request for Rehearing and Clarification - RC08-5

NERC submits a Request for Rehearing and Clarification in connection with the April 19 Order which granted an appeal filed by the United States Department of Energy, Portsmouth/Paducah Project Office (DOE PPPO) and found that it should not be registered as a load-serving entity (LSE) under the NERC Statement of Compliance Registry Criteria. Docket No. RC08-5-002​

5/21/2012
RM11-18-001
Request of NERC for Reconsideration, or in the Alternative, Rehearing of Order Remanding the Transmission Planning Reliability Standards

NERC submits a Request for Reconsideration, or in the Alternative, Rehearing of Order Remanding the Transmission Planning Reliability Standards.  Docket No. RM11-18-001​

5/21/2012
RR12-9-000
Petition for Approval of Amendments to MRO's Delegation Agreement

NERC submitted a petition for approval of amendments to the Delegation Agreement with Midwest Reliability Organization.  Docket No. RR12-9-000​

5/17/2012
RC11-6-002
NERC Compliance Filing (Compliance Enforcement Initiative)

NERC submits this filing in compliance with the March 15 Order where FERC accepted NERC's petition requesting approval of its proposal to make informational filings in a Find, Fix, Track and Report (FFT) spreadsheet format in connection with the Compliance Enforcement Initiative (CEI). Docket No. RC11-6-002​

5/14/2012
RC11-6-000
NERC's CEI Filing Informational Report

NERC submits this filing in compliance with the March 15 Order where FERC accepted NERC's petition requesting approval of its proposal to make informational filings in a Find, Fix, Track and Report (“FFT”) spreadsheet format in connection with the Compliance Enforcement Initiative ("CEI"). The Report describes the experience from September 2011 to March 2012 as well as the feedback received with regard to the initiative. Docket No. RC11-6-000 ​

5/14/2012
RR12-8-000

NERC submits a filing including revisions to Sections 300, 400, 600, 1000, 1400 and 1700 and to Appendices 2, 4B, 4C, and 5B, and the deletion of Appendices 3C and 6 to the NERC Rules of Procedure (ROP). The proposed revisions are the result of a wide-ranging, comprehensive review of the ROP that was conducted to identify improvements to the underlying processes reflected in the ROP based on the experience to date of NERC and the Regional Entities, to further implement actions identified in 2009 in NERC’s Three-Year ERO Performance Assessment Report, to eliminate internal inconsistencies, and to make other improvements and clarifications identified by the review teams. Docket No. RR12-8-000​

5/7/2012
RM12-12-000
Petition for Approval of Proposed NPCC Regional Reliability Standard PRC-006-NPCC-1 (Automatic Underfrequency Load Shedding)

NERC submits a petition for approval of proposed NPCC regional Reliability Standard PRC-006-NPCC-1 (Automatic Underfrequency Load Shedding). Docket No. RM12-12-000​

5/4/2012
RM12-4-000
Request for Information of NERC on the Notice Inviting Comments on the PNNL Report Concerning the Applicability of the Gallet Equation to the Veg. Clearances of NERC Trans. Veg. Mgt. RS FAC-003-2

NERC submits a request for information on the Notice Inviting Comments regarding FAC-003-2 related documents. Docket No. RM12-4-000

5/3/2012
RR06-1-015
Informational Report of NERC on Analysis of Standards Process Results for the First Quarter 2012

NERC submits an informational report on the analysis of NERC Standards Process Results for the First Quarter 2012 in compliance with an order issued by FERC on January 18, 2007 and a subsequent order on September 16, 2010. Docket No. RR06-1-015​

4/30/2012
RD12-1-000
Errata to Petition for Approval of Proposed Texas Regional Entity Reliability Standard IRO-006-TRE-1

NERC submits errata to the petition for approval of proposed Texas Regional Entity Reliability Standard IRO-006-TRE-1 to correct an incorrect reference to an effective date. Docket No. RD12-1-000​

4/27/2012
RM12-4-000
Errata to Petition for Approval of FAC-003-2

NERC submits an errata to the petition for approval of proposed Reliability Standard FAC-003-2 (Transmission Vegetation Management) correcting a typo in the Compliance section of the Reliability Standard. Docket No. RM12-4-000​

4/24/2012
RC11-6-001
Limited Request for Clarification, or, in the Alternative Rehearing of the March 15, 2012 FFT Order

NERC submits a limited request for clarification or, in the alternative, rehearing, of the FERC order issued on March 15, 2012. Docket No. RC11-6-001​

4/16/2012
RM10-5-000
Informational Filing in Response to FERC Order No. 758 - Interpretation of Protection System Reliability Standard

NERC submits a schedule regarding the development of certain technical documents including the identification of devices that are designed to sense or take action against any abnormal system condition that will affect reliable operation and a schedule for the development of the changes to the standard that NERC stated it would propose as a result of the above-referenced documents.  Docket No. RM10-5-000​

4/12/2012
AD12-12-000
Comments of NERC on the Coordination Between Natural Gas and Electricity Markets

NERC provides these comments in response to FERC's Notice Assigning Docket No. and Requesting Comments on the Coordination Between Natural Gas and Electricity Markets and FERC Commissioner Philip Moeller’s request for comments on a set of questions concerning gas-electric interdependence. Docket No. AD12-12-000​

3/30/2012
RM06-16-000
Motion for an Extension of Time
NERC submits a Motion for an Extension of Time to comply with directives from Order No. 693 with respect to BAL-003 (Resource and Demand Balancing Reliability Standard on Frequency Response and Frequency Bias). Docket No. RM06-16-000
 
3/30/2012
RR09-6-003
NERC 2012 Standards Report, Status, and Timetable for Addressing Regulatory Directives

NERC submits the second annual Standards Report, Status, and Timetable for Addressing Regulatory Directives summarizing the progress made and plans for addressing the standards-related directives.  Docket No. RR09-6-003

3/30/2012
RM96-1-037
Comments in Response to Notice of Proposed Rulemaking on Standard for Business Practices for Interstate Natural Gas Pipelines

NERC submits comments in response to a Notice of Proposed Rulemaking on Standards for Business Practices for Interstate Natural Gas Pipelines and in support of the modified Wholesale Gas Quandrant's (“WGQ”) Standard 0.3.14, which changes the parties to whom pipelines are required to provide notification of operational flow orders and other critical notices. Docket No. RM96-1-037

3/23/2012
RM06-16-000
Errata to NERC Glossary of Terms Definition of IROL

NERC submits an errata changing the term "Cascading Outages" in the FERC-approved NERC Glossary of Terms definition of Interconnection Reliability Operating Limit (IROL) to "Cascading outages."  Docket No. RM06-16-000

3/16/2012
RM10-6-000
Informational Filing of NERC in Response to Order No. 754

NERC submits an informational filing in response to Order No. 754 that includes a report on the reliability issues concerning system protection associated with the Commission-approved interpretation of Requirement R1.3.10 of Reliability Standard TPL-002-0. Docket No. RM10-6-000

3/15/2012
RR12-5-000
Petition for Approval of Amendments to SERC Reliability Corporation's Delegation Agreement

NERC submitted a Petition for Approval of Amendments to SERC Reliability Corporation's Delegation Agreement, specifically to the SERC’s Bylaws and Regional Standards Development Procedure.  Docket No. RR12-5-000​

3/15/2012
AD12-1-000
Comments of NERC and the Eight Regional Entities on the Commission Role Regarding the Environmental Protection Agency's Mercury and Air Toxics Standards

NERC submits these comments on behalf of itself and the eight Regional Entities on the Staff White Paper on the Commission’s Role Regarding Environmental Protection Agency’s Mercury and Air Toxics Standards (“MATS”). Docket No. AD12-1-000​

2/29/2012
RM06-16-000
Fourth Quarter 2011 Nuclear Compliance Filing in Response to Order No. 693 (4Q2011)

NERC provides a quarterly informational filing regarding the timeframe to restore power to the auxiliary power systems of U.S. nuclear power plants following a blackout as determined during simulations and drills of system restoration plans. This filing contains the referenced material pertaining to the Fourth Quarter 2011. Docket No. RM06-16-000 ​

2/29/2012
RM12-2-000
NOPR Comments on Filing of Privileged Materials and Answers to Motions

NERC submits Notice of Proposed Rulemaking ("NOPR") comments in response to FERC’s December 16, 2011 NOPR regarding the Filing of Privileged Materials and Answers to Motions. Docket No. RM12-2-000​

2/27/2012
RR12-4-000
Petition for Approval of Amendments to Delegation Agreements with FRCC - Amendments to FRCC's Bylaws and to Exhibit D of the FRCC Delegation Agreement

NERC submits a filing seeking approval of proposed amendments to NERC’s Delegation Agreement with the Florida Reliability Coordinating Council, Inc. (FRCC) including approval of amendments to FRCC’s Bylaws (included in Exhibit B to the Delegation Agreement) as a “Regional Entity Rule.” Docket No. RR12-4-000​

2/22/2012
RM12-9-000
Petition for Approval of Proposed SERC Regional Reliability Standard PRC-006-SERC-01 – Automatic Underfrequency Load Shedding Requirements

NERC submits a petition for approval of proposed Regional Reliability Standard, PRC-006-SERC-01 – Automatic Underfrequency Load Shedding Requirements. This standard provides regional underfrequency load shedding (“UFLS”) requirements for registered entities in the SERC Reliability Corporation region. Docket No. RM12-9-000​

2/1/2012
RD12-1-000
Petition for Approval of Proposed Texas Reliability Entity Regional Reliability Standard IRO-006-TRE-1 - IROL and SOL Mitigation in the ERCOT Interconnection

NERC submits a petition for approval of Regional Reliability Standard IRO-006-TRE-1 – IROL and SOL Mitigation in the ERCOT Interconnection. This standard was developed to provide and execute transmission loading relief procedures that can be used to avoid and mitigate System Operating Limits (“SOL”) or Interconnection Reliability Operating Limits (“IROL”) exceedences for the purpose of maintaining the reliable operation of the bulk electric system in the ERCOT region. Docket No. RD12-1-000​

2/1/2012
RR06-1-000 and RR09-7-000
Informational Report of NERC on Analysis of Standards Process Results for the Fourth Quarter 2011

NERC submits an informational report on the analysis of NERC Standards Process Results for the Fourth Quarter 2011 in compliance with an order issued by FERC on January 18, 2007 and a subsequent order on September 16, 2010. Docket Nos. RR06-1-000 and RR09-7-000​

1/31/2012
RM12-6-000
Petition for Approval of a Revised Definition of "Bulk Electric System" in the NERC Glossary of Terms Used in Reliability Standards

NERC submits a petition for approval of a revised definition of “Bulk Electric System” in the NERC Glossary of Terms Used in Reliability Standards.  Docket No. RM12-6-000

1/25/2012
RM12-7-000
Petition for Approval of Revisions to its Rules of Procedure to Adopt a Bulk Electric System Exception Procedure

NERC submits a filing in which it requests the Commission to approve revisions to NERC’s Rules of Procedure (“ROP”) for the purpose of adopting a procedure for requesting and receiving exceptions from the NERC definition of Bulk Electric System (“BES Exception Procedure”), as directed by the Commission in Order No. 743. Docket No. RM12-7-000​

1/25/2012
NP12-8-000
NERC submits supplemental information regarding SMUD NOP

NERC submits a supplemental informational filing regarding the December 30, 2011 Sacramento Municipal Utility District Notice of Penalty filing. Docket No. NP12-8-000

1/23/2012
RD11-10-000
Compliance Filing in Response to November 17, 2011 Order Approving Reliability Standard FAC-008-3

NERC submits a revision to one VRF for Reliability Standard FAC-008-3, Requirement R2 in compliance with the November 17, 2011 order approving Reliability Standard FAC-008-3.  Docket No. RD11-10-000

1/17/2012
RD11-3-000
Compliance Filing in Response to November 17, 2011 Order Approving Reliability Standard FAC-013-2

NERC submits a FERC-directed revision to two VRFs and one VSL for Reliability Standard FAC-013-2 in compliance with the November 17, 2011 Order approving Reliability Standard FAC-013-2.  Docket No. RD11-3-000

1/17/2012
RC11-1-000 and RC11-2-000
Answer to Comments regarding Compliance Filing for Cedar Creek Wind Energy and Milford Wind Corridor Phase I

On December 23, 2011, the Electric Power Supply Association (EPSA), the Edison Electric Institute (EEI) and the American Wind Energy Association (AWEA) filed comments in the dockets regarding NERC’s December 2, 2011 compliance filing for Cedar Creek Wind Energy and Milford Wind Corridor Phase I. NERC submits this answer to the comments. Docket Nos. RC11-1-000 and RC11-2-000

1/11/2012
RR09-7-000 and RR10-11-000
Informational Filing regarding Paragraph 773 of Order No. 672

On December 23, 2010, NERC submitted an informational filing in response to Paragraph 773 of Order No. 672 regarding the initial Three Year Regional Entity Audits and Plan for Future Audits. NERC submits this informational filing to report that the initial Audit activities of the eight Regional Entities are completed and to provide information on its plans to focus efforts to restructure the Regional Entity Audit Program. Docket Nos. RR09-7-000 and RR10-11-000

1/6/2012
RM11-20-000
Comments in Response to Underfrequency Load Shedding NOPR

Comments in Response to Notice of Proposed Rulemaking regarding Automatic Underfrequency Load Shedding And Load Shedding Plans Reliability Standards.  Docket No. RM11-20-000

12/23/2011
RM11-18-000
Comments of NERC in Response to NOPR on Transmission Planning Reliability Standards Table 1, Footnote 'b'

NERC files Comments in Response to Notice of Proposed Rulemaking regarding a proposed revision to footnote ‘b’ of Table 1 in four proposed Transmission Planning Reliability Standards.  Docket No. RM11-18-000​

12/21/2011
RM12-4-000
Petition for Approval of Proposed Reliability Standard FAC-003-2 - Transmission Vegetation Management

NERC files a Petition for Approval of Proposed Reliability Standard FAC-003-2 — Transmission Vegetation Management.  Docket No. RM12-4-000​

12/21/2011
NP12-5-000
Supplemental Information regarding Spreadsheet NOP - NP12-5-00

NERC submits supplemental information regarding the spreadsheet Notice of Penalty violations for Public Utility District No. 1 of Clark County which were filed on November 30, 2011.  Docket No. NP12-5-000

12/20/2011
RM05-17-000, RM05-25-000, RM06-16-000
NERC Standards Development Plan 2012-2014 Informational Filing Pursuant to Section 310 of the NERC Rules of Procedure

NERC submits the Standards Development Plan 2012-2014 Informational Filing Pursuant to Section 310 of the NERC Rules of Procedure detailing current and upcoming Standards projects and timelines.  Docket Nos. RM05-17-000, RM05-25-000, RM06-16-000

12/13/2011
RM11-11-000
Reply Comments in response to Notice of Proposed Rulemaking on CIP Version 4 Reliability Standards

NERC submits reply comments in response to comments filed in response to the Notice of Proposed Rulemaking on CIP Version 4 Reliability Standards.  Docket No. RM11-11-000

12/5/2011
RC11-1-000, RC11-2-000
Compliance Filing in accordance with the June 16, 2011 Order

NERC submits a filing in compliance with the directives in the Commission’s Order issued June 16, 2011. The June 16 Order upheld the registration of Cedar Creek Wind Energy and Milford Wind Corridor Phase I and required them to comply with a list of Transmission Owner and Transmission Operator Reliability Standards and Requirements that apply to the entities. Docket Nos. RC11-1-000 and RC11-2-000

12/2/2011
RC11-5-000
Response to Request for Production and Request for Confidential Treatment

NERC submits a Response to Request for Production and Request for Confidential Treatment in response to the request of City of Holland. Docket No. RC11-5-000​

12/2/2011
RR12-3-000
Petition for Approval of Definition and Capitalization Revisions to the NERC Rules of Procedure

NERC submits a petition for approval of Definition and Capitalization Revisions to the NERC Rules of Procedure. The purposes of the proposed revisions are (1) to place all definitions of defined terms used anywhere in the ROP in a single, readily-accessible location (proposed new Appendix 2); (2) to capitalize defined terms throughout the ROP where such terms are intended to be used in their defined meanings; and (3) to lower-case other terms that are currently capitalized in the ROP but are not defined terms.  Docket No. RR12-3-000

11/29/2011
RM06-16-000
Third Quarter 2011 Compliance Filing of the North American Electric Reliability Corporation in Response to Paragraph 629 of Order No. 693

NERC submits the Third Quarter 2011 Compliance Filing of the North American Electric Reliability Corporation in Response to Paragraph 629 of Order No. 693. Order No. 693 requires that NERC provide a quarterly informational filing regarding the timeframe to restore power to the auxiliary power systems of U.S. nuclear power plants following a blackout as determined during simulations and drills of system restoration plans. This filing contains the referenced material pertaining to the third quarter of 2011.  Docket No. RM06-16-000

11/23/2011
RM08-13-001
Motion for an Extension of Time regarding a new Generator Relay Loadability Reliability Standard

NERC submits a Motion for Extension of Time to address the directive in Order No. 733 to develop a new generator relay loadability standard, in accordance with NERC’s Reliability Standards Development Plan 2012-2014.  Docket No. RM08-13-001

11/22/2011
RM09-25-000
Motion for Extension of Time regarding System Personnel Training Reliability Standard

NERC submits a Motion for Extension of Time to address the directive in Order No. 742 regarding whether personnel that support EMS applications should be included in a Support Personnel Training Reliability Standard, in accordance with NERC’s Reliability Standards Development Plan 2012-2014.  Docket No. RM09-25-000

11/22/2011
RR12-2-000
Petition of NERC for Approval of Amendments to Delegation Agreement with WECC

NERC submits a petition requesting the Commission’s approval of amendments to the Amended and Restated Delegation Agreement  between NERC and the Western Electricity Coordinating Council (WECC), one of the NERC Regional Entities (the WECC RDA). The proposed amendments to the WECC RDA consist of amendments to Exhibit B – the WECC Bylaws, and to Exhibit C – the WECC Regional Reliability Standards Development Procedure (RSDP). Docket No. RR12-2-000

11/22/2011
RM11-16-000
Comments in Response to NOPR on Reliability Standard PRC-023-2

NERC submits comments in response to the Notice of Proposed Rulemaking on proposed Reliability Standard PRC-023-2 (Transmission Relay Loadability). Docket No. RM11-16-000

11/21/2011
RM11-11-000
Comments in Response to NOPR on Version 4 CIP Reliability Standards

NERC submits comments in response to the Notice of Proposed Rulemaking on the Version 4 Critical Infrastructure Protection Reliability Standards.  Docket No. RM11-11-000

11/21/2011
RC11-6-000
Motion for Leave to Answer and Answer

NERC submits a Motion for Leave to Answer and Answer in response to the Petition Requesting Approval of New Enforcement Mechanisms and Submittal of Initial Informational Filing Regarding NERC’s Efforts to Refocus Implementation of its Compliance Monitoring and Enforcement Program. NERC’s Answer is limited and will clarify certain concerns raised in the comments of the ISO/RTO Council (IRC). Docket No. RC11-6-000

11/14/2011
RR12-1-000
Petition for Approval of a Revision to the Rules of Procedure- Correction to Section 1.3 of Appendix 4D  

NERC submits a Petition for Approval of a Revision to the Rules of Procedure of the North American Electric Reliability Corporation – Correction to Section 1.3 of Appendix 4D, “Procedure for Requesting and Receiving Technical Feasibility Exceptions to NERC Critical Infrastructure Protection Standards.”  Docket No. RR12-1-000

11/14/2011
RC11-1-000, RC11-2-000
Joint Motion for Extension of Time to Submit Compliance Filing

NERC, WECC, et al. submit a joint motion for extension of time from November 14, 2011 to December 2, 2011 to allow NERC to submit a compliance filing in response to the Commission’s June 16, 2011 Order regarding the registration of Cedar Creek Wind Energy, LLC and Milford Wind Corridor Phase I, LLC. The Commission directed NERC to submit a compliance filing identifying the Reliability Standards and Requirements that will be applicable to Cedar Creek and Milford. Docket Nos. RC11-1-000 and RC11-2-000

11/10/2011
RR10-11-004
Compliance Filng in Response to the October 7, 2011 Order

NERC submits a Compliance Filing in Response to the October 7, 2011 Order.  Specifically, in the October 7, 2011 Order, the Commission rejected NERC's proposal to delete Section 402.1.3.2 of the NERC Rules of Procedure; this compliance filing is made to restore Section 402.1.3.2 to the NERC Rules of Procedure.  Docket No. RR10-11-004

11/7/2011
RR06-1-000, RR09-7-000
Informational Report of NERC on Analysis of Standards Process Results for the Third Quarter 2011

NERC submits an informational report on the analysis of NERC Standards Process Results for the Third Quarter 2011 in compliance with an order issued by FERC on January 18, 2007 and a subsequent order on September 16, 2010.  Docket Nos. RR06-1-000 and RR09-7-000

10/31/2011
RM12-1-000
Petition for Approval of a Revised Transmission Planning System Performance Requirements Reliability Standard TPL-001-2

NERC submits a petition for approval of a Revised Transmission Planning System Performance Requirements Reliability Standard TPL-001-2 and five new glossary terms and for retirement of four existing Reliability Standards.  Docket No. RM12-1-000

10/19/2011
RC11-5-000
Motion to Intervene and Comments regarding City of Holland, Michigan Board of Public Works

NERC submits a Motion to Intervene and Comments in response to the appeal of the City of Holland, Michigan Board of Pubilc Works.  Docket No. RC11-5-000

10/3/2011
RC11-6-000
Petition Requesting Approval of New Enforcement Mechanisms and Submittal of Initial Find Fix and Track (FFT) Informational Filing 

NERC submits a Petition Requesting Approval of New Enforcement Mechanisms and Submittal of Initial Find Fix and Track (FFT) Informational Filing in Docket No. RC11-6-000. (Spreadsheet Attachment to the Filing)

9/30/2011
RR10-1-000
First Annual Annual Report of NERC on Wide-Area Analysis of Technical Feasibility Exceptions

NERC files the first Annual Report of the North American Electric Reliability Corporation on Wide-Area Analysis of Technical Feasibility Exceptions.  Docket No. RR10-1-000

9/28/2011
NP11-238-000
Additional Comments in Support of NP11-238

NERC submits additional comments in support of the Notice of Penalty filed on July 28, 2011 regarding a Notice of Penalty for Southwestern Power Administration. Docket No. NP11-238-000

9/19/2011
RC11-1-000, RC11-2-000
Joint Motion for Extension of Time

NERC and WECC submit a joint motion for extension of time from September 14, 2011 to November 14, 2011 to allow NERC to submit a compliance filing in response to the Commission’s June 16, 2011 Order regarding the registration of Cedar Creek Wind Energy, LLC and Milford Wind Corridor Phase I, LLC.  The Commission directed NERC to submit a compliance filing identifying the Reliability Standards and Requirements that will be applicable to Cedar Creek and Milford. Docket Nos. RC11-1-000 and RC11-2-000 

9/13/2011
RD11-12-000
Petition for Approval of Interpretations to Requirements of Reliability Standards EOP-001-0b and EOP-001-2b (Emergency Operations Planning)

NERC files a petition for approval of interpretations to EOP-001-0 Requirements R1 and R3.2, and to EOP-001-2 Requirements R1 and R2.2. Docket No. RD11-12-000

9/9/2011
RM06-16-000
Second Quarter 2011 Compliance Filing of the NERC in Response to Paragraph 629 of Order No. 693

NERC files the Second Quarter 2011 Compliance Filing of the NERC in Response to Paragraph 629 of Order No. 693. Docket No. RM06-16-000

8/31/2011
RR11-7-000
Request of NERC for Acceptance of 2012 Business Plan and Budget and the 2012 Business Plans and Budget of Regional Entities

NERC files a Request for Acceptance of 2012 Business Plan and Budget and the 2012 Business Plans and Budget of Regional Entities and for Approval of Proposed Assessments to Fund Budgets.  Docket No. RR11-7-000

8/24/2011
RM09-13-000
Motion to Further Defer Action on Time Error Correction Reliability Standard

NERC submits a Motion to Further Defer Action on the Time Error Correction Reliability Standard.  Docket No. RM09-13-000

8/11/2011
RR06-1-000, RR09-7-000
Informational Report of NERC on Analysis of Standard Process Results for the Second Quarter 2011

NERC submits a quarterly Informational Report on Analysis of Standard Process Results for the Second Quarter 2011.  Docket Nos. RR06-1-000, RR09-7-000

7/29/2011
RR09-6-003
Informational Report on NERC Standards Status and Timetable for Addressing Regulatory Directives

NERC submits a report summarizing the progress made, and plans for addressing the standards-related directives received from applicable ERO governmental authorities.  Docket No. RR09-6-003

7/26/2011
RM11-11-000
Filing in Support of June 20, 2011 WECC Compliance Filing in Response to Order Nos. 751 and 752

NERC submits a filing in support of the June 20, 2011 compliance filing of The Western Electricity Coordinating Council in Response to Order Numbers 751 and 752 on Version One Regional Reliability Standards.  Docket Nos. RM11-11-000

7/21/2011
RM08-13-000
Informational Filing of the NERC in Response to Order 733-A on Rehearing, Clarification, and Request for an Extension of Time

NERC submits an Informational Filing of the NERC in Response to Order 733-A on Rehearing, Clarification, and Request for an Extension of Time addressing certain aspects of the August 14, 2003 blackout investigation relative to operation of protective relays in response to stable power swings. Docket No. RM08-13-000

7/21/2011
NP11-206-000
Supplemental Filing for a Notice of Penalty - Docket No. NP11-206

North American Electric Reliability Corporation submits a Supplemental Filing regarding a Notice of Penalty for an Unidentified Registered Entity in Docket No. NP11-206-000.

7/20/2011
RC11-1-001, RC11-2-001
Request for Clarification or, in the Alternative, Rehearing of the Order Denying Appeals of Compliance Registry Determinations of Milfod and Cedar Creek

NERC files a Request for Clarification or, in the Alternative, Rehearing of the Order Denying Appeals of Electric Reliability Organization Registration Determinations concerning Milford Wind Corridor Phase I, LLC, and Cedar Creek Wind Energy.  Docket Nos. RC11-1-001 and RC11-2-001

7/18/2011
NP11-213-000
Supplemental Informational Filing - NP11-213

NERC submitted a supplemental informational filing regarding the June 29, 2011 Notice of Penalty for an Unidentified Registered Entity.  Docket No. NP11-213-000

7/15/2011
RM10-6-000
Comments of NERC in Support of the Supplemental Comments in the July 13th Filing of the Trade Associations

NERC submits comments in support of the Supplemental Comments of Edison Electric Institute, the American Public Power Association, the National Rural Electric Cooperative Association, the Electric Power Supply Association, the Transmission Access Policy Study Group, and the Canadian Electricity Association regarding the proposed interpretation of Reliability Standard TPL-002, Requirement R1.3.10.  Docket No. RM10-6-000

7/13/2011
NP11-184-000
NERC and ReliabilityFirst Corporation Response to the June 24, 2011 Data Request

Response of NERC and ReliabilityFirst Corporation to the June 24, 2011 Letter Order Requesting Data and Documents filed with FERC in Docket No. NP11-184-000

7/8/2011
RM11-11-000
Response of NERC to April 12 , 2011 CIP Data Request - Part II

NERC submits part II of its response to the April 12, 2011 FERC Data Request concerning CIP Version 4 Reliability Standards. Doket No. RM11-11-000​

6/30/2011
RM11-12-000
Comments of NERC in Response to the Notice of Proposed Rulemaking on the Availability of e-Tag Information to the Commission Staff

NERC files comments in response to Notice of Proposed Rulemaking on the Availability of e-Tag Information to Commission Staff.  Docket No. RM11-12-000​

6/27/2011
RM10-29-000
Comments on Notice of Proposed Rulemaking Regarding Interpretation of TOP-001-1

NERC submits comments in support of FERC's proposal in the Notice of Proposed Rulemaking Regarding Interpretation of TOP-001-1.  Docket No. RM10-29-000​

6/24/2011
RD11-6-000
Petition for Approval of Reliability Standard CIP-001-2a (Sabotage Reporting) with a Regional Variance for the Texas Reliability Entity

NERC submits a petition for approval of Reliability Standard CIP-001-2a (Sabotage Reporting) with a Regional Variance for Texas Reliability Entity. Docket No. RD11-6-000

6/21/2011
RM11-28-000
Petition for Approval of Proposed Reliability Standard FAC-008-3 (Facility Ratings)

NERC submits a petition for approval of proposed Reliability Standard FAC-008-3 (Facility Ratings). Docket No. RM11-28-000

6/15/2011
RR11-5-000
Petition for Approval of Appendices 3B and 3D to the NERC ROP Regarding the Election Procedure for Members of NERC SC and RBB Criteria

NERC files a petition for Approval of Appendices 3B and 3D to the NERC Rules of Procedure Regarding the Election Procedure for Members of NERC Standards Committee and Registered Ballot Body Criteria.  Docket No. RR11-5-000​

6/13/2011
RM11-18-000
Response to FERC's 5/17/11 Letter

NERC submits a Response to the Commission’s May 17, 2011 Letter Requesting Additional Information Regarding NERC’s Request for Approval of Four Transmission Planning System Performance Reliability Standards.  Docket No. RM11-18-000​

6/7/2011
RM11-11-000
Supplemental Information Regarding CIP Version 4 VRFs and VSLs

In response to a FERC staff request, NERC submits a supplemental filing including the CIP Version 4 VRFs and VSLs in Docket No. RM11-11-000.​

6/6/2011
RM06-16-000
First Quarter 2011 Compliance Filing in Response to Paragraph 629 of Order No. 693

NERC submits the First Quarter 2011 Compliance Filing of the North American Electric Reliability Corporation in Response to Paragraph 629 of Order No. 693.  Order No. 693 requires that NERC provide a quarterly informational filing regarding the timeframe to restore power to the auxiliary power systems of U.S. nuclear power plants following a blackout as determined during simulations and drills of system restoration plans. This filing contains the referenced material pertaining to the first quarter of 2011.  Docket No. RM06-16-000​

5/31/2011
RD11-8-000
Petition for Approval of Proposed NPCC Regional Reliability Standard PRC-002-NPCC-01 (Disturbance Monitoring)

NERC submits a petition for approval of proposed NPCC regional Reliability Standard PRC-002-NPCC-01 (Disturbance Monitoring).  Docket No. RD11-8-000​

5/31/2011
RR11-4-000
Report of Comparisons of Budgeted to Actual Costs for 2010

NERC submits a true-up Report of Comparisons of Budgeted to Actual Costs for 2010 for NERC and the Regional Entities  Docket No. RR11-4-000​

5/31/2011
RC11-3-000
Doc-Less Motion to Intervene in RC11-3-000

NERC submitted a doc-less Motion to Intervene regarding the Joint Petition for Authorization to Intervene in a CEA Hearing, for Expedited Consideration and for Alternative Relief. Docket No. RC11-3-000​

5/27/2011
RM11-11-000
Response of NERC to April 12, 2011 CIP Data Request

NERC submits a Response to the Federal Energy Regulatory Commission Office of Electric Reliability’s April 12, 2011 Data Request.  Docket No. RM11-11-000​

5/27/2011
RR11-3-000
Petition for Approval of Amendments to Delegation Agreement with NPCC, Inc.

NERC submmits a petition that seeks approval of proposed amendments to NERC’s Delegation Agreement with the Northeast Power Coordinating Council, Inc. (NPCC) and approval of amendments to NPCC’s Bylaws and Regional Reliability Standards Development Procedure (included in Exhibits B and C to the Delegation Agreement) as “Regional Entity Rules.”  Docket No. RR11-3-000​

5/25/2011
RR11-2-000
Petition for Approval of CMEP Agreement Between NPCC and WECC and Related Amendment to Delegation Agreements

NERC submits a petition that seeks approval of (1) an Agreement Between Northeast Power Coordinating Council [NPCC] and Western Electricity Coordinating Council [WECC] Concerning Compliance Monitoring and Enforcement of WECC Registered Functions, (2) to the extent necessary, an Agreement between NERC and WECC concerning termination of their existing Agreement Concerning Compliance Monitoring and Enforcement of WECC Registered Functions, and (3) related amendments to the Delegation Agreements between NERC and NPCC and NERC and WECC.  Docket No. RR11-2-000​

5/25/2011
RM11-12-000
Errata to Petition for Approval of Proposed New Reliability Standards and Implementation Plans Related to Under-Frequency Load Shedding

NERC submits an errata to the Petition of the North American Electric Reliability Corporation for Approval of Proposed New Reliability Standards and Implementation Plans Related to Under-frequency Load-Shedding.  Docket No. RM11-12-000​

5/17/2011
RR10-12-001
Supplemental Information Regarding the Meaning of "Necessary" in NERC's 12/1/10 Compliance Filing in Response to FERC's 9/3/10 Order

NERC submits a letter to FERC regarding the meaning of the work "necessary" in NERC’s December 1, 2010 Compliance Filing in Response to Federal Energy Regulatory Commission’s September 3, 2010 Order Approving Petition and Directing Compliance Filing. Docket No. RR10-12-001

5/17/2011
RM05-17-000, RM05-25-000, RM06-16-000
Supplemental Filing to NERC's April 5, 2011 Informational Filing of the RSDP 2011-2013

NERC files a supplemental Filing to the Reliability Standards Development Plan 2011-2013 Informational Filing Pursuant to Section 310 of the NERC Rules of Procedure made on April 5, 2011 to provide additional documents.  Docket Nos. RM05-17-000, RM05-25-000, and RM06-16-000​

5/13/2011
NP11-181-000
Errata to the April 29, 2011 ACP Filing

NERC submits an errata to the April 29, 2011 Administrative Citation Process Notice of Penalty filing. (Spreadsheet) Docket No. NP11-181-000​

5/11/2011
AD11-8-000
Comments in Response to LBNL's Frequency Response Report

NERC submits comments in response to the January 20, 2011 release of the FERC-sponsored report prepared by the Lawrence Berkeley National Laboratory on the Use of Frequency Response Metrics to Assess the Planning and Operating Requirements for Reliable Integration of Variable Renewable Generation and its five supporting papers. Docket No. AD11-8-000​

5/6/2011
RM06-16-000, RD10-14-000
Request to Withdraw Prior Request to Terminate Quarterly Informational Filing

Request to withdraw request to terminate the quarterly informational filing obligation in Order No. 693, Paragraph 629 under Docket Nos. RM06-16-000 and RD10-14-000.​

5/6/2011
RR06-1-000, RR09-7-000
First Quarter 2011 Analysis of NERC Standards Process Results

NERC submits its Analysis of NERC Standards Process Results for the First Quarter 2011 under Docket Nos. RR06-1-000 and RR09-7-000.​

5/2/2011
RD11-7-000
Petition for Approval of a Personnel Performance, Training, and Qualifications Reliability Standard PER-003-1

NERC submits a Petition for Approval of a Personnel Performance, Training, and Qualifications Reliability Standard PER-003-1.  Docket No. RD11-7-000​

4/29/2011
RM06-16-009, RM11-18-000
Errata to Petition for Approval of Four Transmission Planning System Performance Reliability Standards and Retirement of Four Existing Reliability Standards

NERC submits an errata to the Petition of NERC for Approval of Four Transmission Planning System Performance Reliability Standards and Retirement of Four Existing Reliability Standards correcting an implementation date stated in the body of the filing.  Docket No. RM06-16-009 and RM11-18-000​

4/26/2011
RR11-1-000, RR11-1-001
Motion to Intervene, Request to Consolidate of Dockets, and Response of NERC the NPPD and SPP RE Petition for Review of NERC's Denial of Request

NERC submits a Motion to Intervene, Request to Consolidate Dockets, and Response of NERC to Petitions of the NPPD and SPP RE for Review of NERC’s Denial of Request to Amend Two Delegation Agreements and to Transfer Registration.  Docket Nos. RR11-1-000 and RR11-1-001​

4/21/2011
RM10-15-000
Request for Clarification of Order No. 748 Regarding Mandatory Reliability Standards for Interconnection Reliability Operating Limits

NERC submits a request for clarification of Order No. 748 regarding three key elements regarding Mandatory Reliability Standards for Interconnection Reliability Operating Limits.  Docket No. RM10-15-000​

4/18/2011
RM10-16-000
Request for Clarification of Order No. 749 Regarding System Restoration Reliability Standards

NERC submits a Request for Clarification of Order No. 749 Regarding System Restoration Reliability Standards.  Docket No. RM10-16-000​

4/18/2011
NP10-18-002
Request for for Clarification, or, in the Alternative, Rehearing and Motion To Intervene Out-Of-Time of FRCC, MRO, NPCC, SPP RE and Texas RE - NP10-18

NERC, FRCC, MRO, NPCC, SPP RE, Texas RE and WECC submit a Request for Clarification, or, in the Alternative, Rehearing and Motion to Intervene Out-Of-Time of FRCC, MRO, NPCC, SPP RE and Texas RE under Docket No. NP10-18-002.​

4/18/2011
RM11-23-000
Petition for Approval of an Interpretation to Reliabiliity Standard TOP-002-2a

NERC submits a petition for approval of an interpretation to Requirement R10 of Reliability Standard TOP-002-2a (Normal Operations Planning). The interpretation is called TOP-002-2b. Docket No. RM11-23-000​

4/15/2011
RD11-5-000
Petition for Approval of Interpretations to Reliability Standard PRC-004-1 and PRC-005-1

NERC submits a Petition for Approval of Interpretations of Requirements R1 and R3 to Reliability Standard PRC-004-1— Analysis and Mitigation of Transmission and Generation Protection System Misoperations and Requirements R1 and R2 to Reliability Standard PRC-005-1 — Transmission and Generation Protection System Maintenance and Testing.  Docket No. RD11-5-000​

4/15/2011
RM11-11-000, RM06-22-000
Request for an Extension of Time to Respond to April 12, 2011 Data Request Regarding Petition for Approval of CIP Version 4 Reliability Standards

NERC submits a Request for an Extension of Time to Respond to the April 12, 2011 Data Request Regarding the NERC Petition for Approval of CIP Version 4 Reliability Standards.  Docket Nos. RM11-11-000 and RM06-22-000​

4/13/2011
RM06-22-000
Errata to Petition for Approval of CIP Version 4 Reliability Standards

NERC submits an Errata to the Petition for Approval of Critical Infrastructure Protection (CIP) Reliability Standards Version 4 correcting several parts of the original petition.  Docket No. RM06-22-000​

4/12/2011
RM11-2-000
Comments in Response to January 31, 2011 Technical Conference Regarding Smart Grid Interoperability Standards

NERC submits comments following the January 31, 2011 Technical Conference on NIST's five foundational families of smart grids and NERC recommendations.  Docket No. RM11-2-000​

4/8/2011
RM05-17-000 , RM05-25-000, RM06-16-000
Informational Filing of Reliability Standards Development Plan 2011-2013 Informational Filing Pursuant to Section 310 of the NERC Rules of Procedure

NERC submits an informational filing containing the Reliability Standards Development Plan for 2011-2013 Pursuant to Section 310 of the NERC Rules of Procedure.  Docket No. RM05-17-000 , RM05-25-000, and RM06-16-000​

4/5/2011
NP11-162-000
Errata Regarding Administrative Citation Process Notice of Penalty for Eight Registered Entities

NERC submits an errata concerning it's March 31, 2011 Administrative Citation Process Notice of Penalty regarding eight registered entities, including The Detroit Edison Company. By this filing, NERC clarifies that the penalty amount associated with the VAR-002-1 R3.1 violation should be $5,000 instead of $10,000.  Docket No, NP11-162-000​

4/4/2011
RM06-16-009, RM11-18-000
Petition for Approval of Four Transmission Planning System Performance Reliability Standards and Retirement of Four Existing Reliability Standards

NERC submits a Petition for Approval of Four Transmission Planning System Performance Reliability Standards and Retirement of Four Existing Reliability Standards. NERC requests that FERC approve four revised Reliability Standards: TPL-001-1, TPL-002-1b, TPL-003-1a, andTPL-004-1. NERC also seeks the concurrent retirement of four existing Reliability Standards: TPL-001-0.1, TPL-002-0b, TPL-003-0a, and TPL-004-0.  Docket No. RM06-16-009 and RM11-18-000​

3/31/2011
RM11-20-000
Petition for Approval of Proposed New Reliability Standards and Implementation Plans Related to Under-Frequency Load-Shedding

NERC submits a Petition for Approval of Proposed New Reliability Standards and Implementation Plans Related to Under-Frequency Load-Shedding.  In this filing, NERC requests the FERC to approve PRC-006-1 and EOP-003-2 and requests FERC approval for implementation plans that call for the retirement of  PRC-006-0, PRC-007-0, PRC-009-0 and EOP-003-1.  Docket No. RM11-20-000​

3/31/2011
RM11-19-000
Petition for Approval of a Proposed Modification to Protection System Definition

NERC submits a Petition of NERC for Approval of a Proposed Modification to the Glossary of Terms Used in Reliability Standards Definition of “Protection System.”  Docket No. RM11-19-000​

3/30/2011
AD11-6-000
Comments of NERC Following the February 8, 2011 Technical Conference on Priorities for Addressing Risks to the Reliability of the Bulk-Power System

NERC files comments following the February 8, 2011 Technical Conference on Priorities for Addressing Risks to the Reliability of the Bulk-Power System.  Docket No. AD11-6-000​

3/21/2011
RD10-6-000, RD09-7-002
Compliance Filing in Response to January 20, 2011 Order on Violation Risk Factors and Violation Severity Levels for CIP Reliability Standards

NERC submits a Compliance Filing in Response to January 20, 2011 Order on Violation Risk Factors (VFRs) and Violation Severity Levels (VSLs) for Critical Infrastructure Protection Reliability Standards.  Docket No. RD10-6-000, RD09-7-002​

3/21/2011
RR08-4-000, RR08-4-001, RR08-4-002, RR08-4-005
Supplemental Information to the NERC Compliance Filing in Response to the Order on Violation Severity Levels Proposed by the ERO

Supplemental Information to the NERC Compliance Filing in Response to the Order on Violation Severity Levels (VSLs) Proposed by NERC.  Docket Nos. RR08-4-000, RR08-4-001, RR08-4-002, and RR08-4-005​

3/21/2011
RM08-13-000
Petition for Approval of a Protection and Control (PRC) Reliability Standard PRC-023-2

NERC submits a petition for approval of PRC-023-2 – Transmission Relay Loadability.  NERC also requests FERC approval of a proposed addition to the NERC Rules of Procedure, Section 1700 – Challenges to Determinations. This filing satisfies certain directives the Commission issued in Order No. 733 pertaining to developing modifications to PRC-023-1.  Docket No. RM08-13-000​

3/18/2011
NP11-114-000
Supplemental Information regarding a Notice of Penalty - NP11-114

NERC submits supplemental information regarding a Notice of Penalty for Texas Municipal Power Agency.  Docket No. NP11-114-000​

3/18/2011
NP11-128-000
Supplemental Information regarding a Notice of Penalty - NP11-128

NERC submits supplemental information regarding a Notice of Penalty for an Unidentified Registered Entity.  Docket No. NP11-128-000​

3/18/2011
RR09-7-000, AD10-14-000
Informational Filing in Response to FERC's September 16, 2010 Order Regarding NERC's Three Year Performance Assessment

NERC submits an Informational Filing in Response to FERC's September 16, 2010 Order regarding NERC's Three Year ERO Performance Assessment Report.  The September 16, 2010 Order contained a number of specific directives and other actions that NERC was to address in an informational filing to be submitted within six months.  NERC is commenting on or providing current information concerning its activities with respect to a number of the areas of additional guidance.  Docket Nos. RR09-7-000 and AD10-14-000​

3/16/2011
RM10-11-000
Comments of NERC on November 18, 2010 NOPR on the Integration of Variable Energy Resources

NERS submits comments on the November 18, 2010 Notice of Proposed Rulemaking on the Integration of Variable Energy Resources and FERC's proposal to “reform the pro forma Open Access Transmission Tariff to remove unduly discriminatory practices and to ensure just and reasonable rates for Commission-jurisdictional services.”  Docket No. RM10-11-000​

3/2/2011
RM06-16-000
Fourth Qtr. 2010 Compliance Filing in Response to Para. 629 of Order No. 693 and Request to Terminate Compliance Filing Obligation

NERC submits a Fourth Quarter 2010 Compliance Filing in Response to Paragraph 629 Of Order No. 693 and requests to terminate the compliance filing obligation.  Docket No. RM06-16-000​

2/28/2011
RM10-5-000
Comments in Response to NOPR on Interpretation to Reliability Standard PRC-005-1

NERC submits comments in response to FERC's Notice of Proposed Rulemaking on the proposed interpretation to PRC-005-1.  Docket No. RM10-5-000​

2/25/2011
RM09-9-000
Comments in Response to Notice of Proposed Rulemaking Concerning Regional Reliability Standards for the WECC Region

NERC submits comments in response to  FERC's Notice of Proposed Rulemaking regarding Regional Reliability Standards FAC-501-WECC-1 –Transmission Maintenance; PRC-004-WECC-1 – Protection System and Remedial Action Scheme Misoperation; VAR-002-WECC-1 – Automatic Voltage Regulators, and VAR-501-WECC-1 – Power System Stabilizer (“WECC NOPR”).  Docket No. RM09-9-000​

2/22/2011
RD10-4-000
Compliance Filing in Response to January 6, 2011 Order Approving Reliability Standards Revisions to Withdraw two MISO Waivers

NERC submits a Compliance Filing in Response to FERC's January 6, 2011 Order Approving NERC’s November 20, 2009 Petition for Approval of two Reliability Standards Revisions to Withdraw MISO Waivers.  Docket No RD10-4-000.​

2/22/2011
RM09-13-000
Status Report Regarding BAL-004-1 Time Error Correction Reliability Standard

NERC submits a Status Report Regarding BAL-004-1 Time Error Correction Reliability Standard completing a committment made in a August 20, 2010 Motion to Defer Action.  Docket No RM09-13-000​

2/22/2011
RR10-11-000
Compliance Filing in Response to October 21, 2010 Order

NERC submits a compliance filing including revised pro forma delegation agreement, revised Sections 100-1600 of the ROP, revised Appendix 4A to the ROP and revised Appendix 4C to the ROP.  This filing responds to an October 21, 2010 Order ordering that further revisions be made to the pro forma and individual Delegation Agreements, to certain provisions of the ROP, to the Bylaws of FRCC and MRO, and certain additional explanatory information.  Docket No. RR10-11-000​

2/18/2011
RM10-29-000
Response of NERC to January 28, 2011 Request for Additional Information Regarding Interpretation to TOP-008-1 R8

NERC submits a Response to the Commission's January 28, 2011 Request for Data regarding NERC’s July 16, 2010 petition seeking approval for an interpretation of Requirement R8 of NERC Reliability Standard TOP-001-1 – Reliability Responsibilities and Authorities.  Docket No. RM10-29-000​

2/14/2011
RM11-4-000
Petition for Approval of One Emergency Preparedness and Operations Reliability Standard EOP-008-1 and Retirement of EOP-008-0

NERC files a Petition for Approval of One Emergency Preparedness and Operations Reliability Standard EOP-008-1 and Retirement of One Existing Reliability Standard EOP-008-0.  Docket No. RM11-4-000​

2/11/2011
RM11-11-000
Petition for Approval of Critical Infrastructure Protection (CIP) Reliability Standards Version 4

NERC submits a Petition for Approval of Critical Infrastructure Protection (CIP) Reliability Standards Version 4, associated implementation plans, and VRFs and VSLs.  Docket No. RM11-11-000​

2/10/2011
RM10-8-000
Comments in Response to NOPR on Interpretations to IRO-005-1 and TOP-005-1

NERC submits comments in response to FERC's December 16, 2010 NOPR concerning interpretations to Reliability Standards IRO-005-1 and TOP-005-1.  Docket No. RM10-8-000​

2/7/2011
RR06-1-000, RR09-7-000
Informational Filing of NERC Analysis of NERC Standard Process Results Fourth Quarter 2010

NERC submits an informational filing, Analysis of NERC Standard Process Results Fourth Quarter 2010.  Docket No. RR06-1-000 and RR09-7-000​

1/31/2011
RM08-19-000, RD11-3-000
Petition for Approval of a Facilities Design, Connections, and Maintenance Reliability Standard

NERC submits a Petition for Approval of a Facilities Design, Connections, and Maintenance Reliability Standard FAC-013-2.  Docket Nos. RM08-19-000 and RD11-3-000​

1/28/2011
RM08-19-000
Letter to FERC Regarding WestConnect Utilities Request for Extension of Compliance Date and Request for Expedited Consideration

NERC submits a letter to FERC regarding the December 30th, 2010 Motion filed by WestConnect Utilities requesting and eighteen-month extension of time to become compliant with MOD Reliability Standards approved by the Commission in Order No. 729.  Docket No. RM08-19-000​

1/26/2011
RM10-15-000
Comments in Response to NOPR on Interconnection Reliability Operating Limits Reliability Standards

NERC submits comments in response to FERC's November 18, 2010 NOPR on Mandatory Reliability Standards for Interconnection Reliability Operating Limits.  Docket No. RM10-15-000​

1/24/2011
RM10-16-000
Comments of NERC in Response to NOPR on System Restoration Reliability Standards

NERC submits comments in response to Notice of Proposed Rulemaking on System Restoration Reliability Standards.  Docket No. RM10-16-000​

1/24/2011
RR10-13-002
Petition for Approval of Amendment to the 2011 Business Plan and Budget of Texas Reliability Entity, Inc.

NERC submitted a petition for approval of Amendment to the 2011 Business Plan and Budget of Texas Reliability Entity, Inc. and Amendment to Exhibit E to Delegation Agreement with Texas Reliability Entity, Inc.  Docket No. RR10-13-002​

1/24/2011
RM08-19-000
Comments Regarding the Request for Ext. of Compliance Date and Request for Expedited Consideration of the Westconnect Utilities

NERC files Comments Regarding the Request for Extension of Compliance Date and Request for Expedited Consideration of the Westconnect Utilities. Docket No. RM08-19-000​

1/14/2011
RM06-16-000
Petition for Approval of IRO-006-5 and IRO-006-EAST-1, Glossary Term, and Implementation Plan

NERC files a Petition for Approval of Proposed New Interconnection Reliability Operations and Coordination Reliability Standards, Glossary Term and Implementation Plan for IRO-006-5 and IRO-006-EAST-1.  Docket No. RM06-16-000​

1/13/2011
RM09-19-000
Comments on Notice of Proposed Rulemaking Regarding Regional Reliability Standard IRO-006-WECC-1

NERC submits comments in response to the October 21, 2010 NOPR regarding the Regional Reliability Standard IRO-006-WECC-1.  Docket No. RM09-19-000​

1/11/2011
RR09-6-000
Errata to January 10, 2011 Filing Regarding December 23, 2010 Compliance Filing Regarding Section 300 of NERC's Rules of Procedure

NERC submits an errata to the December 23, 2010 filing concerning Section 300 of NERC's Rules of Procedure.  Docket No. RR09-6-000​

1/11/2011
RR10-7-001, RR10-11-000
Compliance Filing in Response to FERC Orders on CMEP Agreements with SERC, FRCC, and SPP RE

NERC submits a Compliance Filing in Response to the July 12, 2010 and December 1, 2010 Commission Orders Relating to Compliance Monitoring and Enforcement Agreements Between SERC Reliability Corporation and Florida Reliability Coordinating Council and Southwest Power Pool Regional Entity and Related Amendments To Delegation Agreementsl.  Docket Nos. RR10-7-001 and RR10-11-000. ​

1/10/2011
RR09-6-003
Errata Filing to December 23, 2010 Compliance Filing Regarding the Standard Processes Manual

NERC submits an errata to the December 23, 2010 Compliance Filing in Response to the March 18, 2010 Commission Order Directing Revisions to the standards development procedure.  FERC Docket No. RR09-6-003​

1/10/2011
RM10-10-000
Motion to File Reply Comment and Reply Comments Regarding Comments Received on NOPR Regarding BAL-502-RFC-02

NERC submits a Motion for Leave to File Reply Comments and Reply Comments Regarding Comments Received on Notice of Proposed Rulemaking concerning the BAL-502-RFC-02 Reliability Standard.  Docket No. RM10-10-000

1/10/2011
RM08-11-002, RM08-11-003
Compliance Filing in Response to December 7, 2010 Order Approving NERC's May 29, 2010 and July 6, 2010 Compliance Filings

NERC submits a Compliance Filing in Response to December 7, 2010 Order Approving NERC’s May 29, 2010 and July 6, 2010 Compliance Filings in Response to Order No. 722 concerning FAC VSLs.  Docket Nos. Docket Nos. RM08-11-002, RM08-11-003​

1/6/2011
RC11-1-000, RC11-2-000
Release of Harquahala Compliance Protocol document

NERC submits the Harquahala Compliance Protocol document in response to the December 7, 2010 request from Milford Wind Corridor Phase, LLC in Docket Nos. RC11-1-000 and RC11-2-000.​

12/28/2010
RM10-10-000
Comments of NERC in Support of RFC's Comments in Response to NOPR

NERC provides comments in response to FERC's Notice of Proposed Rulemaking regarding the Planning Resource Adequacy Analysis, Assessment, and Documentation Reliability Standard developed by ReliabilityFirst Corporation and filed by NERC for approval. Docket No. RM10-10-000​

12/27/2010
RR09-6-000
Compliance Filing in Response to March 18, 2010 Order Directing Revisions to Standards Development Procedure

The North American Electric Reliability Corporation (“NERC”) submits this filing in compliance with the Commission’s directives in its Order issued March 18, 2010 in this docket.1 In the March 18, 2010 Order, the Commission directed NERC to propose revisions to NERC’s Rules of Procedure (“ROP”) governing its standards development process and to submit those revisions within 90 days.  Docket No. RR09-6-000​

12/23/2010
RR10-1-001
Compliance Filing in Response to October 1, 2010 TFE Order

NERC submitted a compliance filing in response to the October 1, 2010 Order regarding Appendix 4D of the Rules of Procedure.  Docket No. RR10-1-001​

12/23/2010
RR09-7-000, RR10-11-000
Informational Filing regarding Paragraph 773 of Order No. 672

NERC submits an informational filing in response to Paragraph 773 of Order No. 672 regarding the initial three year Regional Entity Audits and the plan for future audits.  Docket No. RR09-7-000 and RR10-11-000​

12/23/2010
RR06-1-022, RR07-7-008
Report of NERC and WECC in response to the August 29, 2009 Order

NERC and WECC submit the “Report of the North American Electric Reliability Corporation and Western Electricity Coordinating Council in Response to August 29, 2009 Commission Order.” Docket Nos. RR06-1-022 and RR07-7-008​

12/23/2010
RR10-13-000
Compliance Filing in Response to October 21, 2010 Order on 2011 Business Plans and Budgets

NERC submits a compliance filing in response to FERC's October 21, 2010 Order on 2011 Business Plans and Budgets.  Docket No. RR10-13-000​

12/17/2010
RM09-19-000
Motion for Extension of Time to Submit Comments

NERC files a motion for extension of time from December 28, 2010 to January 11, 2011 (14 days) to submit comments in response to FERC's October 21, 2010 NOPR on IRO-006-WECC-1.  Docket No. RM09-19-000 ​

12/17/2010
AD11-1-000
Comments following the November 18 Technical Conference

NERC submits its comments following the November 18 Technical Conference.  Docket No. AD11-1-000​

12/9/2010
RC11-1-000
Motion to Intervene and Comments of NERC Regarding the Cedar Creek Compliance Registry Appeal

On October 27, 2010, Cedar Creek Wind Energy, LLC filed an appeal of the October 6, 2010 decision rendered by the NERC Board of Trustees Compliance Committee to include Cedar Creek on the NERC Compliance Registry within the WECC Region for the functions of Transmission Owner and Transmission Operator.  NERC files a motion to intervene and provides comments on the proceeding.  Docket No. RC11-1-000 ​

12/7/2010
RC11-2-000
Motion to Intervene and Comments of NERC Regarding the Milford Wind Corridor Compliance Registry Appeal

On October 27, 2010, Milford Wind Corridor Phase I, LLC filed an appeal of the October 6, 2010 decision rendered by the NERC Board of Trustees Compliance Committee to include Milford on the NERC Compliance Registry within the WECC region for the functions of Transmission Owner and Transmission Operator.  NERC files a motion to intervene and comments on the proceeding.  Docket No. RC11-2-000 ​

12/7/2010
NP11-3-000, NP11-5-000
Response of NERC and SERC to the November 5, 2010 Letter Order Requesting Data and Documents

NERC files a public version of the Response of the North American Electric Reliability Corporation and SERC Reliability Corporation to the November 5, 2010 Letter Order Requesting Data and Documents.  Docket Nos. NP11-3-000 and NP11-5-000​

12/3/2010
NP10-149-000
Supplemental Information on Notice of Penalty for Kiowa Power Partners

NERC and Texas RE submit additional supplemental information from Kiowa regarding Kiowa’s commitment to revise its facility ratings methodology within 90 days.  Docket No. NP10-149-000​

12/2/2010
RM06-16-000
2010/2011 Winter Reliability Assessment

NERC submits its 2010/2011 Winter Reliability Assessment.  Docket No. RM06-16-000​

12/1/2010
RR10-12-000
Compliance Filing in Response to FERC's September 3, 2010 Order Approving Petition and Directing Compliance Filing

NERC Files a Compliance Filing of the North American Electric Reliability Corporation in Response to the Federal Energy Regulatory Commission’s September 3, 2010 Order Approving Petition and Directing Compliance Filing Concerning the NERC Reliability Standards Process Manual.  Docket No. RR10-12-000​

12/1/2010
RM08-19-002
Compliance Filing in Response to Paragraph 274 Of Order No. 729

NERC files a Compliance Filing Of The North American Electric Reliability Corporation In Response To Paragraph 274 Of Order No. 729 - Violation Risk Factors And Violation Severity Levels For Available Transfer Capability Reliability Standards.  Docket No. RM08-19-002​

12/1/2010
RR08-4-006
Compliance Filing of the NERC in Response to the Order on Violation Severity Levels Proposed by the ERO

NERC files a Compliance Filing of the North American Electric Reliability Corporation in Response to the Order on Violation Severity Levels Proposed by the Electric Reliability Organization.  Docket Nos. RR08-4-006​

12/1/2010
NP10-140-000
Response to October 8, 2010 Request for Data and Documents in Pending NOP

NERC and RFC submit a Response to October 8, 2010 Request for Data and Documents. Docket No. NP10-140-000

12/1/2010
RM06-16-000
Third Quarter 2010 Compliance Filing in Response to Order 693

NERC provides a quarterly informational filing regarding the timeframe to restore power to the auxiliary power systems of U.S. nuclear power plants following a blackout as determined during simulations and drills of system restoration plans. This filing contains the referenced material pertaining to the third quarter of 2010. Docket No. RM06-16-000​

11/30/2010
RM08-12-000
Status Report on the Development of the BAL-004-WECC-1 Standard

NERC files a Status Report on the Development of the BAL-004-WECC-1 Standard Automatic Time Error Correction.  Docket No. RM08-12-000​

11/22/2010
NP10-160-000
Joint Motion for Leave to File Answer of NERC and SPP RE and Answer to Comments on U.S. Army Corps of Engineers- Tulsa NOP

NERC files a Joint Motion for Leave to File Answer of the North American Electric Reliability Corporation, Southwest Power Pool Regional Entity and Texas Reliability Entity, Inc. and Answer to Certain Parties’ Comments on NERC Filing Parties’ Answer to the United States Army Corps of Engineers Tulsa District’s Answer to Notices of Penalty.  Docket No. NP10-160-000​

11/17/2010
RR09-6-000
Motion for Ext. of Time to Submit Compliance Filing Regarding NERC's RoP Concerning the Standards Devel. Process

NERC submits a Motion for Extension of Time to Submit Compliance Filing Regarding NERC's Rules of Procedure Concerning the Standards Development Process. Docket No. RR09-6-000​

11/9/2010
NP10-149-000
Response of NERC and TRE to FERC's August 27, 2010 Data and Document Request

NERC submits a response on behalf of NERC and TRE to the Commission's August 27. 2010 Letter Order Requesting Data and Documents concerning the pending Notice of Penalty for Kiowa Power Partners in Docket No. NP10-149-000.​

11/8/2010
RR10-1-001
Request of NERC for Reconsideration, or in the Alternative, Rehearing of October 1, 2010 Order on NERC Rules of Procedure

NERC submits a Request for Reconsideration, or in the Alternative, Rehearing, of Paragraph 26 of October 1, 2010 Commission Order concerning changes to the NERC Rules of Procedure.  Docket No. RR10-1-001​

10/29/2010
NP10-160-000
Joint Answer of NERC, SPP RE, and Texas RE to the U.S. Army Corps of Engineers- Tulsa District Answer to Notices of Penalty

NERC, SPP RE and Texas RE submit this answer to the United States Army Corps of Engineers Tulsa District’s Answer to NERC Omnibus II Notice of Penalty, filed October 13, 20101.  Docket No. NP10-160-000​

10/28/2010
NP10-179-000
Supplemental Information for Notice of Penalty for Minnesota Municipal Power Agency

By this filing, NERC provides a copy of Attachment No. 3 to the Mitigation Plan referenced in the Notice of Penalty for Minnesota Municipal Power Agency.  Docket No. NP10-179-000​

10/27/2010
NP10-168-000
Supplemental Information for Notice of Penalty for NorthWestern Energy

By this filing, NERC is providing a complete electronic copy of the settlement agreement provided in the Notice of Penalty filing for NorthWestern Energy. Docket No. NP10-168-000​

10/27/2010
NP10-171-000
Supplemental Information for Notice of Penalty for Post Oak Wind, LLC

NERC submits supplemental information to correct references to 10 to 20 VAR in the Notice of Penalty filing should be read as 10 to 20 MVAR. By this filing, NERC supplements the record to make this clarification.  Docket No. NP10-171-000​

10/27/2010
RM06-16-000
2010 Special Reliability Assessment: Resource Adequacy Impacts of Potential U.S. Environmental Regulations

NERC submits solely as an informational filing the 2010 Long-Term Reliability Assessment; a report prepared by NERC, released on October 20, 2010.  Docket No. RM06-16-000​

10/26/2010
RM06-16-011
Compliance Filing of NERC in Response to the FERC May 13 Order

Granting Rehearing for Further Consideration and Scheduling Technical Conference

NERC submits this compliance filing in response to the FERC Order Granting Rehearing for Further Consideration and Scheduling Technical Conference issued on May 13, 2010.  Docket No. RM06-16-011

10/25/2010
NP10-140-000
Motion for Extension of Time - NP10-140

NERC submits a Motion for Extension of Time to comply with the October 8, 2010 Data Request. Docket No. NP10-140-000​

10/21/2010
RM06-16-000
2010 Long-Term Reliability Assessment

The North American Electric Reliability Corporation (NERC) submits solely as an informational filing the 2010 Long-Term Reliability Assessment; a report prepared by NERC, released on October 20, 2010. Docket No. RM06-16-000

10/20/2010
RM06-22-000
Status Report of NERC in Response to the FERC March 19, 2009 Order No. 706-B

NERC submits this status report in response to FERC's Order No. 706-B issued on March 19, 2009.  Docket No. RM06-22-000​

10/15/2010
RM06-16-010, RM06-16-011
Comments Following the September 23, 2010 Technical Conference on Frequency Response

NERC submits these comments following the September 23 Frequency Response Technical Conference. NERC will also file, by October 25, 2010, its proposed timeline for development of a Reliability Standard addressing frequency response, as directed by the Commission’s May 13, 2010 Order.  Docket Nos. RM06-16-010, RM06-16-011​

10/14/2010
NP10-160-000
Supplemental Information Regarding Omnibus II

NERC submits supplemental information regarding the Western Electricity Coordinating Council Reliability Coordinator violations that were included in the September 13, 2010 Omnibus II filing under the name of NERC as Compliance Enforcement Authority.  Docket No. NP10-160-000​

10/8/2010
NP10-149-000
Second Motion for Extension of Time to Reply to Data Request in Docket No. NP10-149-000

NERC submits a Motion for an Additional Extension of Time from October 8, 2010 to November 8, 2010, to allow NERC and Texas Reliability Entity, Inc. to submit the response to FERC’s August 27, 2010 Request for Data and Documents.  Docket No. NP10-149-000​

10/6/2010
NP10-20-000
Order on Notice of Penalty - September 30, 2010

The Commission issued an Order stating that it would not further review, on its own motion, the December 30, 2009 Notice of Penalty regarding Duke Energy Corporation. Docket No. NP10-20-000​

9/30/2010
RR010-6 -000
Reconciliation Report in Accordance with Petition for Approval of Delegation Agreement and Business Plan and Budget for Texas RE

NERC  submits the “Reconciliation Report Submitted in Accordance with Petition for Approval of Delegation Agreement with Texas Reliability Entity, Inc. and 2010 Business Plan and Budget of Texas Reliability Entity, Inc.”  This filing is being submitted in accordance with NERC’s February 9, 2010 “Petition for Approval of Delegation Agreement with Texas Reliability Entity, Inc. and
2010 Business Plan and Budget of Texas Reliability Entity, Inc.”  Docket No. RR010-6 -000​

9/24/2010
NP10-149-000
Motion for an Extension of Time to Answer FERC's August 7, 2010 Data Request

NERC hereby submits a Motion for an Extension of Time from September 17, 2010 to October 8, 2010, to allow NERC and Texas Reliability Entity, Inc. to submit the response to FERC’s August 27, 2010 Request for Data and Documents.  Docket No. NP10-149-000​

9/16/2010
RM06-22-014
Compliance Filing and Petition for Approval of Implementation Plans for V2 and V3 CIP Standards

NERC submits a Compliance Filing and Petition for Approval of Implementation Plans for Generator Owners and Generator Operators of nuclear power plants in the United States for Versions 2 and 3 of the Critical Infrastructure Protection Reliability Standards, designated as CIP-002-2 through CIP-009-2 and CIP-002-3 through CIP-009-3.  Docket No. RM06-22-014​

9/9/2010
RD10-15-000
Petition for Approval of Proposed Modifications to six Reliability Standards

NERC submits a petition seeking approval of proposed modifications contained in six Reliability Standards (BAL-002-1 Disturbance Control Performance; EOP-002-3 Capacity and Energy Emergencies; FAC-002-1 Coordination of Plans for New Generation, Transmission, and End-User Facilities; MOD-021-2 Documentation of the Accounting Methodology for the Effects of Demand-Side Management in Demand and  Energy Forecasts; PRC-004-2 Analysis and Mitigation of Transmission and Generation  Protection System Misoperations; and VAR-001-2 Voltage and Reactive Control).  Docket No. RD10-15-000​

9/9/2010
NP10-141-000
Response of NERC and WECC to FERC's Request for Data and Documents in Pending NOP for LADWP

NERC and WECC submit a response to FERC's August 5, 2010 Request for Data and Documents  in the above captioned proceeding, regarding the NERC July 6, 2010 Notice of Penalty filing regarding Los Angeles Department of Water and Power (“LADWP”) within the WECC Region.  Docket No. NP10-141-000​

9/8/2010
NP10-140-000
Response to Request for Data and Documents in Pending NOP in RFC Region

NERC submit a response to the FERC's August 5, 2010 Request for Data and Documents regarding NERC’s July 6, 2010 Notice of Penalty in the referenced docket.  Docket No. NP10-140-000​

9/8/2010
RD10-14-001
Second Quarter 2010 Compliance Filing in Response to Order 693

NERC provides a quarterly informational filing regarding the timeframe to restore power to the auxiliary power systems of U.S. nuclear power plants following a blackout as determined during simulations and drills of system restoration plans. This filing contains the referenced material pertaining to the second quarter of 2010. Docket No. RD10-14-001​

8/31/2010
NP10-149-000
Supplemental Information for Pending Notice of Penalty for Kiowa Power Partners

NERC submits additional information for pending Notice of Penalty for Kiowa Power Partners, LLC.  Docket No. NP10-149-000​

8/25/2010
RR10-13-000
Request for Acceptance of 2011 Business Plan and Budgets and Proposed Assessments to Fund Budgets

NERC submits a Request for Acceptance of 2011 Business Plan and Budgets of NERC and Regional Entities and for Approval of Proposed Amendments to Fund the 2011 Budgets.  Docket No. RR10-13-000

8/24/2010
RM09-25-000
Comments in Response to NOPR on Two System Personnel Training Reliability Standards

NERC submits comments regarding the NOPR on PER-004-2 and PER-005-1.  Docket No. RM09-25-000​

8/23/2010
NP10-143-000
Supplemental Information Regarding Pending City of Tallahassee NOP

NERC provides supplemental information for pending City of Tallahassee Notice of Penalty in Docket No. NP10-143-000​

8/23/2010
RM09-13-000
Motion to Defer Action on Time Error Correction

NERC submits a motion to defer action on Time Error Correction Reliability Standard BAL-004-1.  Docket No. RM09-13-000​

8/20/2010
AD10-14-000
Supplemental Comments Following July 6 Technical Conference

NERC submits these supplemental comments following the July 6, 2010 technical conference. NERC filed comments on July 26, 2010 that responded to a number of issues raised during the July 6 technical conference. These supplemental comments provide NERC’s views after the conclusion of those discussions.  Docket No. AD10-14-000​

8/20/2010
NP10-140-000, NP10-141-000
Motion for Extension of Time to Response to FERC's August 5, 2010 Data Request

NERC submits a Motion for an Extension of Time from August 19, 2010 to September 8, 2010, to allow NERC, WECC and RFC to submit the responses to FERC’s August 5, 2010 Requests for Data and Documents.  Docket Nos. NP10-140-000 and NP10-141-000​

8/18/2010
RR10-7-000
Motion for Modification of Date for Compliance FIling to July 12 Order

NERC submits a motion for modification of date for Compliance Filing to July 12, 2010 Commission Order.  Docket No. RR10-7-000​

8/6/2010
RR10-7-000
Request of NERC, SERC, FRCC and SPP RE for Reconsideration, or in the Alternative Rehearing of P25 of the July 12 Order

NERC, SERC, FRCC and SPP RE request reconsideration, or in the alternative rehearing, of Paragraph 25 of July 12, 2010 Commission Order.  Docket No. RR10-7-000​

8/6/2010
RM06-16-000
Informational Filing of the Special Reliability Scenario Assessment Report:

Potential Reliability Impacts of Swift Demand Growth after a Long-Term Recession

NERC submits as an informational filing the Special Reliability Scenario Assessment Report: Potential Reliability Impacts of Swift Demand Growth after a Long-Term Recession.  Docket RM06-16-000
8/2/2010
RM06-16-000
Informational Filing of the Reliability Impacts of Climate Change Initiatives: Technology Assessment and Scenario Development

NERC submits an information filing of the Reliability Impacts of Climate Change Initiatives: Technology Assessment and Scenario Development.  Docket No. RM06-16-000

7/27/2010
NP10-119-000
Supplemental Information Regarding Pending Notice of Penalty for Citizens Electric Corporation

NERC and SERC Reliability Corporation provide supplemental information to the Notice of Penalty submitted in Docket No. NP10-119-000.​

7/27/2010
AD10-14-000
Comments following the July 6 Technical Conference

NERC submits comments following the July 6, 2010 Technical Conference.  Docket No. AD10-14-000​

7/26/2010
RR10-11-000
Motion to Answer and Comments in response to Comments filed on NERC's June 9 Petition

NERC submits a motion to answer the comments filed in response to NERC's Petition for Approval of Revised Pro Forma Delegation Agreement, Revised Delegation Agreements with the Eight Regional Entities, and Amendments to the NERC Rules of Procedure filed on June 9, 2010 and amended on June 17, 2010.  Docket No. RR10-11-000​

7/26/2010
NP10-133
NERC submits an errata filing regarding the July 6, 2010 Notice of Penalty in Docket No. NP10-133

NERC submits an errata filing to the July 6, 2010 Notice of Penalty regarding Hermiston Co., L.P. Docket No. NP10-133-000​

7/23/2010
NP10-140-000
Supplemental Information Regarding Pending NOP in Docket NP10-140-000

NERC submits supplemental information regarding Notice of Penalty in FERC Docket No. NP10-140-000​

7/19/2010
RM08-13-000
Compliance Filing in Response to FERC's March 18, 2010 Order No. 733 Approving PRC-023-1

NERC submits this compliance filing in response to FERC Order No. 733 issued March 18, 2010 approving Reliability Standard PRC-023-1 – Transmission Relay Loadability.  Docket Nos. RM08-13-000​

7/16/2010
RM10-29-000
Petition for Approval of Interpretation of Reliability Standard TOP-001-1

NERC submits this petition seeking approval for an interpretation of Requirement R8 in FERC-approved NERC Reliability Standard TOP-001-1 — Reliability Responsibilities and Authorities.  Docket No. RM10-29-000​

7/16/2010
RR06-1-024, RR07-8-004, RR07-8-005
Compliance Filing of NERC and FRCC in Response to FERC's December 19, 2008 Order

FRCC and NERC submit this compliance filing to respond to the December 19, 2008 Order which directed NERC and FRCC to submit a filing regarding FRCC’s use of the compliance committee review process.  Docket Nos. RR06-1-024, RR07-8-004, RR07-8-005​

6/30/2010
RR06-1-025, RR07-3-004, RR07-3-005
Compliance Filing of NERC and NPCC in Response to FERC's December 19th, 2008 Order

NERC and NPCC submit this compliance filing responding to the December 19, 2008 Order that directed NERC and NPCC to submit a filing regarding NPCC’s use of technical committee consultations.  Docket Nos. RR06-1-025, RR07-3-004, RR07-3-005​

6/30/2010
NP10-115-000
Supplemental Information Regarding June 2 NOP for Northern Indiana Public Service Company

NERC submits supplemental information for the June 2, 2010 Notice of Penalty regarding Northern Indiana Public Service Company.  Docket No. NP10-115-000​

6/25/2010
NP10-110
Eratta Filing Regarding Notice of Penalty NP10-110-000

NERC submits an Eratta Filing regarding the June 2, 2010 Notice of Penalty for Platte River Power Authority.  Docket No. NP10-110.​

6/21/2010
RR10-11-000
Supplemental Filing to June 9, 2010 Petition for Approval of Revised Delegation Agreements and Amendments to the NERC ROP

NERC submits a supplemental filing to its June 9, 2010 Petition for Approval of Revised Pro Forma Delegation Agreement, Revised Delegation Agreements with the Eight Regional Entities, and Amendments to the NERC Rules of Procedure.  Docket No. RR10-11-000​

6/17/2010
PL10-4-000
Comments Regarding the Proposed Policy Statement on Penalty Guidelines

NERC submits comments regarding FERC's March 18, 2010 Policy Statement on Penalty Guidelines.  Docket No. PL10-4-000

6/14/2010
RR10-12-000
Petition for Approval of the Reliability Standards Processes Manual Incorporating Proposed Revisions to the RSDP

NERC requests FERC's approval to replace in the Version 7 of the RSDP, currently  included as Appendix 3A of the NERC ROP.  The Standard Processes Manual proposed for approval incorporates process amendments, edits, and a clarifying document name change to the
NERC RSDP – Version 7.  Docket No. RR10-12-000​

6/10/2010
RR010-11-000
Petition for Approval of Revised Pro Forma Delegation Agreement, Revised Delegation Agreement with Eight Regional Entities

NERC submits this Petition for Approval of Revised Pro Forma Delegation Agreement, Revised Delegation Agreements  with the Eight Regional Entities, and Amendments to the NERC Rules of Procedure. The Petition also requests approval of amendments to the Bylaws of several of the Regional Entities. Docket No. RR010-11-000​

6/9/2010
RM06-16-000
First Quarter 2010 Compliance Filing in Response to Order No. 693

NERC submits a quarterly informational filing regarding the timeframe to restore power to the auxiliary power systems of U.S. nuclear power plants following a blackout as determined during simulations and drills of system restoration plans. This filing includes information from 4th Quarter 2009. Docket No. RM06-16-000​

6/1/2010
RR08-6-000
NERC Report of Comparison of Budgeted to Actual Costs for 2009 for NERC and Regional Entities

NERC submits a true-up filing to compare actual and budgeted costs for NERC and Regional Entities for 2009.  Docket No. RR08-6-000​

6/1/2010
RM09-15-000
Comments in Response to the March 18, 2010 BAL-002-WECC-01 NOPR

NERC submits comments in response to the Commission's March 18, 2010 NOPR regarding the BAL-002-WECC-01 Regional Reliability Standard.  Docket No. RM09-15-000​

5/24/2010
NP10-100-000
Supplemental Information Regarding Pending Notice of Penalty for Tri-State Generation and Transmission Association, Inc. - Marketing

NERC files supplemental information regarding the pending NOp for Tri-State Generation and Transmission Association, Inc. - Marketing. Docket No. NP10-100-000​

5/19/2010
NP10-100-000
Second Supplemental Filing Regarding Pending NOP for Tri-State Generation and Transmission Association, Inc. - Marketing

NERC submits a second supplemental filing regarding the pending Notice of Penalty for Tri-State Generation and Transmission Association, Inc. - Marketing.  Docket No. NP10-100-000​

5/18/2010
RM06-22-008
Compliance Filing in Response to the March 18, 2010 Order on VSL Assignments for CIP Standards

NERC submits a compliance filing with revisions to 57 sets of Violation Severity Level assignments for Version 1 of the Critical Infrastructure Protection Reliability Standards. Docket No. RM06-22-008​

5/17/2010
RR09-7-000
Motion Requesting Issuance of Preliminary Assessment in Response to Three-Year ERO Performance Assessment

NERC requests that the Commission have its staff issue a preliminary assessment of the ERO Performance Report for comment.  Docket No. RR09-7-000​

5/13/2010
RR10-9-000
Supplemental Information for Petition for Approval of WECC's Amended 2010 Business Plan and Budget

NERC submits a Supplemental Filing and Request to Submit Corrected Attachments 3 and 4 to the Petition of the North American Electric Reliability Corporation for Approval of Amended 2010 Business Plan and Budget of the Western Electricity Coordinating Council and Amendment to Exhibit E to Delegation Agreement with the Western Electricity Coordinating Council. Docket No. RR10-9-000​

5/11/2010
RM09-18-000
Comments in Response to NOPR on the Revision to the ERO Definition of the Bulk Electric System

NERC provides comments on the March 18, 2010 Notice of Proposed Rulemaking on the Revision to the Bulk Electric System definition. Docket No. RM09-18-000​

5/10/2010
RM06-16-000, RM10-6-000
Comments on Interpretation of Reliability Standard TPL-002-0

NERC submits comments on the interpretation of a Transmission Planning and Reliability Standard TPL-002-0.  Docket Nos. RM06-16-000 and RM10-6-000​

5/10/2010
RR08-4-000, RR08-4-001, RR08-4-002
Supplemental Information Regarding the March 5, 2010 Filing on Violation Severity Levels

NERC submits a letter incorporating by reference the informational filing it submitted on August 10, 2009 with the March 5, 2010 “Compliance Filing of the North American Electric Reliability Corporation in Response to the Order on Violation Severity Levels Proposed by the Electric Reliability Organization and Request for an Extension of Time”. Docket Nos. RR08-4-000, RR08-4-001 and RR08-4-002​

5/5/2010
RR09-9-000, RR07-14-004, RR08-6-004
Further Report of NERC in Response to October 15, 2009 Order on Business Plan and Budgets

NERC submits a further report in response to P 36 of the Commission’s Order issued October 15, 2009 in these dockets on the NERC and Regional Entity 2010 Business Plans and Budgets.  Docket Nos. RR09-9-000, RR07-14-004 and RR08-6-004​

5/3/2010
RM09-13-000
Comments in Response to NOPR on Time Error Correction Standard BAL-004-1

NERC submits comments in Response to the Notice of Proposed Rule-making for the Time Error Correction Reliability Standard BAL-004-1. Docket No. RM09-13-000​

4/28/2010
RR09-9-000, RR08-6-004, RR07-14-004, RR10-9-000
Petition for Approval of Amended 2010 Business Plan and Budget for WECC and Amendment to WECC Delegation Agreement

NERC sumits a Petition for Approval of Amended 2010 Business Plan and Budget of the WECC and Amendment to Exhibit E to Delegation Agreement to WECC in compliance with FERC's October 15, 2009 Order on Business Plans and Budgets. Docket Nos. RR09-9-000, RR08-6-004, RR07-14-004, and RR10-9-000​

4/22/2010
RR10-1-000
Compliance Filing in Response to FERC's January 21, 2010 Order Concering Appendix 4D to the NERC ROP

NERC submits this Compliance Filing in response to the January 21, 2010 Commission Order Concerning Appendix 4D to the NERC Rules of Procedure – Procedure for Requesting and Receiving Technical Feasibility Exceptions to NERC Critical Infrastructure Protection Standards.”  Docket No. RR10-1-000​

4/21/2010
RD10-12-000
Petition for Approval of Interpretation and a Requirement for CIP-005-2

NERC seeks approval for interpretation of Section 4.2.2 (“Applicability”) and Requirement R1.3 in FERC-approved NERC Reliability Standard CIP-005-2 — Cyber Security — Electronic Security Perimeter(s).  Docket No. RD10-12-000​

4/21/2010
RD10-11-000
Petition for Approval of Interpretation to CIP-001-1

NERC seeks approval of an interpretation of Requirement R2 in FERC-approved NERC Reliability Standard CIP-001-1 — Sabotage Reporting, Requirement R2.  Docket No. RD10-11-000​

4/21/2010
NP10-20-000
Supplemental Filing Regarding Pending Duke NOP

NERC submits a filing with supplemental information regarding the pending Duke Energy Corporation NOP in Docket No. NP10-20-000.​

4/21/2010
RM06-16-009, RM06-16-012
Errata- April 19, 2010 Request of NERC for Rehearing and Motion for Stay in the Order Setting Deadline for Compliance

NERC submits an errata to the April 19, 2010 Request for Rehearing and Motion for Stay in the Order Setting Deadline for Compliance.  Docket Nos. RM06-16-009 and RM06-16-012​

4/20/2010
RD10-13-000
Petition for Approval of Interpretation to Reliability Standard CIP-006-2

NERC submits a petition seeking approval for an interpretation of Requirement R1.1 in FERC-approved NERC Reliability Standard CIP-006-2 — Cyber Security — Physical Security of Critical Cyber Assets. Docket No. RD10-13-000​

4/20/2010
RM08-13-000
Compliance Filing in Response to Order No. 733- Revisd VRFs and VSLs for PRC-023-1

NERC submits revisions to one Violation Risk Factor (“VRF”), and the three Violation Severity Levels (“VSLs”) with respect to the Transmission Relay Loadability Reliability Standard (PRC-023-1) in Compliance with Order No. 733.  Docket No. RM08-13-000​

4/19/2010
RM06-16-011
Request for Clarification and Rehearing of the Order Setting Deadline for Compliance for BAL-003-0

NERC requests clarification and rehearing of the Commission’s March 18, 2010 Order Setting Deadline for Compliance.  Docket No. RM06-16-011​

4/19/2010
RM08-13-001
Request for Clarification or Rehearing of Order No. 733

NERC seeks clarification and, in the alternative, requests rehearing of the Commission’s Order No. 733 issued on March 18, 2010.  Docket No. RM08-13-001​

4/19/2010
RM06-16-012
Request for Rehearing and Motion for Stay in the Order Setting Deadline for Compliance

NERC submits a Request for Rehearing and submits a Motion for Stay of the Commission’s March 18, 2010 Order Setting Deadline for Compliance.  Docket No. RM06-16-012​

4/19/2010
RR09-6-000
Request for Rehearing and Reconsideration, Motion for Stay, and Request for Public Conference

NERC requests rehearing of FERC's March 18, 2010 Order Directing NERC to propose modification to the Reliability Standards Development Process in the NERC ROP, requests that the Commission reconsider one aspect of the March 18 RSDP Order, and that FERC convene a public conference to consider the issues raised in this case.  Docket No. RR09-6-000​

4/19/2010
RR10-7-000
Response of NERC in Docket No. RR10-7-000

NERC submits a Response to a Motion to Intervene and Protest.  Docket No. RR10-7-000​

4/16/2010
RM10-11-000
Comments in Response to FERC's January 21, 2010 NOI on the Integration of Variable Energy Resources

NERC submits comments in response to FERC's January 20, 2010 NIO on the Integration of Variable Energy Resources.  Docket No. RM10-11-000​

4/12/2010
NP10-89-000
Supplemental Information Regarding Pending NOP for Ebensburg Power Company

NERC submits additional information regarding pending Notice of Penalty for Ebensburg Power Company in Docket No. NP10-89-000.​

4/12/2010
RR10-6-000
Supplemental Information Regarding Separation Filing Regarding Texas RE, Inc.

NERC submits additional information regarding the Separation Filing of Texas Reliability Entity, Inc.,  Docket No. RR10-6-000​

4/12/2010
NP10-86-000
Errata to Notice of Penalty NP10-86-000

NERC submits an errata to a Notice of Penalty in Docket No. NP10-86-000.​

4/9/2010
RM10-9-000
Comments in Response to Notice of Inquiry Regarding Reliability Standard IRO-006-4 and Curtailment Priorities

NERC submits comments on the interplay between Reliability Standard IRO-006-4 (Reliability Coordination – Transmission Loading Relief (“TLR”)) and Curtailment Priorities set forth in the Commission’s pro forma open access transmission tariff (“OATT”).  Docket No. RM10-9-000​

3/29/2010
NP10-18-000
Response of NERC and WECC to the February 26, 2010 FERC Order Initiating Review of Notice of Penalty

NERC and WECC file these comments in response to the FERC Order Initiating Review of Notice of Penalty, issued on February 26, 2010, regarding the Turlock Irrigation District.  Docket No. NP10-18-000​

3/18/2010
RR10-8-000
Errata to Petition for Approval of Amendments to the NERC ROP Regarding the CCC Program and Charter

NERC submits an errata for Attachment 1 of the refereced petiton. Docket No. RR10-8-000​

3/16/2010
RR10-8-000
Petition for Approval of Amendments to the NERC ROP Regarding the CCC Program and Charter

NERC submits a petition requesting approval of several amendments and additions to the NERC Rules of Procedure to reflect changes to the Compliance and Certification Committee (“CCC”) program documents that currently are or will be included in NERC’s Rules of Procedure.  Docket No. RR10-8-000​

3/15/2010
NP10-60-000
Errata to Notice of Penalty NP10-60-000

NERC submits errata to a Notice of Penality in Docket No. NP10-60-000.​

3/12/2010
RR010-7 -000
Petition for Approval of Agreements between SERC, FRCC, and SPP RE to act as CEA and Related Amendments to Delegation Agreements

NERC submits a petition asking for approval for agreements that outline SERC becoming the Compliance Enforcement Authority with respect to registered entity functions performed (i) by Florida Reliability Coordinating Council and (ii) by SPP, Inc. within the SPP region.  Docket No. RR010-7 -000​

3/10/2010
RR08-4-000, RR08-4-001, RR08-4-002, RR08-4-005
Compliance Filing in Response to the Order on VSL Proposed by the ERO and a Request for an Extension of Time

NERC submits this compliance filing regarding Violation Severity Levels (VSLs) proposed for FERC-approved Reliability Standards following FERC issued Guidelines.  Docket Nos. RR08-4-000, RR08-4-001, RR08-4-002, and RR08-4-005​

3/5/2010
RM06-16-000
Fourth Qtr. 2009 Compliance Filing in Response to Order No. 693

NERC submits a quarterly informational filing regarding the timeframe to restore power to the auxiliary power systems of U.S. nuclear power plants following a blackout as determined during simulations and drills of system restoration plans.  This filing includes information from 4th Quarter 2009.  Docket No. RM06-16-000​

3/1/2010
RR08-4-000, RR08-4-001, RR08-4-002
Motion for a Brief Extension of Time to respond to FERC's June 19 2008 Order and November 20, 2008 Order

NERC submits a submits a Motion for a Brief Extension of Time from March 1, 2010 to March 5, 2010, to allow it to submit a compliance filing in response to FERC’s June 19, 2008 Order and November 20, 2008 Order.  Docket Nos. RR08-4-000, RR08-4-001, RR08-4-002​

2/26/2010
NP10-40-000
Supplemental Information Regarding Pending FEUS NOP

NERC and WECC submit a filing containing supplemental information regarding the pending Farmington Electric Utility System (FEUS) NOP. Docket No. NP10-40-000​

2/26/2010
NP10-37-000
Supplemental Information Regarding Pending NOP for Puget Sound Energy, Inc.

NERC and the WECC provide information regarding the risk impact of the violations addressed in support of the pending Notice of Penalty.  Docket No. NP10-37-000​

2/25/2010
NP10-48-000
Supplemental Information Regarding Pending NYSEG NOP

NERC provides information regarding the risk impact of the violations addressed in support of the pending Notice of Penalty.  Docket No. NP10-48-000​

2/25/2010
NP10-18-000
Supplemental Informational Filing Regarding the Pending Notice of Penalty for TID

NERC and WECC provide follow-up information on the November 13, 2009, Notice of Penalty regarding Turlock Irrigation District (TID). Docket No. NP10-18-000​

2/24/2010
RR010-6-000
Petition for Approval of Delegation Agreements of Texas RE and the 2010 Business Plan and Budget of Texas Reliability Entity, Inc.

NERC submits a petition seeking the necessary approvals from the Commission to delegate authority to Texas Reliability, Inc. as the Regional Entity for the ERCOT Region, as successor to Texas Regional Entity, a division of Electric Reliability Council of Texas, Inc. Docket No. RR010-6-000​

2/19/2010
NP10-20-000
Response of NERC and RFC to the January 29 Letter Order Requesting Data and Documents

NERC and RFC submit this Response to the FERC January 29, 2010 Request for Data and Documents. Docket No. NP10-20-000​

2/16/2010
NP10-25-000
Response of NERC and WECC to the January 29 Letter Order Requesting Data and Documents

NERC and WECC submit this Response to the FERC January 29, 2010 Request for Data and Documents.  Docket No. NP10-25-000​

2/16/2010
ER08-1281-004
Motion to Intervene in NYISO Report on Broader Regional Markets

NERC motions to intervene in the proceeding of the NYISO Report on Broader Regional Markets; Long-Term Solutions to Lake Erie Loop Flow, filed with the Commission on January 12, 2010.  The report includes proposed regional market solutions predicated on NERC actions.  Docket No. ER08-1281-004.​

2/2/2010
RR06-1-000
Quarterly Report Regarding Analysis of Reliability Standard Voting Results October - December 2009

NERC submits its fourth quarter 2009 report on the analysis of voting results for Reliability Standards. This filing is submitted in response to the FERC's January 18, 2007 Order that requires NERC to closely monitor and report to FERC the voting results for NERC Reliability Standards each quarter for three years.  Docket No. RR06-1-000​

1/29/2010
RR08-4-000, RR08-4-001, RR08-4-002
Motion for a Brief Extension of Time

NERC submits a Motion for a Brief Extension of Time from March 1, 2010 to March 5, 2010, to allow it to submit a compliance filing in response to FERC’s June 19, 2008 Order and November 20, 2008 Order.  Docket Nos. RR08-4-000, RR08-4-001, RR08-4-002​

1/26/2010
NP10-18-000
Response of NERC and WECC to January 11, 2010 FERC Letter Order Requesting Data and Documents.

NERC and WECC submit this response to the FERC January 11, 2010 Request for Data and Documents regarding NERC's November 13, 2009 Notice of Penalty filing regarding Turlock Irrigation District (“Turlock”) in the WECC Region.  Docket No. NP10-18-000​

1/26/2010
RM06-22-011
Compliance Filing in Response to December 17, 2009 FERC Order Regarding Scope of Systems

NERC submits this compliance filing in response to the December 17, 2009 Order requiring NERC to submit additional information that will allow FERC to evaluate its  approval of NERC’s CIP Version 1 Implementation Plan for nuclear power plant GOs and GOPs.  FERC also directed NERC to incorporate into the Implementation Plan the implementation of Version 2 of the CIP standards by nuclear power plants on the same schedule established for Version 1.  Docket No. RM06-22-011.​

1/19/2010
RR09-9-002, RR07-14-006, RR08-6-006
Partial Compliance Filing of NERC in Response to October 2009 Order on 2010 Business Plan and Budgets

NERC submits a partial compliance filing in response to Paragraph 36 of the October 15, 2009 Order on 2010 Business Plans and Budgets. Docket Nos. RR09-9-002, RR07-14-006 and RR08-6-006​

1/11/2010
RM10-15-000
Petition for Approval of Proposed New and Revised IROL, EOP and TOP Reliability Standards

Petition of NERC for Approval of Proposed New and Revised Reliability Standards for Operating Within Interconnection Operating Limits, as well as revised Reliability Standards EOP-001-1, IRO-002-2, IRO-004-2, IRO-005-3, TOP-003-1, TOP-005-2 and TOP-006-2. Docket No. RM10-15-000​

12/31/2009
RM10-16-000
Petition for Approval of Three EOP Reliability Standards, One Glossary Term, and Retirement of Five EOP Reliability Standards

Petition of NERC for Approval of Three Emergency Preparedness and Operations Reliability Standards and One New Glossary Term and for Retirement of Five Existing Reliability Standards and One Glossary Term. Docket No. RM10-16-000​

12/31/2009
RD09-7-002
Compliance Filing in Response to the September 30, 2009 Order

NERC submits a compliance filing in response to the Commission's September 30, 2009 Order Approving Revised Reliability Standards for Critical Infrastructure Protection.  The filing includes: (1) request for approval of Version 3 of the CIP Reliability Standards; (2) revised Implementation Plan for Newly Identified Critical Cyber Assets and Newly Registered Entities and the Implementation Plan for Version 3 of the Cyber Security Standards CIP-002-3 through CIP-009-3 that addresses FERC's directives in the Version 2 CIP Order; and (3) an update of the timetable that reflects the plan to address the remaining FERC directives from Order No. 706.  Docket No. RD09-7-002​

12/29/2009
RM06-16-000, RD10-8-000
Petition for Approval of Interpretations to Reliability Standard CIP-006-2

NERC submits a Petition for Approval of Interpretations to Reliability Standard CIP-006-2 — Physical Security of Critical Cyber Assets, Requirements R1.1 and R4. Docket Nos. RM06-16-000 and RD10-8-000​

12/22/2009
RM08-19-002, RM09-5-002, RM06-16-008
Request for Clarification of Order No. 729

NERC requests clarification of the Commission’s November 24, 2009 Order No. 729 which approved modifications to six Modeling, Data, and Analysis (MOD) Reliability Standards and directed that modifications be made to the MOD Reliability Standards to make the processes to calculate available transfer capability and its various components more transparent.   Docket Nos. RM08-19-002, RM09-5-002, and RM06-16-008.​

12/22/2009
RD10-7-000, RM08-3-000
Compliance Filing in Response to FERC Order 716- Revised VRFs

NERC submits this filing in compliance with paragraphs 143, 156, 164, 168, 173, 179 and 187 of the FERC Order No. 716 that required NERC to revise VRFs for the NUC-001-1 — Nuclear Plant Interface Coordination Reliability Standard, Requirements R2 (from Lower to Medium), R4, R5, R7, and R8 (Medium to High), and R9 (Lower to Medium). Docket No. RD10-7-000, RM08-3-000​

12/18/2009
RD10-6-000
Petition for Approval of VSLs and VRFs to CIP Version 2 Reliability Standards

NERC submits a petition seeking approval of Violation Severity Level (“VSL”) assignments for approved Reliability Standards: CIP-002-2, CIP-003-2, CIP-004-2, CIP-005-2, CIP-006-2, CIP-007-2, CIP- 008-2, and CIP-009-2, and for Violation Risk Factors (“VRFs”) for CIP-003-2 and CIP- 006-2. Docket Nos. RD10-6-000​

12/18/2009
RM10-10-000
Petition for Approval of Reliability Standard BAL-502-RFC-02

NERC submits a petition seeking approval of proposed Regional Reliability Standard BAL-502-RFC-02 — Planning Resource Adequacy Analysis, Assessment and Documentation, and four associated new definitions.  Docket No. RM10-10-000​

12/14/2009
RR08-6-005, RR07-14-005, RR09-9-001
Compliance Filing in Response to October 15, 2009 Order on the 2010 Business Plan and Budget

NERC files a compliance filing in response to FERC's October 15, 2009 Order on 2010 Business Plans and Budget.  Docket Nos. RR08-6-005, RR07-14-005, RR09-9-001​

12/11/2009
AD09-10-000
Comments in Response to the FERC's October 28, 2009 Draft on the Possible Elements of a National Action Plan on Demand Response

NERC comments in response to the FERC October 28, 2009 document entitled Possible Elements of a National Action Plan on Demand Response, Discussion Draft.  Docket No. AD09-10-000​

12/4/2009
RM05-17-000, RM05-25-000, RM06-16-000
Informational Filing of 2010 Development Plan Pursuant to Section 310 of The NERC Rules of Procedure

NERC submits for informational purposes its revised Reliability Standards Development Plan in accordance with Section 310 of the NERC Rules of Procedure. Docket Nos. RM05-17-000, RM05-25-000, RM06-16-000​

12/2/2009
RD10-5-000
Petition for Approval of Interpretations to Reliability Standards MOD-001-1 and MOD-029-1

NERC seeks approval for interpretations of Requirements R2 and R8 in FERC-approved NERC
Reliability Standard MOD-001-1 — Available Transmission System Capability, and Requirements R5 and R6 in FERC-approved Reliability Standard MOD-029-1 — Rated  System Path Methodology. Docket No. RD10-5-000​

12/2/2009
RR09-4-001
Compliance Filing of NERC and SPP in Response to September 17, 2009 Order

NERC submits the "Compliance Filing of the North American Electric Reliability Corporation and Southwest Power Pool, Inc. to September 17, 2009 Commission Order.” Docket No. RR09-4-001​

12/1/2009
RR10-5-000
Petition for Approval of Proposed Revisions to SPP Bylaws

NERC submits a petition for approval of proposed revisions to the Bylaws of Southwest Power Pool, Inc.” This petition seeks approval of proposed amendments to Section 9.7.1 of the Bylaws of Southwest Power Pool, Inc., as “Regional Entity Rules.” Docket No. RR10-5-000​

12/1/2009
RM06-16-000
Third Quarter 2009 Compliance Filing in Response to Order No. 693

NERC submits a Third Quarter 2009 Compliance Filing in response to Paragraph 629 of Order No. 693. Docket No. RM06-16-000​

11/30/2009
RM10-8-000
Petition for Approval of Interpretations for TOP-005-1.1 and IRO-005-2

NERC submits a petition seeking approval for interpretations of Requirement R3 in FERC-approved NERC Reliability Standard TOP-005-1.1 — Operational Reliability Information, and Requirement R12 of FERC-approved NERC Reliability Standard IRO-005-2 — Reliability Coordination - Current Day Operations.  Docket No. RM10-8-000​

11/24/2009
RR10-4-000
Petition for Approval of Amendments to ROP, Appendix 3A, RSDP

NERC requests FERC approval of amendments to Appendix 3A, Reliability Standards Development Procedure (“RSDP”) to NERC’s Rules of Procedure (“ROP”).  Docket No. RR10-4-000​

11/23/2009
RR09-9-000, RR08-6-004, RR07-14-004
Informational Filing on SAFNR Project

NERC submits an Informational Filing in compliance with Paragraph 64 of FERC's October 15, 2009 Order.  Paragraph 64 directed NERC to submit, by November 20, 2009, an “informational report . . . include[ing] a discussion about the ongoing and future plans to develop the SAFNR project and identify[ing] the resources that will be required to meet NERC and regional objectives.  Docket Nos. RR09-9-000, RR08-6-004, RR07-14-004​

11/20/2009
RD10-9-000
Petition for Approval of Corrected Reliability Standard FAC-010-2

NERC submits a petition of approval of an errata to correct two misnumbered requirements referenced in the WECC Regional Differences portion of the NERC Reliability Standard FAC-010-2 — System Operating Limits Methodology for the Planning Horizon.  Docket No. RD10-9-000​

11/20/2009
RD10-4-000
Petition for Approval of Two Reliability Standard Revisions to Withdraw MISO Waivers

NERC submits a petition seeking approval to remove three waivers in NERC Reliability Standard requirements. These waivers are: the “Scheduling Agent Waiver” in INT-003-2; the “Enhanced Scheduling Agent Waiver” in INT-003-2; and the “RTO Inadvertent Interchange Accounting Waiver” in BAL-006-1. Docket No. RD10-4-000​

11/20/2009
RM06-16-000, RM06-16-007, RM10-5-000
Petition for Approval of an Interpretation of Reliability Standard PRC-005-1

NERC submitted a petition for approval of an interpretation of PRC-005-1 R1.  On January 30, 2009, the Regional Entities Compliance Monitoring Processes Working Group submitted an interpretation request regarding PRC-005-1 Requirement R1.  Docket No. RM06-16-000, RM06-16-007 and RM10-5-000.​

11/17/2009
RM06-16-000, RM10-6-000
Petition for Approval of an Interpretation of Reliability Standard TPL-002-0

NERC submitted for approval of an interpretation for TPL-002-0 R1.3.10.  On January 12, 2009, PacifiCorp submitted an interpretation request regarding TPL-002-0 Requirement R1.3.10.  Docket Nos. RM06-16-000, and RM10-6-000​

11/17/2009
RD10-3-000
Petition for Approval of an Interpretation to Reliability Standard CIP-007-2

NERC submitted a petition for approval of an interpretation to Reliability Standard CIP-007-2 R2.  On March 9, 2009, the Western Electricity Coordinating Council submitted an interpretation request regarding CIP-007-2 Requirement R2.  Docket No. RD10-3-000​

11/17/2009
RR10-2-000
Petition for Approval of Amendments to Delegation Agreements with Regional Entities

NERC submit a petition requesting approval of an amendment to NERC’s Delegation Agreements with the eight Regional Entities. The proposed amendment would extend the initial term of the Delegation Agreements by one year, to May 2, 2011.  Docket No. RR10-2-000

11/12/2009
RR10-3-000
Petition for Approval of Amendments to NERC's ROP

NERC submits a petition requesting approval of several amendments to NERC’s Rules of Procedure (ROP), for the purpose of reflecting the termination of the NERC Reliability Readiness Evaluation and Improvement Program.  Docket No. RR10-3-000​

11/12/2009
NP10-2-000
Supplemental Informational Filing Regarding the Omnibus NOP Filing - November 11, 2009

NERC provides this Supplemental Filing regarding the October 14, 2009 Omnibus Notice of Penalty Filing. Docket No. NP10-2-000​

11/11/2009
NP10-2-000
Supplemental Informational Filing Regarding the Omnibus NOP Filing - November 5, 2009

NERC provides this Supplemental Filing regarding the October 14, 2009 Omnibus Notice of Penalty Filing.  Docket No. NP10-2-000​

11/5/2009
RR06-1-000
Quarterly Report Regarding NERC's Reliability Standards Voting Results

NERC issues a quarterly report detailing the analysis of reliability standards voting results from July-September 2009.  Docket No. RR06-1-000​

11/2/2009
RR10-1-000
Petition for Approval of Amendments to NERC ROP Section 412 and Appendix 4D

NERC submits a Petition for Approval of Amendments to the Rules of Procedure of the North American Electric Reliability Corporation — New Section 412 and Appendix 4D, “Procedure for Requesting and Receiving Technical Feasibility Exceptions to NERC Critical Infrastructure Protection Standards.” Docket No. RR10-1-000​

10/29/2009
RM06-16-000
Comments on the BPS TIER Report

NERC submits comments on the Topological and Impedance Element Ranking (TIER) of the Bulk Power System Preliminary Report. Docket No. RM06-16-000​

10/28/2009
RM08-12-000
Compliance Filing in Response to Order No. 723, Proposed VSLs for WECC Regional Reliability Standard

NERC submits a Compliance filing in response to paragraphs 26 and 54 of Order No. 723: Proposed VSLs for Regional Reliability Standard BAL-004-WECC-01, Automatic Time Error Correction Requirements R2 through R4 and Request for an Extension of Time for the filing of the VSL for Requirement R1 and, in the alternative, approval of the proposed Binary VSL for Requirement R1, filed today with FERC. Docket No. RM08-12-000.​

10/23/2009
NP09- 26-000
Answer to U.S. Department of Energy's Motion for Stay

NERC responds to the October 7, 2009 United States Department of Energy Motion for Stay in the jurisdictional issue involving Section 215 of the FPA and NERC's jurisdiction over federal entities. Docket No. NP09- 26-000​

10/22/2009
RM06-16-000
Motion for an Extension of Time

NERC submits a Motion for an Extension of Time from October 13, 2009 to October 28, 2009 to allow it to submit comments in response to FERC’s September 10, 2009 Notice requesting comments on the Topological and Impedance Element Ranking (“TIER”) Report. Docket No. RM06-16-000​

9/30/2009
RM09-25-000
Petition for Approval of Proposed Reliability Standards Regarding System Personnel Training

NERC submits two proposed Reliability Standards regarding System Personnel Training (PER-005-1 and PER-004-2) and requests retirement of an existing standard (PER-002-0).  Docket No. RM09-25-000​

9/30/2009
RM06-16-000
Informational Filing on the Status of Field Trial to Modify Certain Resource and Demand Balancing Reliability Standards

NERC submits this informational filing describing the background and status of a field trial approved under NERC’s Reliability Standards Development Process. Docket No. RM06-16-000​

9/23/2009
RC09-3-000
Compliance Filing and Assessment of the BES Definition Report of NERC and NPCC

NERC and NPCC submit a compliance filling and assessment of the bulk electric system definition report in response to the December 18, 2008 Order.  Docket No. RC09-3-000​

9/21/2009
RR09-7-000
NERC Answer to Comments on Three-Year ERO Performance Assessment Report

NERC submits an Answer to the comments filed by interested entities on NERC’s Three-Year Electric Reliability Organization Performance Assessment Report (Three-Year ERO Report or Report) that NERC filed with the Commission on July 20, 2009, pursuant to 18 C.F.R. §39.3(c). Docket No. RR09-7-000 ​

9/18/2009
RR09-9-000, RR07-14-004, RR08-6-004
Notice of Corrections to 2010 Business Plan and Budget Filing

NERC notifies the Commission and the parties to this proceeding of the following two corrections to NERC’s 2010 Business Plan and Budget filing that was submitted to the Commission on August 24, 2009.  Docket Nos. RR09-9-000, RR07-14-004 and RR08-6-004​

9/18/2009
RM06-22-000
Compliance Filing and Petition for Approval of an Implementation Plan for CIP Reliability Standards

NERC submits to FERC a Compliance Filing and Petition for Approval of an Implementation Plan for Critical Infrastructure Protection Reliability Standards for Generator Owners and Generator Operators of U.S. Nuclear Power Plants in Accordance with Paragraph 60 of Order No. 706-B. Docket No. RM06-22-000.​

9/15/2009
RR08-4-000, RR08-4-001, RR08-4-002
Motion for an Extension of Time

NERC submits a Motion for an Extension of Time from September 18, 2009 to March 1, 2010 to allow it to submit a compliance filing in response to FERC’s June 19, 2008 Order and November 20, 2008 Order.  Docket Nos. RR08-4-000, RR08-4-001, RR08-4-002​

9/14/2009
RR09-9-000, RR07-14-004, RR08-6-004
Supplemental Filing of Attachment 15 for Acceptance of the 2010 Business Plan and Budget

The purpose of this Supplemental Filing is to submit to the Commission Attachment 15 – Metrics Comparing Regional Entity Operations Based on the 2010 Budgets, which was not included in NERC’s original August 24, 2009 filing in these dockets. Docket Nos. RR09-9-000, RR07-14-004 and RR08-6-004​

9/14/2009
NP09-26-000
Motion for Leave to File Reply Comments and Reply Comments Regarding Notice of Penalty

NERC submits a motion for leave to file reply comments and reply comments regarding NERC Notice of Penalty - U.S. Army Corps of Engineers - Tulsa District.  Docket No. NP09-26-000​

9/8/2009
RM06-16-000
Second Quarter 2009 Compliance Filing in Response to Order No. 693

NERC files the Second Quarter 2009 Compliance Filing in response to Paragraph 629 of Order No. 693. Docket No. RM06-16-000​

8/31/2009
RM08-12-000
Compliance Filing in Response to Order No. 723

NERC submits this filing in compliance with the directives in paragraphs 26 and 51 of the FERC May 21, 2009 Order No. 723.  This filing includes modifications to the“WECC VRFs for the BAL-004-WECC-01 Regional Reliability Standard as specified by FERC. Docket No. RM08-12-000​

8/28/2009
RR08-6-004, RR07-14-004, RR09-9-000
Request for Acceptance of 2010 Business Plans and Budgets of NERC and for Approval of Proposed Assessments to Fund Budgets

NERC submits this filing requesting acceptance of the 2010 Business Plans and
Budgets of NERC, the eight Regional Entities and the Western Interconnection Regional
Advisory Body, and approval of the proposed assessments to fund the 2010 budgets.  Docket Nos. RR08-6-004, RR07-14-004, RR09-9-000​

8/24/2009
RM08-13-000
Comments of NERC in Response to Notice of Proposed Rulemaking

NERC provides these comments in response to FERC's NOPR for the Transmission Relay Loadability Reliability Standard.  Docket No. RM08-13-000

8/17/2009
RM08-3-000
Compliance Filing in Response to Order No. 716 and Petiton for Approval of NUC Reliability Standard

NERC submits this filing in compliance with paragraphs 73 and 107 of Order No. 716 and also seeks approval of proposed reliability standard NUC-001-2 — Nuclear Plant Interface Coordination.  Docket No. RM08-3-000​

8/14/2009
RD09-9-000
Petition for Approval of Errata Changes to Three Reliability Standards

NERC submits this filing seeking approval of errata changes to three Reliability Standards that are officially on file with and previously approved by FERC.  The standards in this filing are IRO-006-4.1, MOD-021-0.1, PER-001-0.1.  Docket No. RD09-9-000​

8/12/2009
RM08-11-000, RR08-4-000, RR07-9-000, RR07-10-000
Informational Filing Regarding the Assignment of Violation Risk Factors and Violation Security Levels

NERC submits an informational filing setting forth a summary of revised guidelines intended for for use in determining the assignment of VRFs and VSLs for NERC Reliability Standards. Docket Nos. RM08-11-000, RR08-4-000, RR07-9-000 and RR07-10-000​

8/10/2009
RR09-8-000
Petition for Approval of Amendments to the NERC Bylaws

NERC requests Commission approval of amendments to Article III, sections 1 and 2 of NERC’s Bylaws. Docket No. RR09-8-000​

8/6/2009
RR08-6-000
Request for Approval of Supplemental 2009 Budget and Funding for MRO

NERC submits to the Commission a supplement to the 2009 Business Plan and Budget and assessments of the Midwest Reliability Organization (MRO). Docket No. RR08-6-000

8/6/2009
RR06-1-000
Quarterly Report of NERC Regarding Analysis of Reliability Standards Voting Results April-June 2009

NERC submits its second quarter 2009 report on the analysis of voting results for Reliability Standards. Docket No. RR06-1-000​

7/31/2009
RR06-1-021, RR07-1-005, RR07-2-005, RR07-3-006, RR07-4-005, RR07-5-006, RR07-6-007, RR07-7-007, RR07-8-006
Compliance Filing In Response to June 1, 2009 FERC Order

NERC hereby submits a compliance filing in response to the Commission’s June 1, 2009 Order regarding a revised NERC uniform (CMEP) document, Attachment 4C to the NERC Rules of Procedure. Docket Nos. RR06-1-021, RR07-1-005, RR07-2-005, RR07-3-006, RR07-4-005, RR07-5-006, RR07-6-007, RR07-7-007, RR07-8-006​

7/30/2009
RR09-7-000
NERC Three-Year Assessment

NERC hereby submits its “Three-Year Electric Reliability Organization Performance Assessment Report,” in accordance with the requirements of the Commission’s regulations at 18 C.F.R. §39.3(c). Docket No. RR09-7-000​

7/20/2009
RM08-11-000
Compliance Filing in Response to Order No. 722

NERC submits this filing in compliance with the directives in paragraphs 99 and 100 of the Federal Energy Regulatory Commission’s (“FERC” or the “Commission”) March 20, 2009 Order (“Order No. 722”) in Docket No. RM08-11-000.  This filing regards the WECC proposed VRFs for the WECC Regional Difference Requirements to the Reliability Standards. Docket No. RM08-11-000

7/6/2009
RM06-22-002, RM06-22-003
Compliance Filing in response to Order on Compliance Filing- Mandatory Reliability Standards for the CIP VRFs

NERC submits modifications to Violation Risk Factors (“VRFs”) for four Requirements or Sub-
Requirements in the Critical Infrastructure Protection (“CIP”) Reliability Standards CIP-002-1
through CIP-009-1 that have been approved by the Commission. Docket Nos. RM06-22-002 and RM06-22-003​

6/30/2009
RM06-22-000
Petition for Approval of VSLs to CIP Version 1 Reliability Standards

NERC submits a filing seeking approval for Violation Severity Level (“VSL”)
assignments for approved Reliability Standards: CIP-002-1, CIP-003-1,CIP-004-1, CIP-
005-1, CIP-006-1, CIP-007-1, CIP-008-1 and CIP-009-1. Docket No. RM06-22-000​

6/30/2009
RR06-1-012, RR07-7-002
Delegation Agreement Between NERC and WECC

NERC and WECC submit a status report in response to Paragraph 230 of the Commission's March 21, 2008 Order regarding WECC's justification for its proposed deviation from the NERC pro forma hearing procedures regarding omission of NERC’s shortened hearing procedure from the WECC hearing procedure. Docket Nos. RR06-1-012 and RR07-7-002.​

6/29/2009
RM08-7-000, RM08-7-001
Compliance Filing in Response to FERC Order 713-A

NERC submits a filing in compliance with the directives in paragraphs 14, 59 and 72 of the Commission's March 21, 2009 Order No. 713-A.  This filing includes revisions to VRFs for Reliability Standard IRO-006-4, regarding interchange and transmission loading relief. Docket Nos. RM08-7-000 and RM08-7-001​

6/22/2009
NP09-21-000
Response of NERC and MRO to FERC's May 29, 2009 Order

NERC and the Midwest Reliability Corporation (MRO) submit a response to the Commission's May 29, 2009 Order regarding NERC's May 1, 2009 Notice of Penalty filing regarding Wisconsin Public Service Corporation (WPSC) in the MRO Region. Docket No. NP09-21-000​

6/18/2009
RM09-19-000
Petition for Approval of Proposed WECC Regional Reliability Standard IRO-006-WECC-1

NERC submits this petition seeking approval of one proposed regional Reliability Standard, IRO-006-WECC-1 -Qualified Transer Path Unscheduled Flow (USF) Relief, and six associated new definitions.  Docket Nos. RM09-19-000​

6/17/2009
RR09-5-000
Petition for Approval of Proposed Revisions to the Standards Development Process of Texas RE and Related Regional Entity Rules

NERC requests the Commission’s approval of revisions to the Standards Development Process of Texas Regional Entity (Texas RE), a Division of the Electric Reliability Council of Texas, Inc. (ERCOT), which is contained in Exhibit C to the Amended and Restated Delegation Agreement between NERC and Texas RE. NERC also requests approval of the Texas RE Reliability Standards Committee (RSC) Procedure and Registered Ballot Body (RBB) Procedure, as Regional Entity Rules. Docket No. RR09-5-000​

6/8/2009
RC09-3-000
Informational Status Report of NERC and NPCC, Inc. in Response to the Commission's December 18th, 2009 Order

NERC and the Northeast Power Coordinating Council, Inc.’s Informational Status Report in Response to the Commission’s December 18, 2009 Order describing the progress made to
date on NPCC’s application of the definition of the bulk electric system (“BES”) in NPCC and
its continuing generator registration efforts. Docket No. RC09-3-000.​

6/5/2009
RC09-2-000
NERC 2009 Summer Reliability Assessment

NERC submits solely as an informational filing the 2009 Summer Reliability Assessment that was prepared by NERC and released on May 19, 2009. Docket No. RC09-2-000​

6/4/2009
RM06-16-000
Compliance Filing in Response to Paragraph 629 of Order No. 693

NERC submits this filing in compliance with paragraph 629 of the Commission Order No. 693. Docket No. RM06-16-000​

6/1/2009
RM08-11-000
Compliance Filing in Response to Order No. 722 - Version 2 Facilities Design, Connections, and Maintenance Reliability Standards.

NERC submits modifications to VSLs for three revised Facilities Design, Connections, and Maintenance (“FAC”) Reliability Standards: FAC-010-2 — System Operating Limits Methodology for the Planning Horizon; FAC-011-2 — System Operating Limits Methodology for the Operations Horizon; and FAC-014-2 — Establish and Communicate System Operating Limits. Docket No. RM08-11-000​

5/29/2009
RM08-11-000
Motion for Extension of Time to Respond to Paragraph 99 of Order No. 722

NERC submits a Motion for a Forty-Five Day Extension of Time from May 29, 2009 to July 13, 2009 to submit a compliance filing in response to Paragraph 99 of the Commission’s March 20, 2009 Order No. 722. Docket No. RM08-11-000​

5/29/2009
RM08-19-000, RM08-19-001, RM09-5-000, RM06-16-005
Comments in Response to ATC Reliability Standards NOPR

NERC submits comments in response to the Commission's NOPR regarding Mandatory Reliability Standards for the Calculation of Available Transfer Capability, Capacity Benefit Margins, Transmission Reliability Margins, Total Transfer Capability, and Existing Transmission Commitments and Mandatory Reliability Standards for the Bulk-Power System.  Docket Nos. RM08-19-000, RM08-19-001, RM09-5-000, and RM06-16-005.​

5/26/2009
RM06-22-000, RD09-7-000
Petition of NERC for Approval of Version 2 Critical Infrastructure Protection Standards

NERC petitions FERC seeking approval for proposed modifications to Critical Infrastructure Protection Reliability Standards CIP-002-1, CIP-003-1, CIP-004-1, CIP-005-1, CIP-006-1, CIP-007-1, CIP-008-1 and CIP-009-1. Docket Nos. RM06-22-000 and RD09-7-000​

5/22/2009
RR09-4-000
Petition of NERC for Approval of Propsed Revisions to the Bylaws of Southwest Power Pool, Inc.

NERC submits a petition for approval of the proposed revisions to the SPP, Inc. bylaws.  Docket No. RR09-4-000​

5/21/2009
RC08-7-001
Comments in Support of Texas RE and Constellation Settlement Agreement

NERC and Texas RE submit comments in support of the settlement agreement among NERC, Texas RE and Constellation filed on April 21, 2009. Docket No. RC08-7-001​

5/12/2009
PL09-4-000
Smart Grid Policy Statement Comments

NERC submits comments on the Commission's Smart Grid Policy Statement. Docket No. PL09-4-000​

5/11/2009
1 - 500Next