Reliability Standard Audit Worksheets (RSAWs)
 
expand Header : Archived RSAWs ‎(6)
2011 RSAWs.zip2011 Complete SetReliability Standard Audit Worksheet - Complete Set for 2011 Actively Monitored List1/25/2011
2013 RSAWs.zip2013 Complete SetReliability Standard Audit Worksheet - Complete Set for 2013 Actively Monitored List1/10/2014
Reliability Standard Audit Worksheet - Complete set for 2019 Actively Monitored list.zip2019 Complete SetReliability Standard Audit Worksheet - Complete set for 2019 Actively Monitored list 6/18/2019
expand Header : Current RSAWs for Use ‎(177)
RSAW BAL-001-2_2016_v1.docxBAL-001-2Real Power Balancing Control Performance5/16/2016
RSAW BAL-002-2(i)_2014_v6.docxBAL-002-2(i)Disturbance Control Performance - Contingency Reserve for Recovery from a Balancing Contingency Event8/22/2018
RSAW BAL-003-1.1_2018_v1.docxBAL-003-1.1Frequency Response and Bias Settings3/22/2018
RSAW BAL-005-0.2b May 2013.docxBAL-005-0.2b Automatic Generation Control5/20/2013
RSAW BAL-006-2 September 2011.docxBAL-006-2Inadvertent Interchange10/16/2011
RSAW CIP-003-8_2019_v1.docxCIP-003-8Cyber Security — Security Management Controls3/12/2020
RSAW CIP-005-5_2015_v1.docxCIP-005-5Cyber Security - Electronic Security Perimeter(s)5/8/2015
RSAW CIP-006-6_2015_v1.docxCIP-006-6Cyber Security - Physical Security of BES Cyber Systems11/3/2020
RSAW CIP-008-5_2015_v1.docxCIP-008-5Cyber Security - Incident Reporting and Response Planning5/8/2015
RSAW CIP-009-6_2015_v1.docxCIP-009-6Cyber Security - Recovery Plans for BES Cyber Systems5/8/2015
RSAW CIP-010-3_2020_v1.docxCIP-010-3Cyber Security – Configuration Change Management and Vulnerability Assessments4/1/2020
RSAW_CIP-013-1_2020_v1.docxCIP-013-1CIP-013-1 – Cyber Security – Supply Chain Risk Management4/1/2020
RSAW COM-001-2.1_2015_v2.docxCOM-001-2.1Communications5/24/2017
RSAW COM-002-4_2016_v3.docxCOM-002-4Operating Personnel Communications Protocols2/19/2016
RSAW EOP-002-3.1_March_ 2014.docxEOP-002-3.1Capacity and Energy Emergencies3/20/2014
RSAW EOP-004-2_2013_v1.docxEOP-004-2Event Reporting10/15/2013
RSAW EOP-004-4_2018_v1.docxEOP-004-4Event Reporting9/27/2018
RSAW EOP-005-3_2018_v1.docxEOP-005-3System Restoration from Blackstart Resources 11/2/2018
RSAW EOP-006-3_2018_v2.docxEOP-006-3System Restoration Coordination6/19/2019
RSAW EOP-008-2_2018_v1.docxEOP-008-2Loss of Control Center Functionality 11/2/2018
RSAW EOP-011-1_2016_v3.docxEOP-011-1Emergency Operations12/19/2016
RSAW FAC-001-2_2014_v2.docxFAC-001-2Facility Interconnection Requirements11/23/2015
RSAW FAC-002-1 September 2011.docxFAC-002-1Coordination of Plans for New Generation, Transmission, and End-User Facilities10/16/2011
RSAW FAC-002-3_2021_v1.docxFAC-002-3Facility Interconnection Studies3/18/2021
RSAW FAC-008-5_2021_v1.docxFAC-008-5Facility Ratings9/20/2021
RSAW FAC-010-3_2016_v2.docxFAC-010-3System Operating Limits Methodology for the Planning Horizon12/19/2016
RSAW FAC-011-3_2017_v2.docxFAC-011-3System Operating Limits Methodology for the Operations Horizon1/20/2017
RSAW FAC-014-2 January 2011.docxFAC-014-2Establish and Communicate System Operating Limits1/25/2011
RSAW INT-006-4_2014_v1.docxINT-006-4Evaluation of Interchange Transactions8/29/2014
RSAW INT-009-2.1_2018_v1.docxINT-009-2.1Implementation of Interchange2/26/2018
RSAW INT-010-2.1_2018_v1.docxINT-010-2.1Interchange Initiation and Modification for Reliability2/26/2018
RSAW IRO-001-1.1 (January 2011).docxIRO-001-1.1Reliability Coordination - Responsibilities and Authorities1/25/2011
RSAW IRO-002-2_March 2014.docIRO-002-2Reliability Coordination - Facilities3/20/2014
RSAW IRO-002-5_2016_v3.docxIRO-002-5Reliability Coordination – Monitoring and Analysis6/28/2017
RSAW IRO-002-7_2021_v1.docxIRO-002-7Reliability Coordination – Monitoring and Analysis3/18/2021
RSAW IRO-004-2 (September 2011).docxIRO-004-2Reliability Coordination - Operations Planning10/16/2011
RSAW IRO-006-5 (September 2011).docxIRO-006-5Reliability Coordination - Transmission Loading Relief10/16/2011
RSAW IRO-008-1 (September 2011).docxIRO-008-1Reliability Coordinator Operational Analyses and Real-time Assessments10/16/2011
RSAW IRO-009-2_2015_v2.docxIRO-009-2Reliability Coordinator Actions to Operate Within IROLs12/22/2015
RSAW IRO-010-2.docxIRO-010-2 Reliability Coordinator Data Specification and Collection10/13/2016
RSAW IRO-014-1 (January 2011).docxIRO-014-1Procedures, Processes, or Plans to Support Coordination Between Reliability Coordinators10/13/2012
RSAW IRO-015-1 (January 2011).docxIRO-015-1Notifications and Information Exchange Between Reliability Coordinators1/25/2011
RSAW IRO-017-1_2017_v4.docxIRO-017-1Outage Coordination3/10/2017
RSAW MOD-001-1a (September 2011).docxMOD-001-1aAvailable Transmission System Capability10/16/2011
RSAW MOD-008-1 (September 2011).docxMOD-008-1Transmission Reliability Margin Calculation Methodology10/16/2011
RSAW MOD-012-0 (January 2011).docxMOD-012-0Dynamics Data for Transmission System Modeling and Simulation1/25/2010
RSAW MOD-017-0.1 (January 2011).docxMOD-017-0.1Aggregated Actual and Forecast Demands and Net Energy for Load1/25/2011
RSAW MOD-019-0.1 (January 2011).docxMOD-019-0.1Forecasts of Interruptible Demands and DCLM Data1/25/2011
RSAW MOD-021-1 (September 2011).docxMOD-021-1Documentation of the Accounting Methodology for the Effects of Demand-Side Management in Demand and Energy Forecasts10/16/2011
RSAW MOD-026-1_2014_v2.docxMOD-026-1Verification of Models and Data for Generator Excitation Control System or Plant Volt/Var Control Functions9/27/2018
RSAW MOD-028-2 October 2013.docxMOD-028-2Area Interchange Methodology10/10/2013
RSAW MOD-029-2a_2016_v1.docxMOD-029-2aRated System Path Methodology11/3/2016
RSAW MOD-030-3_2016_v1.docxMOD-030-3Flowgate Methodology11/7/2016
RSAW MOD-031-3_2021_v1.docxMOD-031-3Demand and Energy Data3/18/2021
RSAW MOD-033-1_2017_v1.docxMOD-033-1 Steady-State and Dynamic System Model Validation4/7/2017
RSAW NUC-001-2.1_April_2014.docxNUC-001-2.1Nuclear Plant Interface Coordination4/24/2014
RSAW NUC-001-4_2021_v1.docxNUC-001-4Nuclear Plant Interface Coordination3/18/2021
RSAW PER-003-1_2013_v1.docxPER-003-1Operating Personnel Credentials1/23/2013
RSAW PER-004-2 (September 2011).docxPER-004-2Reliability Coordination - Staffing10/16/2011
RSAW PER-006_1_2021_v1.docxPER-006-1Specific Training for Personnel3/18/2021
RSAW PRC-002-2_2016_v4.docxPRC-002-2Disturbance Monitoring and Reporting Requirements2/19/2016
RSAW PRC-004-5(i)_2016_v1.docxPRC-004-5(i)Protection System Misoperation Identification and Correction11/3/2016
RSAW PRC-005-1.1b_2014_v2.4.docxPRC-005-1.1bTransmission and Generation Protection System Maintenance and Testing10/28/2014
RSAW PRC-005-6_2016_v3.docxPRC-005-6Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance5/16/2016
RSAW PRC-006-5_2021_v1.docxPRC-006-5Automatic Underfrequency Load Shedding3/18/2021
RSAW PRC-010-0 (January 2011).docxPRC-010-0Assessment of the Design and Effectiveness of UVLS Program1/25/2011
RSAW PRC-011-0 (January 2011).docxPRC-011-0UVLS System Maintenance and Testing1/25/2011
RSAW PRC-015-0 (January 2011).docxPRC-015-0Special Protection System Data and Documentation1/25/2011
RSAW PRC-016-0.1 (January 2011).docxPRC-016-0.1Special Protection System Misoperations1/25/2011
RSAW PRC-017-0 (January 2011).docxPRC-017-0Special Protection System Maintenance and Testing1/25/2011
RSAW PRC-018-1 (January 2011).docxPRC-018-1Disturbance Monitoring Equipment Installation and Data Reporting1/25/2011
RSAW PRC-021-1 (January 2011).docxPRC-021-1Undervoltage Load Shedding Program Data1/25/2011
RSAW PRC-023-2_2013_v1.2.docxPRC-023-2Transmission Relay Loadability10/10/2013
RSAW PRC-023-4_2016_v1.docxPRC-023-4Transmission Relay Loadability11/3/2016
RSAW PRC-025-2_2018_v1.docxPRC-025-2Generator Relay Loadability8/21/2018
RSAW PRC-027-1_2019_v1.docxPRC-027-1Coordination of Protection System Performance During Faults6/18/2019
RSAW TOP-001-3_2017_v6.docxTOP-001-3Transmission Operations5/24/2017
RSAW TOP-001-5_2021_v1.docxTOP-001-5Transmission Operations3/18/2021
RSAW TOP-002-4_2017_v3.docxTOP-002-4Operations Planning1/20/2017
RSAW TOP-003-3.docxTOP-003-3Operational Reliability Data10/13/2016
RSAW TOP-004-2_September_2011.docxTOP-004-2Transmission Operations10/16/2011
RSAW TOP-006-2_March 2014.docxTOP-006-2Monitoring System Conditions3/20/2014
RSAW TOP-008-1 (January 2011).docxTOP-008-1Response To Transmission Limit Violations1/25/2011
RSAW TPL-001-0.1 (January 2011).docxTPL-001-0.1System Performance Under Normal Conditions1/25/2011
RSAW TPL-002-0b_March 2014.docxTPL-002-0b System Performance Following Loss of a Single Bulk Electric System Element (Category B)3/20/2014
RSAW TPL-004-0a_March 2014.docxTPL-004-0aSystem Performance Following Extreme Events Resulting in the Loss of Two or More Bulk Electric System Elements (Category D)3/20/2014
RSAW TPL-007-3_2019_v1.docxTPL-007-3Transmission System Planned Performance for Geomagnetic Disturbance Events5/2/2019
RSAW VAR-001-4.2_2017_v1.docxVAR-001-4.2Voltage and Reactive Control11/29/2017
RSAW VAR-002-4.1_2017_v1.docxVAR-002-4.1Generator Operation for Maintaining Network Voltage11/29/2017
expand Header : Resource Documents ‎(2)
NERC Reliability Standard Audit Worksheet (RSAW) Review and Revision Process.pdf1.1NERC Reliability Standard Audit Worksheet (RSAW) Review and Revision Process3/6/2018