RM13-11-000 | | 12/30/2013 |
RR13-10-001 |
NERC submits a compliance filing to restore and add text to Section 1 of Exhibit E of the NERC-WECC Delegation Agreement, in response to Paragraphs 2 and 50 of FERC's December 6, 2013 order. NERC also responds to Paragraphs 41 and 52 of the order.
| 12/20/2013 |
RD14-9-000 | | 12/20/2013 |
RM13-12-000, RM13-14-000, RM13-15-000 | NERC Motion to Defer Action NERC submits a motion to defer action on NERC's request to approve revisions to the Transmission (TOP) and Interconnection Reliability Operations and Coordination (IRO) Reliability Standards until January 31, 2015. | 12/20/2013 |
RR14-1-000 | | 12/20/2013 |
RM14-3-000 | | 12/17/2013 |
RD14-2-000 | | 12/13/2013 |
RD13-9-000 |
NERC submits a Notice of Withdrawal of the Joint Petition for Approval of
Proposed Regional Reliability Standard PRC-006-SPP-01 (Underfrequency Load
Shedding).
| 12/11/2013 |
RR13-9-002 | NERC's 2014 Business Plan and Budget Corrected Appendix 2 NERC submits its corrected version of Appendix 2, "2012 NEL Calculations and Allocations to Load Serving Entities (or Designee) for the 2014 NERC and RE [Regional Entity] Assessments," to NERC's 2014 Business Plan and Budget filing, originally submitted on August 23, 2013. | 12/3/2013 |
RR13-3-001 | | 12/2/2013 |
RM06-16-000 | Third Quarter 2013 Compliance Filing of NERC in Response to Paragraph 629 of Order No. 693
NERC submits the Third Quarter 2013 compliance filing in response to Paragraph 629 of Order No. 693. Order No. 693 requires that NERC provide a quarterly informational filing regarding the timeframe to restore power to the auxiliary power systems of U.S. nuclear power plants following a blackout as determined during simulations and drills of system restoration plans. This filing contains the referenced material pertaining to the third quarter of 2013. | 11/26/2013 |
RM13-16-000 | NERC Comments in Response to Notice of Proposed Rulemaking for Generator Verification Reliability Standards NERC submits comments in response to the Notice of Proposed Rulemaking (NOPR) proposing to approve the following Reliability Standards: MOD-025-2 (Verification and Data Reporting of Generator Real and Reactive Power Capability and Synchronous Condenser Reactive Power Capability), MOD-026-1 (Verification of Models and Data for Generator Excitation Control System or Plant Volt/Var Control Functions), MOD-027-1 (Verification of Models and Data for Turbine/Governor and Load Control or Active Power/Frequency Control Functions), PRC-019-1 (Coordination of Generating Unit or Plant Capabilities, Voltage Regulating Controls, and Protection), and PRC-024-1 (Generator Frequency and Voltage Protective Relay Settings). | 11/25/2013 |
RR13-9-001 |
NERC submits a compliance filing in response to Paragraph 23 of the November 1, 2013 2014 Business Plan and Budget Order of NERC and the Regional Entities. Paragraph 23 cited to a $3.8 million amount referred to in NERC’s Business Plan and Budget as “restricted” working capital to offset future liabilities regarding lease agreements, and directed NERC to submit a compliance filing indicating how NERC will allocate the $3.8 million consistent with NERC’s Working Capital and Operating Reserve Policy.
| 11/22/2013 |
FA11-21-000 | Compliance Filling in Response to January 16 Order NERC submits an unaudited report of NERC’s budget-to-actual variance information for the third quarter of 2013. This compliance filing is in accordance with the January 16, 2013 Order, which approved a Settlement Agreement between the FERC Office of Enforcement and NERC, related to findings and recommendations arising out of its 2012 performance audit of NERC. | 11/14/2013 |
RM14-1-000 | | 11/14/2013 |
RM05-17-000, RM05-25-000, RM06-16-000 |
NERC submits its Reliability Standards Development Plan: 2014-2016 (2014 Development Plan) in accordance with Section 210 of the NERC Rules of Procedure. | 11/8/2013 |
RR06-1-000 and RR09-7-000 | | 10/30/2013 |
RM13-7-000 | | 10/30/2013 |
AD13-8-000 |
NERC submits a doc-less motion to intervene in the proceeding in regards to certain requirements of NERC's proposed Reliability Standard BAL-003-1 (Frequency Response and Frequency Bias Setting).
| 10/18/2013 |
RM13-11-000 | | 10/15/2013 |
RM13-5-000 | | 10/11/2013 |
RR13-12-000 | | 10/4/2013 |
RM13-5-000 | Errata to Petition for Approval of CIP Version 5 On September 30, 2013, NERC submitted an errata to the proposed defined terms and violation severity levels associated with version 5 of the Critical Infrastructure Protection Reliability Standards (CIP Version 5) pending before the Commission. NERC submits a replacement, Attachment 2 that contains corrected clean and redline version of proposed Reliability Standard CIP-002-5.1. | 10/1/2013 |
EL13-22-000 | Status Report Informational Filing in Response to FERC's March 4, 2013 Order NERC submits this quarterly report on the status of an investigation into PacifiCorp's allegations in a November 16, 2012 complaint against the Western Electricity Coordinating Council and the Los Angeles Department of Water and Power. FERC directed NERC to file quarterly status reports until the investigation is completed, in its March 4, 2013 order on the complaint. | 10/1/2013 |
RR10-1-001 | | 9/30/2013 |
RM13-5-000 | | 9/30/2013 |
RM13-19-000 | | 9/30/2013 |
RM13-11-000 | | 9/27/2013 |
RM13-7-000 | | 9/23/2013 |
RM13-13-000 | | 9/23/2013 |
RC13-4-000 and RC13-4-001 | | 9/23/2013 |
RD13-12-000 | | 9/18/2013 |
RD11-13-000 | | 9/9/2013 |
RR13-9-000 | NERC Response to EEI's Request for Extension of Time NERC submits this response to Edison Electric Institute's motion requesting an extension of time to September 20, 2013 to file comments on the proposed 2014 Business Plans and Budgets of NERC and the Regional Entities. | 9/9/2013 |
RR13-11-000 | | 8/30/2013 |
RM06-16-000 | Second Quarter 2013 Nuclear Compliance Filing of NERC in Response to Paragraph 629 of Order No. 693 NERC submits the Second Quarter 2013 compliance filing in response to Paragraph 629 of Order No. 693. Order No. 693 requires that NERC provide a quarterly informational filing regarding the timeframe to restore power to the auxiliary power systems of U.S. nuclear power plants following a blackout as determined during simulations and drills of system restoration plans. This filing contains the referenced material pertaining to the second quarter of 2013. | 8/28/2013 |
RM13-8-000 | NERC Comments on the P81 Notice of Proposed Rulemaking NERC submits comments in response to the FERC June 20, 2013 Notice of Proposed Rulemaking (NOPR) proposing to approve NERC's petition to retire 34 Requirements within 19 Reliability Standards and proposing to withdraw 41 outstanding directives.
| 8/27/2013 |
RM13-17-000 |
NERC submits comments on the Notice of Proposed Rulemaking (NOPR) regarding Communication of Operational Information Between Natural Gas Pipelines and Electric Transmission Operators.
| 8/26/2013 |
RR13-10-000 |
NERC submits a petition for approval of amendments to the Delegation Agreement with Western Electricity Coordinating Council (WECC) – amendments to Exhibit A (Regional Boundaries of WECC), B (WECC Bylaws), and E (Funding). The principal purpose of these amendments is to revise various sections and exhibits in the Delegation Agreement to implement a decision by WECC to completely separate its compliance monitoring and enforcement function from the Reliability Coordinator and Interchange Authority functions for the Western Interconnection. That proposed separation was the subject of a declaratory order issued by the FERC on June 20, 2013.
| 8/26/2013 |
FA11-21-000 | Compliance Filling in Response to January 16, 2013 Order NERC submits its Board of Trustees compensation study and decision. This compliance filing is in accordance with the January 16, 2013 Order, which approved a Settlement Agreement between the FERC Office of Enforcement and NERC, related to findings and recommendations arising out of its 2012 performance audit of NERC. | 8/23/2013 |
RR13-9-000 | | 8/23/2013 |
RD13-11-000 | | 8/20/2013 |
RC13-4-001 |
NERC submits a request for rehearing on the South Louisiana Electric Cooperative Association registration appeal.
| 8/19/2013 |
FA11-21-000 | Compliance Filling in Response to January 16 Order NERC submits an unaudited report of NERC’s budget-to-actual variance information for the second quarter of 2013. This compliance filing is in accordance with the January 16, 2013 Order, which approved a Settlement Agreement between the FERC Office of Enforcement and NERC, related to findings and recommendations arising out of its 2012 performance audit of NERC. | 8/14/2013 |
RR13-8-000 | | 8/9/2013 |
RR06-1-000 and RR09-7-000 | | 7/30/2013 |
NP13-41-000 | | 7/24/2013 |
RR13-7-000 | | 7/17/2013 |
RM12-4-001 | Compliance Filing of Reliability Standard FAC-003-2 NERC submits a compliance filing to the transmission Vegetation Management Reliability Standard, pursuant to Order No. 777: (1) to provide a detailed description of NERC's plan to conduct testing to develop empirical data regarding the flashover distances between conductors and vegetation; (2) to modify the Violation Risk Factor (VRF) for Requirement R2; and (3) to confirm NERC has posted guidance materials for NERC Reliability Standard FAC-003-2. | 7/12/2013 |
RM12-16-000 | | 7/9/2013 |
RM13-6-000 |
NERC submits comments in response to the May 16, 2013 Notice of Proposed Rulemaking (NOPR) proposing to remand the proposed interpretation of Reliability Standard BAL-002-1.
| 7/8/2013 |
EL13-22-000 | Status Report Informational Filing in Response to FERC's March 4, 2013 Order NERC submits this quarterly report on the status of an investigation into PacifiCorp's allegations in a November 16, 2012 complaint against the Western Electricity Coordinating Council and the Los Angeles Department of Water and Power. FERC directed NERC to file quarterly status reports until the investigation is completed, in its March 4, 2013 order on the complaint. | 7/1/2013 |
RM12-1-000 and RM13-9-000 | | 6/24/2013 |
RM12-16-000 | Comments of NERC on Generator Requirements at the Transmission Interface NOPR NERC submits comments in response to the FERC April 18, 2013 Notice of Proposed Rulemaking (NOPR) regarding modifications to four existing Reliability Standards, FAC-001-1 (Facility Connection Requirements), FAC-003-3 (Transmission Vegetation Management), PRC-004-2.1a (Analysis and Mitigation of Transmission and Generation Protection System Misoperations), and PRC-005-1.1b (Transmission and Generation Protection System Maintenance and Testing). | 6/24/2013 |
RM13-5-000 | | 6/24/2013 |
NP13-34-000 |
NERC submits an errata filing to the May 30, 2013 Notice of Penalty regarding an Unidentified Registered Entity.
| 6/7/2013 |
RM12-6-000 and RM12-7-000 | Reply Comments of NERC NERC submits reply comments to extend the effective date of the Definition of BES from July 1, 2013 to July 1, 2014. | 6/4/2013 |
RM12-6-000 and RM12-7-000 | Informational Filing on Bulk Electric System Definition Exceptions NERC submits this informational filing regarding how a list of facilities and Elements for which Exceptions have been granted and those for which an entity has made a self-determined exclusion, will be maintained. The filing also identifies how information will be made available to the Commission, Regional Entities, and to other interested persons. | 6/3/2013 |
RM06-16-000 | First Quarter 2013 Compliance Filing on Paragraph 629 of Order 693 - Nuclear Data NERC submits the First Quarter 2013 Compliance Filing of the North American Electric Reliability Corporation in Response to Paragraph 629 of Order No. 693. Order No. 693 requires that NERC provide a quarterly informational filing regarding the timeframe to restore power to the auxiliary power systems of U.S. nuclear power plants following a blackout as determined during simulations and drills of system restoration plans. This filing contains the referenced material pertaining to the first quarter of 2013. | 5/31/2013 |
RR13-6-000 | | 5/30/2013 |
RM13-16-000 | | 5/30/2013 |
FA11-21-000 | Compliance Filling in Response to January 16, 2013 Order NERC submits its Employee Rewards and Recognition Policy. This compliance filing is in accordance with the January 16, 2013 Order, which approved a Settlement Agreement between the FERC Office of Enforcement and NERC, related to findings and recommendations arising out of its 2012 performance audit of NERC. | 5/28/2013 |
RM12-6-000 and RM12-7-000 | | 5/23/2013 |
FA11-21-000 and FA11-21-001 |
NERC submits an unaudited report of NERC’s budget-to-actual variance information for the first quarter of 2013. This compliance filing is in accordance with the January 16, 2013 Order, which approved a Settlement Agreement between the FERC Office of Enforcement and NERC, related to findings and recommendations arising out of its 2012 performance audit of NERC.
| 5/15/2013 |
RM12-19-000 | | 5/13/2013 |
RR06-1-000 | | 5/10/2013 |
RD13-10-000 | | 5/10/2013 |
RC13-4-000 | | 4/30/2013 |
RD13-9-000 | | 4/26/2013 |
RR13-5-000 | | 4/26/2013 |
RR06-1-000 and RR09-7-000 |
NERC submits an informational report on the analysis of NERC Standards Process Results for the First Quarter 2013 in compliance with an order issued by FERC on January 18, 2007 and a subsequent order on September 16, 2010.
| 4/25/2013 |
RD12-5-001 | | 4/22/2013 |
RM13-14-000 |
NERC submits a petition for approval of three Transmission Operation Standards (TOP-001-2—Transmission Operations, TOP-002-3—Operations Planning, TOP-003-2—Operational Reliability Data) one Protection and Control Reliability Standard (PRC-001-2—System Protection Coordination), and retirement of nine existing Reliability Standards and one Requirement from an existing Reliability Standard.
| 4/16/2013 |
RM13-15-000 |
NERC submits a petition for approval of proposed Reliability Standards IRO-001-3, IRO-002-3, IRO-005-4, and IRO-014-2.
| 4/16/2013 |
EL13-52-000 | | 4/15/2013 |
RM13-13-000 | | 4/12/2013 |
RD13-8-000 |
NERC submits a petition for approval of an interpretation to Reliability Standards TPL-003-0a and TPL-004-0.
| 4/12/2013 |
RR13-4-000 | | 4/9/2013 |
RR13-3-000 | | 4/8/2013 |
RM13-12-000 | Petition for Approval of Proposed Reliability Standard TOP-006-3 (Monitoring System Conditions) (Rapid Revision) NERC submits a petition for approval of proposed Reliability Standard TOP-006-3 (Monitoring System Conditions). This standard revision was made through NERC’s Rapid Revision process to clarify that Transmission Operators are responsible for monitoring and reporting available transmission resources; that Balancing Authorities are responsible for monitoring and reporting available generation resources; and to confirm that Reliability Coordinators, Transmission Operators, and Balancing Authorities are required to supply their operating personnel with appropriate technical information concerning protective relays located within their respective areas. | 4/5/2013 |
RR13-2-000 | | 4/5/2013 |
RM12-6-000 and RM12-7-000 | | 4/4/2013 |
RR09-6-003 | | 4/1/2013 |
RM13-11-000 | | 3/29/2013 |
RC13-4-000 |
NERC submits a motion to intervene, protest and comment on the South Louisiana Electric Cooperative Association registration appeal.
| 3/18/2013 |
RC11-6-004 | | 3/15/2013 |
RM12-9-001 | | 3/11/2013 |
FA11-21-000 | Response of NERC to EEI Motion to Intervene, Motion to Consolidate, and Comments NERC submits a response to Edison Electric Institute's February 22, 2012 Motion to Intervene, Motion to Consolidate, and Comments on NERC's Compliance Filing in Response to Paragraph 30 of November 2, 2012 Commission Order, filed February 1, 2012, in which NERC submitted the “NERC Written Criteria for Determining Whether an Activity is Eligible to Be Funded Under Section 215 of the Federal Power Act.” | 3/6/2013 |
RM12-1-000 and RM13-9-000 | | 2/28/2013 |
RM13-8-000 | Petition of NERC for Approval of Retirement of Requirements in Reliability Standards NERC submits a petition requesting approval of the retirement of 34 Requirements within 19 currently effective Reliability Standards that are redundant or otherwise unnecessary, and for which violations of these Requirements (currently included in Reliability Standards) pose a lesser risk to the reliability of the Bulk-Power System. | 2/28/2013 |
RR13-2-000 | Petition of NERC for Approval of Revisions to the NERC Standard Processes Manual NERC files a petition for approval of revisions to the NERC Standard Processes Manual (SPM). The SPM contains all of the procedures governing the Reliability Standards development process. The proposed revisions to the SPM enhance the Reliability Standards development process by providing additional clarity and streamlining the drafting, commenting and balloting processes. | 2/28/2013 |
RM06-16-000 | Fourth Quarter 2012 Nuclear Compliance Filing of NERC in Response to Paragraph 629 of Order No. 693 NERC submits the Fourth Quarter 2012 compliance filing in response to Paragraph 629 of Order No. 693. Order No. 693 requires that NERC provide a quarterly informational filing regarding the timeframe to restore power to the auxiliary power systems of U.S. nuclear power plants following a blackout as determined during simulations and drills of system restoration plans. This filing contains the referenced material pertaining to the fourth quarter of 2012. | 2/26/2013 |
RM13-7-000 | | 2/26/2013 |
RD13-6-000 | | 2/25/2013 |
RM12-6-000 and RM12-7-000 |
NERC submits a request for leave to respond and submits a response to the response of Exelon Corporation to the Request for Clarification of NERC of the Commission’s December 20, 2012 Order No. 773 on Revisions to the Electric Reliability Organization Definition of Bulk Electric System (BES) and Rules of Procedure.
| 2/21/2013 |
RR12-8-001 | Compliance Filing in Response to December 20, 2012 Order NERC submits a compliance filing in response to FERC's December 20, 2012 Order. The December 20, 2012 Order generally approved revisions to the NERC Rules of Procedure filed with FERC on May 7, 2012, but rejected certain proposed revisions which this filing addresses. | 2/19/2013 |
RM08-13-000 and RM08-13-001 |
NERC submits a compliance filing in response to Order Nos. 733 and 759, directing NERC to file with the Commission a test for Planning Coordinators to identify sub-200 kV critical facilities, and the results of that test on a representative sample of utilities in three Interconnections.
| 2/19/2013 |
RR12-8-000 | Informational Filing in Response to December 20, 2012 Order NERC submits an informational filing in response to Paragraph 31 of FERC's December 20, 2012 Order. The December 20, 2012 Order generally approved revisions to the NERC Rules of Procedure (ROP) filed with FERC on May 7, 2012, but rejected certain proposed revisions. Paragraph 31 directs NERC to explain the assessment of Penalties with respect to Regional Entities and to address the issue identified in ROP Sections 402.6 and 404.1. | 2/19/2013 |
RD13-5-000 |
NERC submits a follow-up filing to its December 1, 2010 compliance filing (VSL Filing 2) providing further changes to proposed VRFs and VSLs for NERC Reliability Standards. Docket Nos. RR08-4-000, RR08-4-001, RR08-4-002, RM08-19-002, RM09-9-000, RM09-14-000, RM09-19-000, RM09-25-000, RM10-10-000, RM10-15-000, RM10-16-000, RD11-2-000, RD11-4-000, and RM11-14-000.
| 2/15/2013 |
RM13-6-000 | | 2/12/2013 |
RM12-4-000 | | 2/5/2013 |
FA11-21-000 |
NERC submits a compliance filing in response to Paragraph 30 of the November 2, 2012 Commission Order in Docket Nos. FA11-21-000 and RR12-13-000. This filing provides NERC's written criteria for determining whether a reliability activity is eligible to be funded under Federal Power Act Section 215.
| 2/1/2013 |
RR06-1-000 and RR09-7-000 |
NERC submits an informational report on the analysis of NERC Standards Process Results for the Fourth Quarter 2012 in compliance with an order issued by FERC on January 18, 2007 and a subsequent order on September 16, 2010.
| 1/31/2013 |
RM13-5-000 | | 1/31/2013 |
RM06-16-010 and RM06-16-011 | | 1/23/2013 |
RD13-2-000 | | 1/23/2013 |
RM12-6-001 and RM12-7-001 | | 1/22/2013 |
RD13-1-000 and EL13-11-000 | | 1/17/2013 |
RM12-22-000 | | 1/10/2013 |
AD12-12-000 | | 1/7/2013 |
RD13-3-000 | | 1/4/2013 |
RM05-17-000, RM05-25-000, RM06-16-000 |
NERC submits the Reliability Standards Development Plan: 2013-2015 (RSDP). The RSDP will: 1. Serve as a management tool to guide and coordinate the development of Reliability Standards and provide benchmarks for assessing progress; 2. Serve as a communications tool for coordinating standards development work with applicable governmental agencies in the United States and Canada and for engaging stakeholders in Reliability Standards development activities; and 3. Provide a basis for developing annual plans and budgets for the NERC Reliability Standards program. Docket Nos. RM05-17-000, RM05-25-000 and RM06-16-000
| 12/31/2012 |
RD13-3-000 | Petition for Approval of Proposed Reliability Standard EOP-004-2 (Event Reporting) NERC submits a petition for approval of standard EOP-004-2 (Event Reporting). The proposed Reliability Standard provides a comprehensive approach to reporting disturbances and events that have the potential to impact the reliability of the Bulk Electric System in accordance with several Commission directives. Docket No. RD13-3-000 | 12/31/2012 |
RR13-1-000 | | 12/28/2012 |
RM12-22-000 | | 12/26/2012 |
RM12-4-000 | | 12/21/2012 |
RC11-6-000, RC12-6-000, RC12-7-000 | Follow-up Actions in Response to March 15 Order NERC submits a response to the November 26, 2012 Data Request regarding FERC’s plans to conduct a yearly survey to collect data on the effectiveness and efficiency of the Find, Fix, Track and Report (FFT) program pursuant to the March 15 Order. Docket Nos. RC11-6-000, RC12-6-000 and RC12-7-000 | 12/11/2012 |
RM12-12-000 | | 12/11/2012 |
RC08-5-002 and RC08-5-003 | Compliance Filing regarding DOE-PPPO Registration Appeal NERC submits a compliance filing in response to the Order on Rehearing and Clarification and Compliance Filing regarding the registration appeal for the United States Department of Energy, Portsmouth/Paducah Project Office. Docket Nos. RC08-5-002 and RC08-5-003 | 12/7/2012 |
EL13-11-000 and RD13-1-000 | | 12/6/2012 |
RM06-16-000 | Third Quarter 2012 Nuclear Compliance Filing of NERC in Response to Paragraph 629 of Order No. 693 NERC submits the Third Quarter 2012 compliance filing in response to Paragraph 629 of Order No. 693. Order No. 693 requires that NERC provide a quarterly informational filing regarding the timeframe to restore power to the auxiliary power systems of U.S. nuclear power plants following a blackout as determined during simulations and drills of system restoration plans. This filing contains the referenced material pertaining to the third quarter of 2012. Docket No. RM06-16-000 | 11/29/2012 |
RM12-12-000 | Comments of NERC in Response to NOPR on PRC-006-NPCC-01NERC submits comments in response to FERC's September 20, 2012 Notice of Proposed Rulemaking regarding the proposed regional Reliability Standard PRC-006-NPCC-1 (Automatic Underfrequency Load Shedding). Docket No. RM12-12-000 | 11/26/2012 |
RD13-2-000 | Petition for Approval of Proposed Reliability Standard VAR-002-2b NERC submits a petition for approval of proposed Reliability Standard VAR-002-2b (Generator Operation for Maintaining Network Voltage Schedules), the associated implementation plan, Violation Risk Factors (VRFs) and Violation Severity Levels (VSLs), and retirement of the currently effective Reliability Standard VAR-002-1.1b. Docket No. RD13-2-000 | 11/21/2012 |
EL13-11-000 and RD13-1-000 | | 11/8/2012 |
RR06-1-000 and RR09-7-000 | | 10/31/2012 |
RM06-16-010 and RM06-16-011 | | 10/31/2012 |
RM11-11-000 | | 10/31/2012 |
RM09-13-000 | Notice of Withdrawal of BAL-004-1 - Time Error Correction NERC submits a Notice of Withdrawal of its March 11, 2009 Petition for Approval of the BAL-004-1 Time Error Correction Reliability Standard. BAL-004-0 is currently effective and is unaltered by the submission of this Notice. Docket No. RM09-13-000 | 10/24/2012 |
RC11-6-003 | NERC Compliance Filing - Compliance Enforcement Initiative NERC submits this filing in compliance with the September 20, 2012 Order requiring NERC to file training materials. FERC's March 15 Order accepted NERC's petition requesting approval of its proposal to make informational filings in a Find, Fix, Track and Report (FFT) spreadsheet format in connection with the Compliance Enforcement Initiative (CEI). These training materials are associated with the FFT initiative. Docket No. RC11-6-003 | 10/12/2012 |
RR10-1-001 | | 9/28/2012 |
RM12-9-000 | | 9/24/2012 |
RM12-6-000 and RM12-7-000 | Reply Comments to BES Definition NOPR NERC submits reply comments in response to comments submitted on September 4, 2012 on the June 22, 2012 Notice of Proposed Rulemaking (NOPR) regarding revisions to the ERO Definition of Bulk Electric System and Rules of Procedure. | 9/20/2012 |
RR12-13-000 | | 9/10/2012 |
RR12-13-000 |
NERC submits a response to the motion of EEI to extend the period for filing comments to September 28, 2012 and to shorten the time to respond to the 2013 Business Plans and Budgets of NERC and the eight Regional Entities. Docket No. RR12-13-000 | 9/5/2012 |
RM12-6-000 and RM12-7-000 | | 9/4/2012 |
RM06-16-000 | Second Quarter 2012 Nuclear Compliance Filing of NERC in Response to Paragraph 629 of Order No. 693 NERC submits the Second Quarter 2012 compliance filing in response to Paragraph 629 of Order No. 693. Order No. 693 requires that NERC provide a quarterly informational filing regarding the timeframe to restore power to the auxiliary power systems of U.S. nuclear power plants following a blackout as determined during simulations and drills of system restoration plans. This filing contains the referenced material pertaining to the second quarter of 2012. Docket No. RM06-16-000 | 8/31/2012 |
RM12-19-000 | | 8/24/2012 |
RR12-13-000 | | 8/24/2012 |
RD12-5-000 | | 8/20/2012 |
RM11-20-002 | | 8/9/2012 |
RM12-12-000 | | 8/3/2012 |
RD12-5-000 | | 8/1/2012 |
RD12-6-000 | | 8/1/2012 |
RR06-1-000 and RR09-7-000 | | 7/31/2012 |
RM06-16-010 and RM06-16-011 | | 7/31/2012 |
RM10-5-000 | | 7/30/2012 |
RR12-12-000 | | 7/30/2012 |
RM12-16-000 | Petition for Approval of FAC-001-1, FAC-003-3, PRC-004-2.1a, and PRC-005-1.1b NERC submits a petition for approval of proposed Reliability Standards FAC-001-1 (Facility Connection Requirements), FAC-003-3 (Transmission Vegetation Management), PRC-004-2.1a (Analysis and Mitigation of Transmission and Generation Protection System Misoperations), and PRC-005-1.1b (Transmission and Generation Protection System Maintenance and Testing). Docket No. RM12-16-000 | 7/30/2012 |
RM12-1-000 | | 7/20/2012 |
RC08-5-003 | Compliance Filing in response to April 19, 2012 Order NERC submits a compliance filing in response to the April 19, 2012 Order which directed NERC to either register Ohio Valley Electric Corporation (OVEC) as a load-serving entity or submit a filing explaining why OVEC should not be registered for the load-serving entity function. Docket No. RC08-5-003 | 7/18/2012 |
AD11-9-000 | | 7/5/2012 |
RM11-11-000 | | 7/2/2012 |
NP12-31-000 | Withdrawal of Full Notice of Penalty NERC submits a Withdrawal of Full Notice of Penalty in connection with the May 30, 2012 submitted Full Notice of Penalty regarding San Diego Gas & Electric. Docket No. NP12-31-000. | 6/14/2012 |
NP12-28-000 | Withdrawal of Notice of Penalty NERC submits a Withdrawal of Full Notice of Penalty in connection with the May 30, 2012 submitted Full Notice of Penalty regarding Southern California Edison - Transmission & Distribution Business Unit. Docket No. NP12-28-000. | 6/14/2012 |
RR12-8-000 | | 6/7/2012 |
RM11-20-000 | | 6/6/2012 |
RD12-4-000 | Petition of NERC for Approval of Errata Changes to Seven Reliability Standards NERC proposes errata changes and asks for approval of those changes going forward as BAL-005-0.2b (Automatic Generation Control); EOP-001-0.1b (Emergency Operations Planning); EOP-001-2.1b (Emergency Operations Planning); EOP-002-3.1 (Capacity and Energy Emergencies); IRO-005-3.1a (Reliability Coordination – Current Day Operations); PER-001-0.2 (Operating Personnel Responsibility and Authority); and TOP-002-2b (Normal Operations Planning). Docket No. RD12-4-000 | 6/5/2012 |
RM06-16-000 | First Quarter 2012 Nuclear Compliance Filing of NERC in Response to Paragraph 629 of Order No. 693 NERC submits the First Quarter 2012 compliance filing in response to Paragraph 629 of Order No. 693. Order No. 693 requires that NERC provide a quarterly informational filing regarding the timeframe to restore power to the auxiliary power systems of U.S. nuclear power plants following a blackout as determined during simulations and drills of system restoration plans. This filing contains the referenced material pertaining to the first quarter of 2012. Docket No. RM06-16-000
| 5/31/2012 |
RR12-11-000 | | 5/30/2012 |
RM12-4-000 | | 5/25/2012 |
RR12-10-000 |
NERC submits renewed CMEP Agreements between SERC and FRCC and SERC and SPP RE, and amendments to "Exhibit A to the Amended and Restated Delegation Agreement" of both agreements to reflect the effective date of the agreement. Docket No. RR12-10-000
| 5/24/2012 |
RM12-4-000 | | 5/23/2012 |
RD12-3-000 | | 5/23/2012 |
RC08-5-002 | NERC's Request for Rehearing and Clarification - RC08-5 NERC submits a Request for Rehearing and Clarification in connection with the April 19 Order which granted an appeal filed by the United States Department of Energy, Portsmouth/Paducah Project Office (DOE PPPO) and found that it should not be registered as a load-serving entity (LSE) under the NERC Statement of Compliance Registry Criteria. Docket No. RC08-5-002 | 5/21/2012 |
RM11-18-001 | | 5/21/2012 |
RR12-9-000 | | 5/17/2012 |
RC11-6-002 | NERC Compliance Filing (Compliance Enforcement Initiative) NERC submits this filing in compliance with the March 15 Order where FERC accepted NERC's petition requesting approval of its proposal to make informational filings in a Find, Fix, Track and Report (FFT) spreadsheet format in connection with the Compliance Enforcement Initiative (CEI). Docket No. RC11-6-002 | 5/14/2012 |
RC11-6-000 | NERC's CEI Filing Informational Report NERC submits this filing in compliance with the March 15 Order where FERC accepted NERC's petition requesting approval of its proposal to make informational filings in a Find, Fix, Track and Report (“FFT”) spreadsheet format in connection with the Compliance Enforcement Initiative ("CEI"). The Report describes the experience from September 2011 to March 2012 as well as the feedback received with regard to the initiative. Docket No. RC11-6-000 | 5/14/2012 |
RR12-8-000 |
NERC submits a filing including revisions to Sections 300, 400, 600, 1000, 1400 and 1700 and to Appendices 2, 4B, 4C, and 5B, and the deletion of Appendices 3C and 6 to the NERC Rules of Procedure (ROP). The proposed revisions are the result of a wide-ranging, comprehensive review of the ROP that was conducted to identify improvements to the underlying processes reflected in the ROP based on the experience to date of NERC and the Regional Entities, to further implement actions identified in 2009 in NERC’s Three-Year ERO Performance Assessment Report, to eliminate internal inconsistencies, and to make other improvements and clarifications identified by the review teams. Docket No. RR12-8-000 | 5/7/2012 |
RM12-12-000 | | 5/4/2012 |
RM12-4-000 | | 5/3/2012 |
RR06-1-015 | | 4/30/2012 |
RD12-1-000 | | 4/27/2012 |
RM12-4-000 | Errata to Petition for Approval of FAC-003-2 NERC submits an errata to the petition for approval of proposed Reliability Standard FAC-003-2 (Transmission Vegetation Management) correcting a typo in the Compliance section of the Reliability Standard. Docket No. RM12-4-000 | 4/24/2012 |
RC11-6-001 | | 4/16/2012 |
RM10-5-000 | | 4/12/2012 |
AD12-12-000 | | 3/30/2012 |
RM06-16-000 | Motion for an Extension of Time NERC submits a Motion for an Extension of Time to comply with directives from Order No. 693 with respect to BAL-003 (Resource and Demand Balancing Reliability Standard on Frequency Response and Frequency Bias). Docket No. RM06-16-000
| 3/30/2012 |
RR09-6-003 | | 3/30/2012 |
RM96-1-037 | | 3/23/2012 |
RM06-16-000 | Errata to NERC Glossary of Terms Definition of IROL NERC submits an errata changing the term "Cascading Outages" in the FERC-approved NERC Glossary of Terms definition of Interconnection Reliability Operating Limit (IROL) to "Cascading outages." Docket No. RM06-16-000 | 3/16/2012 |
RM10-6-000 | Informational Filing of NERC in Response to Order No. 754 NERC submits an informational filing in response to Order No. 754 that includes a report on the reliability issues concerning system protection associated with the Commission-approved interpretation of Requirement R1.3.10 of Reliability Standard TPL-002-0. Docket No. RM10-6-000 | 3/15/2012 |
RR12-5-000 | | 3/15/2012 |
AD12-1-000 | | 2/29/2012 |
RM06-16-000 | Fourth Quarter 2011 Nuclear Compliance Filing in Response to Order No. 693 (4Q2011) NERC provides a quarterly informational filing regarding the timeframe to restore power to the auxiliary power systems of U.S. nuclear power plants following a blackout as determined during simulations and drills of system restoration plans. This filing contains the referenced material pertaining to the Fourth Quarter 2011. Docket No. RM06-16-000
| 2/29/2012 |
RM12-2-000 | | 2/27/2012 |
RR12-4-000 | | 2/22/2012 |
RM12-9-000 | | 2/1/2012 |
RD12-1-000 | | 2/1/2012 |
RR06-1-000 and RR09-7-000 | | 1/31/2012 |
RM12-6-000 | | 1/25/2012 |
RM12-7-000 | | 1/25/2012 |
NP12-8-000 | | 1/23/2012 |
RD11-10-000 | | 1/17/2012 |
RD11-3-000 | | 1/17/2012 |
RC11-1-000 and RC11-2-000 | | 1/11/2012 |
RR09-7-000 and RR10-11-000 | Informational Filing regarding Paragraph 773 of Order No. 672 On December 23, 2010, NERC submitted an informational filing in response to Paragraph 773 of Order No. 672 regarding the initial Three Year Regional Entity Audits and Plan for Future Audits. NERC submits this informational filing to report that the initial Audit activities of the eight Regional Entities are completed and to provide information on its plans to focus efforts to restructure the Regional Entity Audit Program. Docket Nos. RR09-7-000 and RR10-11-000 | 1/6/2012 |
RM11-20-000 | | 12/23/2011 |
RM11-18-000 | | 12/21/2011 |
RM12-4-000 | | 12/21/2011 |
NP12-5-000 | | 12/20/2011 |
RM05-17-000, RM05-25-000, RM06-16-000 | | 12/13/2011 |
RM11-11-000 | | 12/5/2011 |
RC11-1-000, RC11-2-000 | Compliance Filing in accordance with the June 16, 2011 Order NERC submits a filing in compliance with the directives in the Commission’s Order issued June 16, 2011. The June 16 Order upheld the registration of Cedar Creek Wind Energy and Milford Wind Corridor Phase I and required them to comply with a list of Transmission Owner and Transmission Operator Reliability Standards and Requirements that apply to the entities. Docket Nos. RC11-1-000 and RC11-2-000 | 12/2/2011 |
RC11-5-000 | | 12/2/2011 |
RR12-3-000 | Petition for Approval of Definition and Capitalization Revisions to the NERC Rules of Procedure NERC submits a petition for approval of Definition and Capitalization Revisions to the NERC Rules of Procedure. The purposes of the proposed revisions are (1) to place all definitions of defined terms used anywhere in the ROP in a single, readily-accessible location (proposed new Appendix 2); (2) to capitalize defined terms throughout the ROP where such terms are intended to be used in their defined meanings; and (3) to lower-case other terms that are currently capitalized in the ROP but are not defined terms. Docket No. RR12-3-000 | 11/29/2011 |
RM06-16-000 | | 11/23/2011 |
RM08-13-001 | | 11/22/2011 |
RM09-25-000 | | 11/22/2011 |
RR12-2-000 | Petition of NERC for Approval of Amendments to Delegation Agreement with WECC NERC submits a petition requesting the Commission’s approval of amendments to the Amended and Restated Delegation Agreement between NERC and the Western Electricity Coordinating Council (WECC), one of the NERC Regional Entities (the WECC RDA). The proposed amendments to the WECC RDA consist of amendments to Exhibit B – the WECC Bylaws, and to Exhibit C – the WECC Regional Reliability Standards Development Procedure (RSDP). Docket No. RR12-2-000 | 11/22/2011 |
RM11-16-000 | | 11/21/2011 |
RM11-11-000 | | 11/21/2011 |
RC11-6-000 | Motion for Leave to Answer and Answer NERC submits a Motion for Leave to Answer and Answer in response to the Petition Requesting Approval of New Enforcement Mechanisms and Submittal of Initial Informational Filing Regarding NERC’s Efforts to Refocus Implementation of its Compliance Monitoring and Enforcement Program. NERC’s Answer is limited and will clarify certain concerns raised in the comments of the ISO/RTO Council (IRC). Docket No. RC11-6-000 | 11/14/2011 |
RR12-1-000 | | 11/14/2011 |
RC11-1-000, RC11-2-000 | Joint Motion for Extension of Time to Submit Compliance Filing NERC, WECC, et al. submit a joint motion for extension of time from November 14, 2011 to December 2, 2011 to allow NERC to submit a compliance filing in response to the Commission’s June 16, 2011 Order regarding the registration of Cedar Creek Wind Energy, LLC and Milford Wind Corridor Phase I, LLC. The Commission directed NERC to submit a compliance filing identifying the Reliability Standards and Requirements that will be applicable to Cedar Creek and Milford. Docket Nos. RC11-1-000 and RC11-2-000 | 11/10/2011 |
RR10-11-004 | Compliance Filng in Response to the October 7, 2011 Order NERC submits a Compliance Filing in Response to the October 7, 2011 Order. Specifically, in the October 7, 2011 Order, the Commission rejected NERC's proposal to delete Section 402.1.3.2 of the NERC Rules of Procedure; this compliance filing is made to restore Section 402.1.3.2 to the NERC Rules of Procedure. Docket No. RR10-11-004 | 11/7/2011 |
RR06-1-000, RR09-7-000 | | 10/31/2011 |
RM12-1-000 | | 10/19/2011 |
RC11-5-000 | | 10/3/2011 |
RC11-6-000 | | 9/30/2011 |
RR10-1-000 | | 9/28/2011 |
NP11-238-000 | Additional Comments in Support of NP11-238 NERC submits additional comments in support of the Notice of Penalty filed on July 28, 2011 regarding a Notice of Penalty for Southwestern Power Administration. Docket No. NP11-238-000 | 9/19/2011 |
RC11-1-000, RC11-2-000 | Joint Motion for Extension of Time NERC and WECC submit a joint motion for extension of time from September 14, 2011 to November 14, 2011 to allow NERC to submit a compliance filing in response to the Commission’s June 16, 2011 Order regarding the registration of Cedar Creek Wind Energy, LLC and Milford Wind Corridor Phase I, LLC. The Commission directed NERC to submit a compliance filing identifying the Reliability Standards and Requirements that will be applicable to Cedar Creek and Milford. Docket Nos. RC11-1-000 and RC11-2-000 | 9/13/2011 |
RD11-12-000 | | 9/9/2011 |
RM06-16-000 | | 8/31/2011 |
RR11-7-000 | | 8/24/2011 |
RM09-13-000 | | 8/11/2011 |
RR06-1-000, RR09-7-000 | | 7/29/2011 |
RR09-6-003 | | 7/26/2011 |
RM11-11-000 | | 7/21/2011 |
RM08-13-000 | | 7/21/2011 |
NP11-206-000 | | 7/20/2011 |
RC11-1-001, RC11-2-001 | | 7/18/2011 |
NP11-213-000 | | 7/15/2011 |
RM10-6-000 | | 7/13/2011 |
NP11-184-000 | | 7/8/2011 |
RM11-11-000 | | 6/30/2011 |
RM11-12-000 | | 6/27/2011 |
RM10-29-000 | | 6/24/2011 |
RD11-6-000 | | 6/21/2011 |
RM11-28-000 | | 6/15/2011 |
RR11-5-000 | | 6/13/2011 |
RM11-18-000 | Response to FERC's 5/17/11 Letter NERC submits a Response to the Commission’s May 17, 2011 Letter Requesting Additional Information Regarding NERC’s Request for Approval of Four Transmission Planning System Performance Reliability Standards. Docket No. RM11-18-000 | 6/7/2011 |
RM11-11-000 | | 6/6/2011 |
RM06-16-000 | First Quarter 2011 Compliance Filing in Response to Paragraph 629 of Order No. 693 NERC submits the First Quarter 2011 Compliance Filing of the North American Electric Reliability Corporation in Response to Paragraph 629 of Order No. 693. Order No. 693 requires that NERC provide a quarterly informational filing regarding the timeframe to restore power to the auxiliary power systems of U.S. nuclear power plants following a blackout as determined during simulations and drills of system restoration plans. This filing contains the referenced material pertaining to the first quarter of 2011. Docket No. RM06-16-000 | 5/31/2011 |
RD11-8-000 | | 5/31/2011 |
RR11-4-000 | | 5/31/2011 |
RC11-3-000 | Doc-Less Motion to Intervene in RC11-3-000 NERC submitted a doc-less Motion to Intervene regarding the Joint Petition for Authorization to Intervene in a CEA Hearing, for Expedited Consideration and for Alternative Relief. Docket No. RC11-3-000 | 5/27/2011 |
RM11-11-000 | | 5/27/2011 |
RR11-3-000 | Petition for Approval of Amendments to Delegation Agreement with NPCC, Inc. NERC submmits a petition that seeks approval of proposed amendments to NERC’s Delegation Agreement with the Northeast Power Coordinating Council, Inc. (NPCC) and approval of amendments to NPCC’s Bylaws and Regional Reliability Standards Development Procedure (included in Exhibits B and C to the Delegation Agreement) as “Regional Entity Rules.” Docket No. RR11-3-000 | 5/25/2011 |
RR11-2-000 | Petition for Approval of CMEP Agreement Between NPCC and WECC and Related Amendment to Delegation Agreements NERC submits a petition that seeks approval of (1) an Agreement Between Northeast Power Coordinating Council [NPCC] and Western Electricity Coordinating Council [WECC] Concerning Compliance Monitoring and Enforcement of WECC Registered Functions, (2) to the extent necessary, an Agreement between NERC and WECC concerning termination of their existing Agreement Concerning Compliance Monitoring and Enforcement of WECC Registered Functions, and (3) related amendments to the Delegation Agreements between NERC and NPCC and NERC and WECC. Docket No. RR11-2-000 | 5/25/2011 |
RM11-12-000 | | 5/17/2011 |
RR10-12-001 | | 5/17/2011 |
RM05-17-000, RM05-25-000, RM06-16-000 | | 5/13/2011 |
NP11-181-000 | | 5/11/2011 |
AD11-8-000 | Comments in Response to LBNL's Frequency Response Report NERC submits comments in response to the January 20, 2011 release of the FERC-sponsored report prepared by the Lawrence Berkeley National Laboratory on the Use of Frequency Response Metrics to Assess the Planning and Operating Requirements for Reliable Integration of Variable Renewable Generation and its five supporting papers. Docket No. AD11-8-000 | 5/6/2011 |
RM06-16-000, RD10-14-000 | | 5/6/2011 |
RR06-1-000, RR09-7-000 | | 5/2/2011 |
RD11-7-000 | | 4/29/2011 |
RM06-16-009, RM11-18-000 | | 4/26/2011 |
RR11-1-000, RR11-1-001 | | 4/21/2011 |
RM10-15-000 | | 4/18/2011 |
RM10-16-000 | | 4/18/2011 |
NP10-18-002 | Request for for Clarification, or, in the Alternative, Rehearing and Motion To Intervene Out-Of-Time of FRCC, MRO, NPCC, SPP RE and Texas RE - NP10-18 NERC, FRCC, MRO, NPCC, SPP RE, Texas RE and WECC submit a Request for Clarification, or, in the Alternative, Rehearing and Motion to Intervene Out-Of-Time of FRCC, MRO, NPCC, SPP RE and Texas RE under Docket No. NP10-18-002. | 4/18/2011 |
RM11-23-000 | | 4/15/2011 |
RD11-5-000 | Petition for Approval of Interpretations to Reliability Standard PRC-004-1 and PRC-005-1 NERC submits a Petition for Approval of Interpretations of Requirements R1 and R3 to Reliability Standard PRC-004-1— Analysis and Mitigation of Transmission and Generation Protection System Misoperations and Requirements R1 and R2 to Reliability Standard PRC-005-1 — Transmission and Generation Protection System Maintenance and Testing. Docket No. RD11-5-000 | 4/15/2011 |
RM11-11-000, RM06-22-000 | | 4/13/2011 |
RM06-22-000 | | 4/12/2011 |
RM11-2-000 | | 4/8/2011 |
RM05-17-000 , RM05-25-000, RM06-16-000 | | 4/5/2011 |
NP11-162-000 | | 4/4/2011 |
RM06-16-009, RM11-18-000 | | 3/31/2011 |
RM11-20-000 | | 3/31/2011 |
RM11-19-000 | | 3/30/2011 |
AD11-6-000 | | 3/21/2011 |
RD10-6-000, RD09-7-002 | | 3/21/2011 |
RR08-4-000, RR08-4-001, RR08-4-002, RR08-4-005 | | 3/21/2011 |
RM08-13-000 | Petition for Approval of a Protection and Control (PRC) Reliability Standard PRC-023-2 NERC submits a petition for approval of PRC-023-2 – Transmission Relay Loadability. NERC also requests FERC approval of a proposed addition to the NERC Rules of Procedure, Section 1700 – Challenges to Determinations. This filing satisfies certain directives the Commission issued in Order No. 733 pertaining to developing modifications to PRC-023-1. Docket No. RM08-13-000 | 3/18/2011 |
NP11-114-000 | | 3/18/2011 |
NP11-128-000 | | 3/18/2011 |
RR09-7-000, AD10-14-000 | Informational Filing in Response to FERC's September 16, 2010 Order Regarding NERC's Three Year Performance Assessment NERC submits an Informational Filing in Response to FERC's September 16, 2010 Order regarding NERC's Three Year ERO Performance Assessment Report. The September 16, 2010 Order contained a number of specific directives and other actions that NERC was to address in an informational filing to be submitted within six months. NERC is commenting on or providing current information concerning its activities with respect to a number of the areas of additional guidance. Docket Nos. RR09-7-000 and AD10-14-000 | 3/16/2011 |
RM10-11-000 | | 3/2/2011 |
RM06-16-000 | | 2/28/2011 |
RM10-5-000 | | 2/25/2011 |
RM09-9-000 | | 2/22/2011 |
RD10-4-000 | | 2/22/2011 |
RM09-13-000 | | 2/22/2011 |
RR10-11-000 | Compliance Filing in Response to October 21, 2010 Order NERC submits a compliance filing including revised pro forma delegation agreement, revised Sections 100-1600 of the ROP, revised Appendix 4A to the ROP and revised Appendix 4C to the ROP. This filing responds to an October 21, 2010 Order ordering that further revisions be made to the pro forma and individual Delegation Agreements, to certain provisions of the ROP, to the Bylaws of FRCC and MRO, and certain additional explanatory information. Docket No. RR10-11-000 | 2/18/2011 |
RM10-29-000 | | 2/14/2011 |
RM11-4-000 | | 2/11/2011 |
RM11-11-000 | | 2/10/2011 |
RM10-8-000 | | 2/7/2011 |
RR06-1-000, RR09-7-000 | | 1/31/2011 |
RM08-19-000, RD11-3-000 | | 1/28/2011 |
RM08-19-000 | | 1/26/2011 |
RM10-15-000 | | 1/24/2011 |
RM10-16-000 | | 1/24/2011 |
RR10-13-002 | | 1/24/2011 |
RM08-19-000 | | 1/14/2011 |
RM06-16-000 | | 1/13/2011 |
RM09-19-000 | | 1/11/2011 |
RR09-6-000 | | 1/11/2011 |
RR10-7-001, RR10-11-000 | Compliance Filing in Response to FERC Orders on CMEP Agreements with SERC, FRCC, and SPP RE NERC submits a Compliance Filing in Response to the July 12, 2010 and December 1, 2010 Commission Orders Relating to Compliance Monitoring and Enforcement Agreements Between SERC Reliability Corporation and Florida Reliability Coordinating Council and Southwest Power Pool Regional Entity and Related Amendments To Delegation Agreementsl. Docket Nos. RR10-7-001 and RR10-11-000. | 1/10/2011 |
RR09-6-003 | | 1/10/2011 |
RM10-10-000 | | 1/10/2011 |
RM08-11-002, RM08-11-003 | | 1/6/2011 |
RC11-1-000, RC11-2-000 | | 12/28/2010 |
RM10-10-000 | Comments of NERC in Support of RFC's Comments in Response to NOPR NERC provides comments in response to FERC's Notice of Proposed Rulemaking regarding the Planning Resource Adequacy Analysis, Assessment, and Documentation Reliability Standard developed by ReliabilityFirst Corporation and filed by NERC for approval. Docket No. RM10-10-000 | 12/27/2010 |
RR09-6-000 | | 12/23/2010 |
RR10-1-001 | | 12/23/2010 |
RR09-7-000, RR10-11-000 | | 12/23/2010 |
RR06-1-022, RR07-7-008 | | 12/23/2010 |
RR10-13-000 | | 12/17/2010 |
RM09-19-000 | Motion for Extension of Time to Submit Comments NERC files a motion for extension of time from December 28, 2010 to January 11, 2011 (14 days) to submit comments in response to FERC's October 21, 2010 NOPR on IRO-006-WECC-1. Docket No. RM09-19-000 | 12/17/2010 |
AD11-1-000 | | 12/9/2010 |
RC11-1-000 | Motion to Intervene and Comments of NERC Regarding the Cedar Creek Compliance Registry Appeal On October 27, 2010, Cedar Creek Wind Energy, LLC filed an appeal of the October 6, 2010 decision rendered by the NERC Board of Trustees Compliance Committee to include Cedar Creek on the NERC Compliance Registry within the WECC Region for the functions of Transmission Owner and Transmission Operator. NERC files a motion to intervene and provides comments on the proceeding. Docket No. RC11-1-000 | 12/7/2010 |
RC11-2-000 | | 12/7/2010 |
NP11-3-000, NP11-5-000 | | 12/3/2010 |
NP10-149-000 | | 12/2/2010 |
RM06-16-000 | | 12/1/2010 |
RR10-12-000 | | 12/1/2010 |
RM08-19-002 | Compliance Filing in Response to Paragraph 274 Of Order No. 729 NERC files a Compliance Filing Of The North American Electric Reliability Corporation In Response To Paragraph 274 Of Order No. 729 - Violation Risk Factors And Violation Severity Levels For Available Transfer Capability Reliability Standards. Docket No. RM08-19-002 | 12/1/2010 |
RR08-4-006 | | 12/1/2010 |
NP10-140-000 | | 12/1/2010 |
RM06-16-000 | Third Quarter 2010 Compliance Filing in Response to Order 693 NERC provides a quarterly informational filing regarding the timeframe to restore power to the auxiliary power systems of U.S. nuclear power plants following a blackout as determined during simulations and drills of system restoration plans. This filing contains the referenced material pertaining to the third quarter of 2010. Docket No. RM06-16-000 | 11/30/2010 |
RM08-12-000 | | 11/22/2010 |
NP10-160-000 | | 11/17/2010 |
RR09-6-000 | | 11/9/2010 |
NP10-149-000 | | 11/8/2010 |
RR10-1-001 | | 10/29/2010 |
NP10-160-000 | | 10/28/2010 |
NP10-179-000 | | 10/27/2010 |
NP10-168-000 | | 10/27/2010 |
NP10-171-000 | | 10/27/2010 |
RM06-16-000 | | 10/26/2010 |
RM06-16-011 | Compliance Filing of NERC in Response to the FERC May 13 Order Granting Rehearing for Further Consideration and Scheduling Technical Conference
NERC submits this compliance filing in response to the FERC Order Granting Rehearing for Further Consideration and Scheduling Technical Conference issued on May 13, 2010. Docket No. RM06-16-011
| 10/25/2010 |
NP10-140-000 | | 10/21/2010 |
RM06-16-000 | 2010 Long-Term Reliability Assessment The North American Electric Reliability Corporation (NERC) submits solely as an informational filing the 2010 Long-Term Reliability Assessment; a report prepared by NERC, released on October 20, 2010. Docket No. RM06-16-000 | 10/20/2010 |
RM06-22-000 | | 10/15/2010 |
RM06-16-010, RM06-16-011 | | 10/14/2010 |
NP10-160-000 | Supplemental Information Regarding Omnibus II NERC submits supplemental information regarding the Western Electricity Coordinating Council Reliability Coordinator violations that were included in the September 13, 2010 Omnibus II filing under the name of NERC as Compliance Enforcement Authority. Docket No. NP10-160-000 | 10/8/2010 |
NP10-149-000 | | 10/6/2010 |
NP10-20-000 | Order on Notice of Penalty - September 30, 2010 The Commission issued an Order stating that it would not further review, on its own motion, the December 30, 2009 Notice of Penalty regarding Duke Energy Corporation. Docket No. NP10-20-000 | 9/30/2010 |
RR010-6 -000 | | 9/24/2010 |
NP10-149-000 | | 9/16/2010 |
RM06-22-014 | | 9/9/2010 |
RD10-15-000 | Petition for Approval of Proposed Modifications to six Reliability Standards NERC submits a petition seeking approval of proposed modifications contained in six Reliability Standards (BAL-002-1 Disturbance Control Performance; EOP-002-3 Capacity and Energy Emergencies; FAC-002-1 Coordination of Plans for New Generation, Transmission, and End-User Facilities; MOD-021-2 Documentation of the Accounting Methodology for the Effects of Demand-Side Management in Demand and Energy Forecasts; PRC-004-2 Analysis and Mitigation of Transmission and Generation Protection System Misoperations; and VAR-001-2 Voltage and Reactive Control). Docket No. RD10-15-000 | 9/9/2010 |
NP10-141-000 | | 9/8/2010 |
NP10-140-000 | | 9/8/2010 |
RD10-14-001 | Second Quarter 2010 Compliance Filing in Response to Order 693 NERC provides a quarterly informational filing regarding the timeframe to restore power to the auxiliary power systems of U.S. nuclear power plants following a blackout as determined during simulations and drills of system restoration plans. This filing contains the referenced material pertaining to the second quarter of 2010. Docket No. RD10-14-001 | 8/31/2010 |
NP10-149-000 | | 8/25/2010 |
RR10-13-000 | | 8/24/2010 |
RM09-25-000 | | 8/23/2010 |
NP10-143-000 | | 8/23/2010 |
RM09-13-000 | | 8/20/2010 |
AD10-14-000 | Supplemental Comments Following July 6 Technical Conference NERC submits these supplemental comments following the July 6, 2010 technical conference. NERC filed comments on July 26, 2010 that responded to a number of issues raised during the July 6 technical conference. These supplemental comments provide NERC’s views after the conclusion of those discussions. Docket No. AD10-14-000 | 8/20/2010 |
NP10-140-000, NP10-141-000 | | 8/18/2010 |
RR10-7-000 | | 8/6/2010 |
RR10-7-000 | | 8/6/2010 |
RM06-16-000 | | 8/2/2010 |
RM06-16-000 | | 7/27/2010 |
NP10-119-000 | | 7/27/2010 |
AD10-14-000 | | 7/26/2010 |
RR10-11-000 | | 7/26/2010 |
NP10-133 | | 7/23/2010 |
NP10-140-000 | | 7/19/2010 |
RM08-13-000 | | 7/16/2010 |
RM10-29-000 | | 7/16/2010 |
RR06-1-024, RR07-8-004, RR07-8-005 | | 6/30/2010 |
RR06-1-025, RR07-3-004, RR07-3-005 | | 6/30/2010 |
NP10-115-000 | | 6/25/2010 |
NP10-110 | | 6/21/2010 |
RR10-11-000 | | 6/17/2010 |
PL10-4-000 | | 6/14/2010 |
RR10-12-000 | | 6/10/2010 |
RR010-11-000 | | 6/9/2010 |
RM06-16-000 | First Quarter 2010 Compliance Filing in Response to Order No. 693 NERC submits a quarterly informational filing regarding the timeframe to restore power to the auxiliary power systems of U.S. nuclear power plants following a blackout as determined during simulations and drills of system restoration plans. This filing includes information from 4th Quarter 2009. Docket No. RM06-16-000 | 6/1/2010 |
RR08-6-000 | | 6/1/2010 |
RM09-15-000 | | 5/24/2010 |
NP10-100-000 | | 5/19/2010 |
NP10-100-000 | | 5/18/2010 |
RM06-22-008 | | 5/17/2010 |
RR09-7-000 | | 5/13/2010 |
RR10-9-000 | | 5/11/2010 |
RM09-18-000 | | 5/10/2010 |
RM06-16-000, RM10-6-000 | | 5/10/2010 |
RR08-4-000, RR08-4-001, RR08-4-002 | Supplemental Information Regarding the March 5, 2010 Filing on Violation Severity Levels NERC submits a letter incorporating by reference the informational filing it submitted on August 10, 2009 with the March 5, 2010 “Compliance Filing of the North American Electric Reliability Corporation in Response to the Order on Violation Severity Levels Proposed by the Electric Reliability Organization and Request for an Extension of Time”. Docket Nos. RR08-4-000, RR08-4-001 and RR08-4-002 | 5/5/2010 |
RR09-9-000, RR07-14-004, RR08-6-004 | | 5/3/2010 |
RM09-13-000 | | 4/28/2010 |
RR09-9-000, RR08-6-004, RR07-14-004, RR10-9-000 | | 4/22/2010 |
RR10-1-000 | | 4/21/2010 |
RD10-12-000 | | 4/21/2010 |
RD10-11-000 | | 4/21/2010 |
NP10-20-000 | | 4/21/2010 |
RM06-16-009, RM06-16-012 | | 4/20/2010 |
RD10-13-000 | | 4/20/2010 |
RM08-13-000 | | 4/19/2010 |
RM06-16-011 | | 4/19/2010 |
RM08-13-001 | | 4/19/2010 |
RM06-16-012 | | 4/19/2010 |
RR09-6-000 | | 4/19/2010 |
RR10-7-000 | | 4/16/2010 |
RM10-11-000 | | 4/12/2010 |
NP10-89-000 | | 4/12/2010 |
RR10-6-000 | | 4/12/2010 |
NP10-86-000 | | 4/9/2010 |
RM10-9-000 | | 3/29/2010 |
NP10-18-000 | | 3/18/2010 |
RR10-8-000 | | 3/16/2010 |
RR10-8-000 | | 3/15/2010 |
NP10-60-000 | | 3/12/2010 |
RR010-7 -000 | | 3/10/2010 |
RR08-4-000, RR08-4-001, RR08-4-002, RR08-4-005 | | 3/5/2010 |
RM06-16-000 | Fourth Qtr. 2009 Compliance Filing in Response to Order No. 693 NERC submits a quarterly informational filing regarding the timeframe to restore power to the auxiliary power systems of U.S. nuclear power plants following a blackout as determined during simulations and drills of system restoration plans. This filing includes information from 4th Quarter 2009. Docket No. RM06-16-000 | 3/1/2010 |
RR08-4-000, RR08-4-001, RR08-4-002 | | 2/26/2010 |
NP10-40-000 | | 2/26/2010 |
NP10-37-000 | | 2/25/2010 |
NP10-48-000 | | 2/25/2010 |
NP10-18-000 | | 2/24/2010 |
RR010-6-000 | | 2/19/2010 |
NP10-20-000 | | 2/16/2010 |
NP10-25-000 | | 2/16/2010 |
ER08-1281-004 | Motion to Intervene in NYISO Report on Broader Regional Markets NERC motions to intervene in the proceeding of the NYISO Report on Broader Regional Markets; Long-Term Solutions to Lake Erie Loop Flow, filed with the Commission on January 12, 2010. The report includes proposed regional market solutions predicated on NERC actions. Docket No. ER08-1281-004. | 2/2/2010 |
RR06-1-000 | | 1/29/2010 |
RR08-4-000, RR08-4-001, RR08-4-002 | Motion for a Brief Extension of Time NERC submits a Motion for a Brief Extension of Time from March 1, 2010 to March 5, 2010, to allow it to submit a compliance filing in response to FERC’s June 19, 2008 Order and November 20, 2008 Order. Docket Nos. RR08-4-000, RR08-4-001, RR08-4-002 | 1/26/2010 |
NP10-18-000 | | 1/26/2010 |
RM06-22-011 | Compliance Filing in Response to December 17, 2009 FERC Order Regarding Scope of Systems NERC submits this compliance filing in response to the December 17, 2009 Order requiring NERC to submit additional information that will allow FERC to evaluate its approval of NERC’s CIP Version 1 Implementation Plan for nuclear power plant GOs and GOPs. FERC also directed NERC to incorporate into the Implementation Plan the implementation of Version 2 of the CIP standards by nuclear power plants on the same schedule established for Version 1. Docket No. RM06-22-011. | 1/19/2010 |
RR09-9-002, RR07-14-006, RR08-6-006 | | 1/11/2010 |
RM10-15-000 | | 12/31/2009 |
RM10-16-000 | | 12/31/2009 |
RD09-7-002 | Compliance Filing in Response to the September 30, 2009 Order NERC submits a compliance filing in response to the Commission's September 30, 2009 Order Approving Revised Reliability Standards for Critical Infrastructure Protection. The filing includes: (1) request for approval of Version 3 of the CIP Reliability Standards; (2) revised Implementation Plan for Newly Identified Critical Cyber Assets and Newly Registered Entities and the Implementation Plan for Version 3 of the Cyber Security Standards CIP-002-3 through CIP-009-3 that addresses FERC's directives in the Version 2 CIP Order; and (3) an update of the timetable that reflects the plan to address the remaining FERC directives from Order No. 706. Docket No. RD09-7-002 | 12/29/2009 |
RM06-16-000, RD10-8-000 | | 12/22/2009 |
RM08-19-002, RM09-5-002, RM06-16-008 | Request for Clarification of Order No. 729 NERC requests clarification of the Commission’s November 24, 2009 Order No. 729 which approved modifications to six Modeling, Data, and Analysis (MOD) Reliability Standards and directed that modifications be made to the MOD Reliability Standards to make the processes to calculate available transfer capability and its various components more transparent. Docket Nos. RM08-19-002, RM09-5-002, and RM06-16-008. | 12/22/2009 |
RD10-7-000, RM08-3-000 | Compliance Filing in Response to FERC Order 716- Revised VRFs NERC submits this filing in compliance with paragraphs 143, 156, 164, 168, 173, 179 and 187 of the FERC Order No. 716 that required NERC to revise VRFs for the NUC-001-1 — Nuclear Plant Interface Coordination Reliability Standard, Requirements R2 (from Lower to Medium), R4, R5, R7, and R8 (Medium to High), and R9 (Lower to Medium). Docket No. RD10-7-000, RM08-3-000 | 12/18/2009 |
RD10-6-000 | Petition for Approval of VSLs and VRFs to CIP Version 2 Reliability Standards NERC submits a petition seeking approval of Violation Severity Level (“VSL”) assignments for approved Reliability Standards: CIP-002-2, CIP-003-2, CIP-004-2, CIP-005-2, CIP-006-2, CIP-007-2, CIP- 008-2, and CIP-009-2, and for Violation Risk Factors (“VRFs”) for CIP-003-2 and CIP- 006-2. Docket Nos. RD10-6-000 | 12/18/2009 |
RM10-10-000 | | 12/14/2009 |
RR08-6-005, RR07-14-005, RR09-9-001 | | 12/11/2009 |
AD09-10-000 | | 12/4/2009 |
RM05-17-000, RM05-25-000, RM06-16-000 | | 12/2/2009 |
RD10-5-000 | | 12/2/2009 |
RR09-4-001 | | 12/1/2009 |
RR10-5-000 | Petition for Approval of Proposed Revisions to SPP Bylaws NERC submits a petition for approval of proposed revisions to the Bylaws of Southwest Power Pool, Inc.” This petition seeks approval of proposed amendments to Section 9.7.1 of the Bylaws of Southwest Power Pool, Inc., as “Regional Entity Rules.” Docket No. RR10-5-000 | 12/1/2009 |
RM06-16-000 | | 11/30/2009 |
RM10-8-000 | Petition for Approval of Interpretations for TOP-005-1.1 and IRO-005-2 NERC submits a petition seeking approval for interpretations of Requirement R3 in FERC-approved NERC Reliability Standard TOP-005-1.1 — Operational Reliability Information, and Requirement R12 of FERC-approved NERC Reliability Standard IRO-005-2 — Reliability Coordination - Current Day Operations. Docket No. RM10-8-000 | 11/24/2009 |
RR10-4-000 | | 11/23/2009 |
RR09-9-000, RR08-6-004, RR07-14-004 | Informational Filing on SAFNR Project NERC submits an Informational Filing in compliance with Paragraph 64 of FERC's October 15, 2009 Order. Paragraph 64 directed NERC to submit, by November 20, 2009, an “informational report . . . include[ing] a discussion about the ongoing and future plans to develop the SAFNR project and identify[ing] the resources that will be required to meet NERC and regional objectives. Docket Nos. RR09-9-000, RR08-6-004, RR07-14-004 | 11/20/2009 |
RD10-9-000 | Petition for Approval of Corrected Reliability Standard FAC-010-2 NERC submits a petition of approval of an errata to correct two misnumbered requirements referenced in the WECC Regional Differences portion of the NERC Reliability Standard FAC-010-2 — System Operating Limits Methodology for the Planning Horizon. Docket No. RD10-9-000 | 11/20/2009 |
RD10-4-000 | | 11/20/2009 |
RM06-16-000, RM06-16-007, RM10-5-000 | | 11/17/2009 |
RM06-16-000, RM10-6-000 | | 11/17/2009 |
RD10-3-000 | | 11/17/2009 |
RR10-2-000 | | 11/12/2009 |
RR10-3-000 | Petition for Approval of Amendments to NERC's ROP NERC submits a petition requesting approval of several amendments to NERC’s Rules of Procedure (ROP), for the purpose of reflecting the termination of the NERC Reliability Readiness Evaluation and Improvement Program. Docket No. RR10-3-000 | 11/12/2009 |
NP10-2-000 | | 11/11/2009 |
NP10-2-000 | | 11/5/2009 |
RR06-1-000 | | 11/2/2009 |
RR10-1-000 | Petition for Approval of Amendments to NERC ROP Section 412 and Appendix 4D NERC submits a Petition for Approval of Amendments to the Rules of Procedure of the North American Electric Reliability Corporation — New Section 412 and Appendix 4D, “Procedure for Requesting and Receiving Technical Feasibility Exceptions to NERC Critical Infrastructure Protection Standards.” Docket No. RR10-1-000 | 10/29/2009 |
RM06-16-000 | Comments on the BPS TIER Report NERC submits comments on the Topological and Impedance Element Ranking (TIER) of the Bulk Power System Preliminary Report. Docket No. RM06-16-000 | 10/28/2009 |
RM08-12-000 | Compliance Filing in Response to Order No. 723, Proposed VSLs for WECC Regional Reliability Standard NERC submits a Compliance filing in response to paragraphs 26 and 54 of Order No. 723: Proposed VSLs for Regional Reliability Standard BAL-004-WECC-01, Automatic Time Error Correction Requirements R2 through R4 and Request for an Extension of Time for the filing of the VSL for Requirement R1 and, in the alternative, approval of the proposed Binary VSL for Requirement R1, filed today with FERC. Docket No. RM08-12-000. | 10/23/2009 |
NP09- 26-000 | Answer to U.S. Department of Energy's Motion for Stay NERC responds to the October 7, 2009 United States Department of Energy Motion for Stay in the jurisdictional issue involving Section 215 of the FPA and NERC's jurisdiction over federal entities. Docket No. NP09- 26-000 | 10/22/2009 |
RM06-16-000 | Motion for an Extension of Time NERC submits a Motion for an Extension of Time from October 13, 2009 to October 28, 2009 to allow it to submit comments in response to FERC’s September 10, 2009 Notice requesting comments on the Topological and Impedance Element Ranking (“TIER”) Report. Docket No. RM06-16-000 | 9/30/2009 |
RM09-25-000 | | 9/30/2009 |
RM06-16-000 | | 9/23/2009 |
RC09-3-000 | | 9/21/2009 |
RR09-7-000 | NERC Answer to Comments on Three-Year ERO Performance Assessment Report NERC submits an Answer to the comments filed by interested entities on NERC’s Three-Year Electric Reliability Organization Performance Assessment Report (Three-Year ERO Report or Report) that NERC filed with the Commission on July 20, 2009, pursuant to 18 C.F.R. §39.3(c). Docket No. RR09-7-000 | 9/18/2009 |
RR09-9-000, RR07-14-004, RR08-6-004 | Notice of Corrections to 2010 Business Plan and Budget Filing NERC notifies the Commission and the parties to this proceeding of the following two corrections to NERC’s 2010 Business Plan and Budget filing that was submitted to the Commission on August 24, 2009. Docket Nos. RR09-9-000, RR07-14-004 and RR08-6-004 | 9/18/2009 |
RM06-22-000 | | 9/15/2009 |
RR08-4-000, RR08-4-001, RR08-4-002 | Motion for an Extension of Time NERC submits a Motion for an Extension of Time from September 18, 2009 to March 1, 2010 to allow it to submit a compliance filing in response to FERC’s June 19, 2008 Order and November 20, 2008 Order. Docket Nos. RR08-4-000, RR08-4-001, RR08-4-002 | 9/14/2009 |
RR09-9-000, RR07-14-004, RR08-6-004 | | 9/14/2009 |
NP09-26-000 | | 9/8/2009 |
RM06-16-000 | | 8/31/2009 |
RM08-12-000 | Compliance Filing in Response to Order No. 723 NERC submits this filing in compliance with the directives in paragraphs 26 and 51 of the FERC May 21, 2009 Order No. 723. This filing includes modifications to the“WECC VRFs for the BAL-004-WECC-01 Regional Reliability Standard as specified by FERC. Docket No. RM08-12-000 | 8/28/2009 |
RR08-6-004, RR07-14-004, RR09-9-000 | | 8/24/2009 |
RM08-13-000 | | 8/17/2009 |
RM08-3-000 | | 8/14/2009 |
RD09-9-000 | | 8/12/2009 |
RM08-11-000, RR08-4-000, RR07-9-000, RR07-10-000 | | 8/10/2009 |
RR09-8-000 | | 8/6/2009 |
RR08-6-000 | | 8/6/2009 |
RR06-1-000 | | 7/31/2009 |
RR06-1-021, RR07-1-005, RR07-2-005, RR07-3-006, RR07-4-005, RR07-5-006, RR07-6-007, RR07-7-007, RR07-8-006 | Compliance Filing In Response to June 1, 2009 FERC Order NERC hereby submits a compliance filing in response to the Commission’s June 1, 2009 Order regarding a revised NERC uniform (CMEP) document, Attachment 4C to the NERC Rules of Procedure. Docket Nos. RR06-1-021, RR07-1-005, RR07-2-005, RR07-3-006, RR07-4-005, RR07-5-006, RR07-6-007, RR07-7-007, RR07-8-006 | 7/30/2009 |
RR09-7-000 | NERC Three-Year Assessment NERC hereby submits its “Three-Year Electric Reliability Organization Performance Assessment Report,” in accordance with the requirements of the Commission’s regulations at 18 C.F.R. §39.3(c). Docket No. RR09-7-000 | 7/20/2009 |
RM08-11-000 | Compliance Filing in Response to Order No. 722 NERC submits this filing in compliance with the directives in paragraphs 99 and 100 of the Federal Energy Regulatory Commission’s (“FERC” or the “Commission”) March 20, 2009 Order (“Order No. 722”) in Docket No. RM08-11-000. This filing regards the WECC proposed VRFs for the WECC Regional Difference Requirements to the Reliability Standards. Docket No. RM08-11-000
| 7/6/2009 |
RM06-22-002, RM06-22-003 | | 6/30/2009 |
RM06-22-000 | | 6/30/2009 |
RR06-1-012, RR07-7-002 | Delegation Agreement Between NERC and WECC NERC and WECC submit a status report in response to Paragraph 230 of the Commission's March 21, 2008 Order regarding WECC's justification for its proposed deviation from the NERC pro forma hearing procedures regarding omission of NERC’s shortened hearing procedure from the WECC hearing procedure. Docket Nos. RR06-1-012 and RR07-7-002. | 6/29/2009 |
RM08-7-000, RM08-7-001 | Compliance Filing in Response to FERC Order 713-A NERC submits a filing in compliance with the directives in paragraphs 14, 59 and 72 of the Commission's March 21, 2009 Order No. 713-A. This filing includes revisions to VRFs for Reliability Standard IRO-006-4, regarding interchange and transmission loading relief. Docket Nos. RM08-7-000 and RM08-7-001 | 6/22/2009 |
NP09-21-000 | Response of NERC and MRO to FERC's May 29, 2009 Order NERC and the Midwest Reliability Corporation (MRO) submit a response to the Commission's May 29, 2009 Order regarding NERC's May 1, 2009 Notice of Penalty filing regarding Wisconsin Public Service Corporation (WPSC) in the MRO Region. Docket No. NP09-21-000 | 6/18/2009 |
RM09-19-000 | | 6/17/2009 |
RR09-5-000 | | 6/8/2009 |
RC09-3-000 | | 6/5/2009 |
RC09-2-000 | NERC 2009 Summer Reliability Assessment NERC submits solely as an informational filing the 2009 Summer Reliability Assessment that was prepared by NERC and released on May 19, 2009. Docket No. RC09-2-000 | 6/4/2009 |
RM06-16-000 | | 6/1/2009 |
RM08-11-000 | | 5/29/2009 |
RM08-11-000 | | 5/29/2009 |
RM08-19-000, RM08-19-001, RM09-5-000, RM06-16-005 | Comments in Response to ATC Reliability Standards NOPR NERC submits comments in response to the Commission's NOPR regarding Mandatory Reliability Standards for the Calculation of Available Transfer Capability, Capacity Benefit Margins, Transmission Reliability Margins, Total Transfer Capability, and Existing Transmission Commitments and Mandatory Reliability Standards for the Bulk-Power System. Docket Nos. RM08-19-000, RM08-19-001, RM09-5-000, and RM06-16-005. | 5/26/2009 |
RM06-22-000, RD09-7-000 | | 5/22/2009 |
RR09-4-000 | | 5/21/2009 |
RC08-7-001 | | 5/12/2009 |
PL09-4-000 | | 5/11/2009 |